*Projects
1- NILE CORNICH PROJECT - ST. REGIS NILE CORNICHE
2-SWAN LAKE NORTH COAST
3-SOLEYA GIZA
4-OPEN AIR MALL MADIENTY
5-Four Seasons Sharm El sheikh

• JOB Description :
• Develops project objectives by reviewing project proposals and plans; conferring with management.
• Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates.
• Confirms product performance by designing and conducting tests.
• Maintains project schedule by monitoring project progress; coordinating activities; resolving problems.
• Controls project plan by reviewing design, specifications, and plan and schedule changes; recommending actions.
• Controls project costs by approving expenditures; administering contractor contracts.
• Prepares project status reports by collecting, analyzing, and summarizing information and trends; recommending actions.
• Managing, monitoring and review the contract design documents supplied by the client or architect
• Communicating with clients and their representatives (architects, engineers) including attending regular meetings to keep them informed of our progress and set plans due to site priorities and time schedule

Executive Architecture Site engineer à Orascom Constraction
  • Egypte - Le Caire
  • septembre 2014 à mai 2016

Project Description
Project: Mall Of Egypt ( Majid El Fattuim ) 6th Of Octoubr
Total GLA : 162, 500 M2 ( 2 levels ) - 400 Shops



A- Worked as a Architecture Site Engineer: (Responsible Of All Finishes work At Mall Roof

Work Descrption
Responsible Of All Isolation work at Roof with the New Method in EGYPT
( COMBO SYSTEM ISOLATION )

Responsible Of All Finishes Work at all Service Rooms ( ETS ROOMS - ELC ROOMS - SUBSTATION ROOMS )

Coordinates With Mechanical & Electrical

* Review drawings for correctness and clarity of information and take necessary action to ensure sufficient information is available, Monitor and ensure that only current / latest revisions of Issued for Construction drawings are being used, and withdraw all superseded drawings from site.

*. Record and maintain daily site events.

*. Site supervision to ensure Work carried out on site is in accordance with:
• Drawing and specification
• Construction programmers
• Method Statements
• To report any technical issues to the Section Engineer

⦁ Work At SKI EGYPT :

Worked as a Architecture Site Engineer at SKI worm area ( SKI Entrance )

-Responsible Of All Finishes work At SKI Worm area ( wood cladding - marble - fall celling - gypsum board - painting - screed finish )

-Coordinates With Mechanical & Electrical

Planning Engineer à Samcrete Engineers&contractors
  • Egypte - Le Caire
  • août 2013 à septembre 2014

1-Plan and schedule the project by developing a project master schedule in line with the proposal requirements through the application of the primavera p6 software

2-Indentify the project deliverables, milestone, and the required tasks and targets to determine the staffing requirements, and allotment of available resources to various phases of the project through the project measurement system

3-Implement the work schedule and monitor the progress of the work for timely execution of the project to review of the overal project

4-Progress monitoring of specific projects on a regular basis. Anticipate and resolve any problems bottlenecks scheduling conflicts. Prepare and maintain package work plans and monitor progress to achieve on time or earlier deliveries to keep the project on schedule

Executive Architecture Site engineer à samcrete engineers & contractors
  • Egypte - Le Caire
  • août 2012 à août 2013

A- Worked as a site engineer:

about 3 months Responsible of all under ground work in concrete work ( back filling- masonry work - isolate work )

1. Responsible for Architecture Designer.
2. Responsible for Architecture Finishing works in Site (Plaster-Marble-Porcelain tile)
3. Responsible of designing the company brochures, banners and artworks.
4. Review drawings for correctness and clarity of information and take necessary action to ensure sufficient information is available, Monitor and ensure that only current / latest revisions of Issued for Construction drawings are being used, and withdraw all superseded drawings from site.
5. Record and maintain daily site events.
6. Site supervision to ensure Work carried out on site is in accordance with:
• Drawing and specification
• Construction programmers
• Method Statements
• To report any technical issues to the Section Engineer
7. Monitor progress of work against Construction programmed to ensure that the progress is in accordance to the Construction Programmed

