Technical Office Manager
ARBEC
مجموع سنوات الخبرة :4 years, 5 أشهر
Infrastructure projects and Construction projects (RC and Finishing Works)
Responsibility:
• Preparing material, equipment and man power requirements listbased on project priorities and time schedule.
• Preparing the necessary documents, analyzing prices, and inventorying quantities for new items outside the scope of the contract.
• Responsible for the projects coordination and matching project plates.
• Re-design when submitting a proposal to change some construction details during implementation.
• Preparing Shop drawings and as built drawings.
• preparing Quantity Surveying (QS) of the items implemented over the project period.
• preparing the owners invoices and subcontractors invoices
• Monitoring implementation costs throughout the project period
• Monitor project procurement regarding the quality of materials required for the project.
• Submit daily reports on progress or delays in work to the Head Managers.
Construction projects ( RC and Finishing works)
Responsibility:
• The ability to find practical and economical solutions for different architectural designs.
• Design structural elements based on rated loads.
• Ability to work on various design programs.
• Perform structural analysis of pre-designed elements.
• Inspect existing structures and recommend repair or replacement of defective structural elements.
• Investigate the causes of structural failure.
• Oversee construction projects and ensure structures are built correctly.
• Review the quality of all materials on site and ensure compliance with all project specifications and quality.
• Preparing documents and reports specialized in engineering works and projects, their progress rates, displaying them, clarifying them, and keeping them in the special database
Haya Karima Projects, Farafra Center, New Valley Governorate, with 73
projects. ( Oct 2021- Mar 2023)
Haya Karima Projects, Saqulta Center, Suhag Governorate, with 141 projects. (Apr 2021- Sep 2021)
These projects are about.
Infrastructure projects and Construction projects ( RC and Finishing Works ) Responsibility:
• Thoughtful Planning and knowing all the Systematic plans for this project and clarifying them to all companies and ensuring that the project is implemented in accordance with this planning.
• Preparing material, equipment and man power requirements listbased on project priorities and time schedule.
• Conducting all contacts and continuous follow-up with the competent authorities to evaluate and solve any problems arising during construction for the benefit of the project.
• Supervising Contractors and workers to ensure the application of allsafety and quality requirements in all site activities, monitoring the site workforce and reviewing worker productivity rates.
• Review Quality of all materials at site and ensure compliance to all project specification and quality.
• Develop and determine all standards to perform inspection and teston all producers and oversee all testing methods, and maintain highstandards of quality for all processes.
• preparing Quantity Surveying (QS) of the items implemented over the project period.
• preparing the owners invoices and subcontractors invoices
• Submit daily reports on progress or delays in work to the Head Managers.
New Giza Community Hospital
Al Jabali Towers in Kafr El Sheikh.
Emergency Hospital in kafr El Sheikh University.
Preparing As built drawings, Quantity Surveying ( QS )
Conference Hall in kafr El Sheikh University.
The preliminary stage has been completed and work is underway on the Research Paper.
Graduation Project in: Design of Reinforced Concrete Structures. Grade, Excellent.