إعداد المواصفات الفنية و جداول و مخططات المشروع في مجال الطاقة الشمسية و محطات توليد و نقل القدرة
Supervise all site construction works, inspection testing and start up, works include engineering reviewing
33KV over head power line EPCC project
Feb, 2012 to present Electrical/Instrument Superintendent
Project YGC ADDITIONAL LPG STORAGE AND LOADING
FACILITIES PHASE.1A (YLNG)
Contractor HAWK International Finance & Construction Co. Ltd
Duties Electrical and Instrument department in charge, construction
crews leading, engineering supervision to prepare and review the engineering documents such as bill of quantities, materials (BOQ),
Detailed Work Schedule, PID, shop drawing, As built, red mark up
Drawing, modification calculations, technical queries and the request for inspection (RFI). Conversant with the approved Health & Safety policies
/QA /QC procedures are implemented during inspection activities, Site
coordination with all among parties during the both construction and precommissioning, Final dossier documentation controlling and attend as a
Contactor representative on weekly Clint meetings.
To supervise site construction activites and ensure that all crews fullfilling the job as period client standards.
To prepare Engineering drawings and bill of quantities as well as carrying out lock capitulation
to prepare
Tender documents and as Tender analyzer for several projects
to carry out several duties such as: Tender preparing, administrator and product seller. Finally as Projects manager, however previously as a site engineer and a supervisor for erecting, commissioning and putting in work many rural projects ( 11/0.4 KV Generation and Overhead Transmission line ).
Master degree of project management professional
High Studies: Babylon University - Rep. of Iraq Faculty of Engineering Electrical Department Study period (1994 - 1998) Bachelor's Deg. Of Electrical Eng.