Mussa EL-saied EL-saied Abdel gawad NWER, Site construction engineer

Mussa EL-saied EL-saied Abdel gawad NWER

Site construction engineer

Construction companies

Location
Egypt
Education
Bachelor's degree, Site engineer
Experience
14 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :14 years, 8 Months

Site construction engineer at Construction companies
  • Egypt - Alexandria
  • My current job since October 2009

Works as a Site Engineer at (Misalla Company) for Insulation Industries in the project of (EL-TEBBIN thermal power plant( in PGESCO Site in Helwan from 10/2009 to 12/2009.

- Works as a QC Engineer at (Misalla Company) for Insulation Industries in the project of (EL-TEBBIN thermal power plant ) in PGESCO Site in Helwan from 12/2009 to 4/2010.

- Works as a Site Manager at (Misalla Company) for Insulation Industries in the project of (EL-TEBBIN thermal power plant ) in PGESCO Site in Helwan from 4/2010 to 6/2010.

- Works as a QC Engineer at (Misalla Company) for Insulation Industries in the project of (Maximization of ethane & propane from western desert fields) in GASCO Site in Alexandria from 6/2010 to 10/2010.

- Works as a QC Engineer at (Misalla Company) for Insulation Industries in the project of (Compressor Package (New Feed) in GASCO Site in Alexandria from 10/2011 To 6/2011.

- Works as a Site engineer at (Misalla Company) for Insulation Industries in the project of (Styrenics Production Company) (E_ styrenics ) Site in Port Alexandria Egypt from 7/2011 To 3/2013 .

- Works as QA Engineer at (Misalla Company) for insulation industries in set up the required procedures to obtain ISO 9001 & ISO 14001 & 18001 certificate renewal from 10/2010 To 3/2013.

- Works as a Site engineer at (Engineering company office) for sanding and paint in the project of (Port of Ras figs Navy of the Egyptian armed forces brigade destroyers) (Ship destroyers) Site in Port Alexandria Egypt from 3/2011 To 4/2013.

- Site engineer in the company Yassin Al-Sammak thermal insulation in the period from 27/03/2013 to 25/7/2013.

- Site manager in the engineering firm for thermal Installation of black Steel pipe and industrial services in- Mall Crvor - City Light - Alexandria soles of the contractor (Siemens) in the period From 1/8/2013 to 1/2/2014 .

- Site manager in the engineering firm for insulation and industrial services in- Mall Crvor - City Light - Alexandria soles of the contractor (Siemens) in the period From 1/2/2014 to 1/5/2014 .

- Works as a Site engineer at (xervon) for insulation in the project of (east del ta electricity production company - el ain el sokhna supercritical thermal power plant units 1&2 2*650 mw gas/oil fired units ) from 5/5//2014 to 30/8/2014 .

- Works as a Site manager at (xervon Company) for Insulation Industries in the project of (Sidi Krier thermal power plant( in PGESCO Site in Alexandria from 1/9/2014 to 1/11/2014 .

- Works as a Site engineer at (ISO TERMICA Company) for Insulation Industries in the project of (Giza North Power Station Insulation Works for 6 Boilers ( in PGESCO Site in Giza from 5/11/2014 to yet .

Site construction engineer at Construction companies
  • Egypt - Alexandria
  • My current job since October 2009

All works thermal insulation (hot - cold - the voice - for central air conditioning duct work) for petrol stations and fertilizer, electricity and energy

1 - rock wool: 2 - glass wool: 3 - Ceramic Fiber

4 - Calcium Silicate 5 - Berlet 6 - Foam Glass

7 - Armagh Flex 8 - Poly Polyurethane Foam


- Read board sites (P & ID _ ISOMETRIC_ panel CAD).

- Inventory quantities

- Work schedules to determine the works end dates

Site construction engineer at Construction companies
  • Egypt - Alexandria
  • My current job since September 2009

All works thermal insulation (hot - cold - the voice - for central air conditioning duct work) for petrol stations and fertilizer, electricity and energy

1 - rock wool: - 2 - glass wool: - 3 - Ceramic Fiber
4 - Calcium Silicate 5 - Berlet 6 - Foam Glass
7 - Armagh Flex 8 - Poly Polyurethane Foam

- Read board sites (P & ID _ ISOMETRIC_ panel CAD).
- Inventory quantities
- Work schedules to determine the business end dates

Site engineer at Construction companies
  • Egypt - Alexandria
  • My current job since September 2009

- Works as a Site Engineer at (Misalla Company) for Insulation Industries in the project of (EL-TEBBIN thermal power plant( in PGESCO Site in Helwan from 10/2009 to 12/2009.

