مجموع سنوات الخبرة: 12 سنوات, 5 أشهر
مارس 2017
إلى حتى الآن
Senior Electrical Engineer
في National Contracting Company NCC
البلد :
مصر - القاهرة
A‐General:
Working with the assistance of Civil and Architecture Subcontractor on the
Substation General Layout.
Designation of the Cable raceways
Performing the Earthing Calculation for the Substation
Designing the Substation Earthing Grid
Designing the Shielding from the Lightning for the substation
Preparation the Bill of Quantity for all of above
Preparing all RFQ of Electrical Installations and Suppliers.
Supplier inspection for different material testing and reviewing.
Site Inspection for insuring and explanation of different submittals.
B‐Projects:
Assuit Super Critical Power Plant 1 X 650 MW‐ 500kV GIS Switchyard
Working with the assistance of Civil and Architecture Subcontractor on the
Substation General Layout.
Designation of the Cable raceways
Performing the Earthing Calculation for the Substation
Designing the Substation Earthing Grid
Designing the Shielding from the Lightning for the substation
Preparation the Bill of Quantity for all of above
Preparing all RFQ of Electrical Installations and Suppliers.
Supplier inspection for different material testing and reviewing.
Site Inspection for insuring and explanation of different submittals.
B‐Projects:
Assuit Super Critical Power Plant 1 X 650 MW‐ 500kV GIS Switchyard
مارس 2016
إلى مارس 2017
Design Engineer
في ElSewedy PSP
البلد :
مصر - القاهرة
A‐General:
Working with the assistance of Civil and Architecture departments on the
Substation General Layout
Designation of the Cable raceways of the H.V. and M.V. cables for the Substation
Designation of the raceways for the Control cables
Performing the Earthing Calculation for the Substation
Designing the Substation Earthing Grid
Designing the Shielding from the Lightning for the substation
Preparation the Bill of Quantity for all of above
Create 3D model for the Raceway by using Different Software.
Site Inspection for insuring and explanation of different submittals.
Supplier inspection for different material testing and reviewing.
B‐Projects Achieved:
Bani Suef Combined Cycle Power Plant (4800MW).
Manshiat Nasser 220/66/11KV substation.
Working with the assistance of Civil and Architecture departments on the
Substation General Layout
Designation of the Cable raceways of the H.V. and M.V. cables for the Substation
Designation of the raceways for the Control cables
Performing the Earthing Calculation for the Substation
Designing the Substation Earthing Grid
Designing the Shielding from the Lightning for the substation
Preparation the Bill of Quantity for all of above
Create 3D model for the Raceway by using Different Software.
Site Inspection for insuring and explanation of different submittals.
Supplier inspection for different material testing and reviewing.
B‐Projects Achieved:
Bani Suef Combined Cycle Power Plant (4800MW).
Manshiat Nasser 220/66/11KV substation.
أبريل 2014
إلى فبراير 2016
Design Engineer
في Jawda Engineering Consultant
البلد :
مصر - القاهرة
A‐General:
Working with the assistance of Civil and Architecture departments on the
Substation General Layout
Designation of the raceways of the H.V. and M.V. cables for the Substation
Designation of the raceways for the Control cables
Performing the Earthing Calculation for the Substation
Designing the Substation Earthing Grid
Designing the Shielding from the Lightning for the substation
Preparation the Bill of Quantity for all of above
B‐Projects Achieved:
AL‐MOTAMARAT S/S 110/13.8 KV (western)
MODON‐2 S/S 110/33/13.8 KV (western)
Al‐LAITH s/s 110/13.8 KV (western)
ADAM S/S 110/33 KV (western)
SUFFA S/S and RUFFIDAH S/S Extensions (southern)
MUNA‐4 S/S 110/13.8KV (western)
C‐Projects Involved In:
Gulf Salman 110/13.8KV (western)
Jeddah Seaport 110/13.8KV (western)
Dahart Allban 132/13.8KV (Central)
Mokhtarah 110/33KV/13.8KV (Southern)
Najran 110/33KV/13.8KV (Southern)
Sised extension 110/13.8KV (western)
Uqlat Al‐soqor Reinforcement 110/13.8KV (Central)
Al‐Naga extension 110/13.8KV (western)
Working with the assistance of Civil and Architecture departments on the
Substation General Layout
Designation of the raceways of the H.V. and M.V. cables for the Substation
Designation of the raceways for the Control cables
Performing the Earthing Calculation for the Substation
Designing the Substation Earthing Grid
Designing the Shielding from the Lightning for the substation
Preparation the Bill of Quantity for all of above
B‐Projects Achieved:
AL‐MOTAMARAT S/S 110/13.8 KV (western)
MODON‐2 S/S 110/33/13.8 KV (western)
Al‐LAITH s/s 110/13.8 KV (western)
ADAM S/S 110/33 KV (western)
SUFFA S/S and RUFFIDAH S/S Extensions (southern)
MUNA‐4 S/S 110/13.8KV (western)
C‐Projects Involved In:
Gulf Salman 110/13.8KV (western)
Jeddah Seaport 110/13.8KV (western)
Dahart Allban 132/13.8KV (Central)
Mokhtarah 110/33KV/13.8KV (Southern)
Najran 110/33KV/13.8KV (Southern)
Sised extension 110/13.8KV (western)
Uqlat Al‐soqor Reinforcement 110/13.8KV (Central)
Al‐Naga extension 110/13.8KV (western)
أكتوبر 2011
إلى مارس 2014
Officer
في Armed Forces
البلد :
مصر - القاهرة
Worked at the Armed Forces for the Air Defense Forces for two years as an
Officer (October 2011 March 2014)
Duties Executed:
1‐ Managerial handling of soldiers
2‐ Maintenance of Electrical control systems
Officer (October 2011 March 2014)
Duties Executed:
1‐ Managerial handling of soldiers
2‐ Maintenance of Electrical control systems
انشر على فيسبوك
انشر على تويتر
مشاركة عبر البريد الإلكتروني