موسى السيد السيد محمد عبد الجواد نوير, Site construction engineer

موسى السيد السيد محمد عبد الجواد نوير

Site construction engineer

Construction companies

البلد
مصر
التعليم
بكالوريوس, Site engineer
الخبرات
14 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 9 أشهر

Site construction engineer في Construction companies
  • مصر - الإسكندرية
  • أشغل هذه الوظيفة منذ أكتوبر 2009

Works as a Site Engineer at (Misalla Company) for Insulation Industries in the project of (EL-TEBBIN thermal power plant( in PGESCO Site in Helwan from 10/2009 to 12/2009.

- Works as a QC Engineer at (Misalla Company) for Insulation Industries in the project of (EL-TEBBIN thermal power plant ) in PGESCO Site in Helwan from 12/2009 to 4/2010.

- Works as a Site Manager at (Misalla Company) for Insulation Industries in the project of (EL-TEBBIN thermal power plant ) in PGESCO Site in Helwan from 4/2010 to 6/2010.

- Works as a QC Engineer at (Misalla Company) for Insulation Industries in the project of (Maximization of ethane & propane from western desert fields) in GASCO Site in Alexandria from 6/2010 to 10/2010.

- Works as a QC Engineer at (Misalla Company) for Insulation Industries in the project of (Compressor Package (New Feed) in GASCO Site in Alexandria from 10/2011 To 6/2011.

- Works as a Site engineer at (Misalla Company) for Insulation Industries in the project of (Styrenics Production Company) (E_ styrenics ) Site in Port Alexandria Egypt from 7/2011 To 3/2013 .

- Works as QA Engineer at (Misalla Company) for insulation industries in set up the required procedures to obtain ISO 9001 & ISO 14001 & 18001 certificate renewal from 10/2010 To 3/2013.

- Works as a Site engineer at (Engineering company office) for sanding and paint in the project of (Port of Ras figs Navy of the Egyptian armed forces brigade destroyers) (Ship destroyers) Site in Port Alexandria Egypt from 3/2011 To 4/2013.

- Site engineer in the company Yassin Al-Sammak thermal insulation in the period from 27/03/2013 to 25/7/2013.

- Site manager in the engineering firm for thermal Installation of black Steel pipe and industrial services in- Mall Crvor - City Light - Alexandria soles of the contractor (Siemens) in the period From 1/8/2013 to 1/2/2014 .

- Site manager in the engineering firm for insulation and industrial services in- Mall Crvor - City Light - Alexandria soles of the contractor (Siemens) in the period From 1/2/2014 to 1/5/2014 .

- Works as a Site engineer at (xervon) for insulation in the project of (east del ta electricity production company - el ain el sokhna supercritical thermal power plant units 1&2 2*650 mw gas/oil fired units ) from 5/5//2014 to 30/8/2014 .

- Works as a Site manager at (xervon Company) for Insulation Industries in the project of (Sidi Krier thermal power plant( in PGESCO Site in Alexandria from 1/9/2014 to 1/11/2014 .

- Works as a Site engineer at (ISO TERMICA Company) for Insulation Industries in the project of (Giza North Power Station Insulation Works for 6 Boilers ( in PGESCO Site in Giza from 5/11/2014 to yet .

Site construction engineer في Construction companies
  • مصر - الإسكندرية
  • أشغل هذه الوظيفة منذ أكتوبر 2009

All works thermal insulation (hot - cold - the voice - for central air conditioning duct work) for petrol stations and fertilizer, electricity and energy

1 - rock wool: 2 - glass wool: 3 - Ceramic Fiber

4 - Calcium Silicate 5 - Berlet 6 - Foam Glass

7 - Armagh Flex 8 - Poly Polyurethane Foam


- Read board sites (P & ID _ ISOMETRIC_ panel CAD).

- Inventory quantities

- Work schedules to determine the works end dates

Site construction engineer في Construction companies
  • مصر - الإسكندرية
  • أشغل هذه الوظيفة منذ سبتمبر 2009

All works thermal insulation (hot - cold - the voice - for central air conditioning duct work) for petrol stations and fertilizer, electricity and energy

1 - rock wool: - 2 - glass wool: - 3 - Ceramic Fiber
4 - Calcium Silicate 5 - Berlet 6 - Foam Glass
7 - Armagh Flex 8 - Poly Polyurethane Foam

- Read board sites (P & ID _ ISOMETRIC_ panel CAD).
- Inventory quantities
- Work schedules to determine the business end dates

Site engineer في Construction companies
  • مصر - الإسكندرية
  • أشغل هذه الوظيفة منذ سبتمبر 2009

- Works as a Site Engineer at (Misalla Company) for Insulation Industries in the project of (EL-TEBBIN thermal power plant( in PGESCO Site in Helwan from 10/2009 to 12/2009.