- Works as a QC Engineer at (Misalla Company) for Insulation Industries in the project of (EL-TEBBIN thermal power plant ) in PGESCO Site in Helwan from 12/2009 to 4/2010.

- Works as a Site Manager at (Misalla Company) for Insulation Industries in the project of (EL-TEBBIN thermal power plant ) in PGESCO Site in Helwan from 4/2010 to 6/2010.

- Works as a QC Engineer at (Misalla Company) for Insulation Industries in the project of (Maximization of ethane & propane from western desert fields) in GASCO Site in Alexandria from 6/2010 to 10/2010.
- Works as a QC Engineer at (Misalla Company) for Insulation Industries in the project of (Compressor Package (New Feed) in GASCO Site in Alexandria from 10/2011 To 6/2011.

- Works as a Site engineer at (Misalla Company) for Insulation Industries in the project of (Styrenics Production Company) (E_ styrenics ) Site in Port Alexandria Egypt from 7/2011 To 3/2013 .

- Works as QA Engineer at (Misalla Company) for insulation industries in set up the required procedures to obtain ISO 9001 & ISO 14001 & 18001 certificate renewal from 10/2010 To 3/2013.

- Works as a Site engineer at (Engineering company office) for sanding and paint in the project of (Port of Ras figs Navy of the Egyptian armed forces brigade destroyers) (Ship destroyers) Site in Port Alexandria Egypt from 3/2011 To 4/2013.

- Site engineer in the company Yassin Al-Sammak thermal insulation in the period from 27/03/2013 to 25/7/2013.

- Site manager in the engineering firm for thermal Installation of black Steel pipe and industrial services in- Mall Crvor - City Light - Alexandria soles of the contractor (Siemens) in the period From 1/8/2013 to 1/2/2014 .

- Site manager in the engineering firm for insulation and industrial services in- Mall Crvor - City Light - Alexandria soles of the contractor (Siemens) in the period From 1/2/2014 to 1/5/2014

- Works as a Site engineer at (xervon) for insulation in the project of (east del ta electricity production company - el ain el sokhna supercritical thermal power plant units 1&2 2*650 mw gas/oil fired units ) from 5/5//2014 to 30/8/2014 .

- Works as a Site manager at (xervon Company) for Insulation Industries in the project of (Sidi Krier thermal power plant( in PGESCO Site in Alexandria from 1/9/2014 to 1/11/2014 .

- Works as a Site engineer at (ISO TERMICA Company) for Insulation Industries in the project of (Giza North Power Station Insulation Works for 6 Boilers ( in PGESCO Site in Giza from 5/11/2014 to yet .

Education

Bachelor's degree, Site engineer
  • at Egyptian University of Management Sciences and Technology
  • August 2009

Egyptian University of Management Sciences and Technology - Alexandria. - With grade good - Graduation Year: 2009 - Graduation Project: Theoretical study & application of modern quality systems. - Graduation Project Grade: Excellent

Bachelor's degree, Egyptian University of Management Sciences and Technology
  • at Egyptian University of Management Sciences and Technology
  • June 2009

All that is related to technology in all areas of Next Mechanics production Commends the building Oil Electricity Designs Engineering More environmentally Product

Specialties & Skills

Execution Skills
Team Management
Insulation
Office Work
Computer Science
BOILERS
Dealing with crises and work under pressure
Technical knowledge points and extract defects and processed while working
ENGINEER
MICROSOFT OFFICE
PETROLEUM
PROJECT MANAGER

Languages

English
Expert
Arabic
Expert

Memberships

www.isotermica-eg.com
  • Construction site engineer
  • December 2014

Training and Certifications

Training has been successfully increased by 85% (Certificate)
Date Attended:
January 2010
Valid Until:
August 2010
Degree in the computer programs, degree in develop procedures the ISO (Certificate)
Date Attended:
February 2008
Valid Until:
December 2008

Hobbies

  • Play ball, swimming and Sports: Martial arts and fitness
    ALEXANDRIA fourth place in the self-defense Games First republic in games Edvaa self Player pool Football player defense Fitness Chess player