8. Monitor, control, and coordinate the works of different trade subcontractors and report on their progress and or trends for problems / delays to Section Engineer.
9. Ensure that no work is submitted for inspection unless it is complete and complies with all specified requirements.
10. Addresses all encountered/preventive problems with my Foreman/Section Engineer.
11. Ensures that only approved materials are used.

trainer à Orascom Hotels & Development
  • Egypte - Le Caire
  • septembre 2011 à octobre 2011

Design & Destination Planning Department

trainer à Arabcont ( المقاولون العرب )
  • Egypte - Le Caire
  • juillet 2010 à août 2010

Project buildings and residential towers and green areas

مشروع مباني وابراج سكنية ومساحات خضراء بجانب المركز الصحي للمقاولون العرب

trainer à Arab cont المقولون العرب
  • Egypte - Le Caire
  • juillet 2009 à août 2009

project of 1000 bed hospital

Éducation

Etudes secondaires ou équivalent, Contract Administration For Project Managers
  • à American University at Cairo
  • mai 2019

This program covers the fundamentals of contract management. The objective of this program is to provide participants with the knowledge they need to apply essential contract management concepts, deal with contractual changes and challenges, and check the impact of decisions and variances on project outcomes. -COURSE MATERIAL * Contract Management Essentials * Preparation for Claimsmanship * International Contract and Domestic Law * Contract Administration *Project Procurement Management *Effective Contracts Management

Etudes secondaires ou équivalent, Project Management ( PRMG )
  • à American University At Cairo
  • février 2016

*PRMG-Certified Project Management Planning & Control Technique (PRMG - 010) Jan - May 2015 *PRMG-Certified Project Management International Standards (PRMG - 025) Jan - May 2015 *PRMG- Management of Project Resources (PRMG - 020) Sep - Dec 2015 *PRMG - Risk Management (PRMG - 095) Sep - Dec 2015 *PRMG-Certified Project Management Project Commutation Management ( PRMG-045 ) Jan 2016 - May 2016 *PRMG- Project Management Project Bids & Contract ( PRMG-045 ) Jan 2016 - May 2016

Baccalauréat, هندسة معمارية
  • à Modern Academy for Engineering ana technology
  • août 2012

• Bachelor degree of Architecture Engineering, department, 2012 - Modern Academy for Engineering & Technology, Faculty of Engineering, Egypt. Graduation project: " Draft tourist village hospital in Siwa "

Specialties & Skills

Site Plans
Planing
AutoCAD
Microsoft Office
ARCHITECTURAL
AUTO CAD
AUTODESK
CONSTRUCTION ENGINEERING
MICROSOFT OFFICE
MS EXCEL
MS OFFICE
MS WORD
Photoshop program
Google sketch up
Revit Architecture
planing

Langues

Arabe
Expert
Anglais
Expert

Adhésions

Federation of arab engineers
  • Arcitect engineer
  • July 2012
Egyptian syndicate of engineers
  • Architect engineer
  • July 2012

Formation et Diplômes

PRMG , Project Mangement . At American univrsity in cairo (Certificat)
Date de la formation:
February 2014
Valide jusqu'à:
January 9999
ICDL (International Computer Driving Licence ) Syllabus Version 4.0 (Certificat)
Date de la formation:
July 2008
Valide jusqu'à:
August 2008
Revit Architecture Course from Auto Desk (Certificat)
Date de la formation:
August 2012
Valide jusqu'à:
September 2012
- AutoCAD Course (Certificat)
Date de la formation:
July 2008
Valide jusqu'à:
August 2008
- 3Ds MAX - Architectural Course from Auto Desk (Certificat)
Date de la formation:
July 2011
Valide jusqu'à:
August 2011
Technological Institute of Construction Engineering and Management (Certificat)
Date de la formation:
July 2009
Valide jusqu'à:
July 2009
Orascom Hotels & Development – Design & Destination Planning Department (Certificat)
Date de la formation:
September 2010
Valide jusqu'à:
September 2010
Technological Institute of Construction Engineering and Management (Certificat)
Date de la formation:
July 2010
Valide jusqu'à:
July 2010

Loisirs

  • • Internet. • Reading. • Football • Traveling