- Works as a QC Engineer at (Misalla Company) for Insulation Industries in the project of (EL-TEBBIN thermal power plant ) in PGESCO Site in Helwan from 12/2009 to 4/2010.

- Works as a Site Manager at (Misalla Company) for Insulation Industries in the project of (EL-TEBBIN thermal power plant ) in PGESCO Site in Helwan from 4/2010 to 6/2010.

- Works as a QC Engineer at (Misalla Company) for Insulation Industries in the project of (Maximization of ethane & propane from western desert fields) in GASCO Site in Alexandria from 6/2010 to 10/2010.
- Works as a QC Engineer at (Misalla Company) for Insulation Industries in the project of (Compressor Package (New Feed) in GASCO Site in Alexandria from 10/2011 To 6/2011.

- Works as a Site engineer at (Misalla Company) for Insulation Industries in the project of (Styrenics Production Company) (E_ styrenics ) Site in Port Alexandria Egypt from 7/2011 To 3/2013 .

- Works as QA Engineer at (Misalla Company) for insulation industries in set up the required procedures to obtain ISO 9001 & ISO 14001 & 18001 certificate renewal from 10/2010 To 3/2013.

- Works as a Site engineer at (Engineering company office) for sanding and paint in the project of (Port of Ras figs Navy of the Egyptian armed forces brigade destroyers) (Ship destroyers) Site in Port Alexandria Egypt from 3/2011 To 4/2013.

- Site engineer in the company Yassin Al-Sammak thermal insulation in the period from 27/03/2013 to 25/7/2013.

- Site manager in the engineering firm for thermal Installation of black Steel pipe and industrial services in- Mall Crvor - City Light - Alexandria soles of the contractor (Siemens) in the period From 1/8/2013 to 1/2/2014 .

- Site manager in the engineering firm for insulation and industrial services in- Mall Crvor - City Light - Alexandria soles of the contractor (Siemens) in the period From 1/2/2014 to 1/5/2014

- Works as a Site engineer at (xervon) for insulation in the project of (east del ta electricity production company - el ain el sokhna supercritical thermal power plant units 1&2 2*650 mw gas/oil fired units ) from 5/5//2014 to 30/8/2014 .

- Works as a Site manager at (xervon Company) for Insulation Industries in the project of (Sidi Krier thermal power plant( in PGESCO Site in Alexandria from 1/9/2014 to 1/11/2014 .

- Works as a Site engineer at (ISO TERMICA Company) for Insulation Industries in the project of (Giza North Power Station Insulation Works for 6 Boilers ( in PGESCO Site in Giza from 5/11/2014 to yet .

الخلفية التعليمية

بكالوريوس, Site engineer
  • في Egyptian University of Management Sciences and Technology
  • أغسطس 2009

Egyptian University of Management Sciences and Technology - Alexandria. - With grade good - Graduation Year: 2009 - Graduation Project: Theoretical study & application of modern quality systems. - Graduation Project Grade: Excellent

بكالوريوس, Egyptian University of Management Sciences and Technology
  • في Egyptian University of Management Sciences and Technology
  • يونيو 2009

All that is related to technology in all areas of Next Mechanics production Commends the building Oil Electricity Designs Engineering More environmentally Product

Specialties & Skills

Execution Skills
Team Management
Insulation
Office Work
Computer Science
BOILERS
Dealing with crises and work under pressure
Technical knowledge points and extract defects and processed while working
ENGINEER
MICROSOFT OFFICE
PETROLEUM
PROJECT MANAGER

اللغات

الانجليزية
متمرّس
العربية
متمرّس

العضويات

www.isotermica-eg.com
  • Construction site engineer
  • December 2014

التدريب و الشهادات

Training has been successfully increased by 85% (الشهادة)
تاريخ الدورة:
January 2010
صالحة لغاية:
August 2010
Degree in the computer programs, degree in develop procedures the ISO (الشهادة)
تاريخ الدورة:
February 2008
صالحة لغاية:
December 2008

الهوايات

  • Play ball, swimming and Sports: Martial arts and fitness
    ALEXANDRIA fourth place in the self-defense Games First republic in games Edvaa self Player pool Football player defense Fitness Chess player