ahmed elgohary, Projects Manager

ahmed elgohary

Projects Manager

Greenland for food industries (Americana)

Location
Egypt
Education
Bachelor's degree, production & mechnical design Engineering
Experience
16 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 2 Months

Projects Manager at Greenland for food industries (Americana)
  • Egypt - Cairo
  • My current job since February 2017
Group Deputy Projects manager at Green Land for Food industries (Americana Group)
  • Egypt - Cairo
  • My current job since January 2016
• Assistant maintenance manager at Best Of France co. For dairy- LACTALES international
  • Egypt - Cairo
  • January 2014 to January 2016

responsible for ensuring that all equipment is maintained at a high degree of efficiency and reliability, providing supervision and direction to all personnel regarding maintenance process functions, that all necessary systems are in-place and functional for successful maintenance processes (including work order systems, planning & scheduling systems and preventive maintenance systems).

Also, responsible for:
- Mechanical maintenance in the plant of producing white cheese, yogurt, drinking yogurt, boding and cream cheese.
- Developing preventive maintenance plans for entire plant machineries.
- Ensure coordination with warehouse department on spare parts availability.
- resolving machinery breakdowns - periodic follow-up on all maintenance operations in all shifts to ensure uniformity of work.
- Developing reduction of costs methods allocated to the maintenance of machinery.
- Reporting according to the stated quality systems and HACCP and ISO in all maintenance stages.
- Review and approve regular reports on the progress of maintenance work and means to overcome technical issues.
- Evaluate employers’ performance.
- Advise the Community Works Engineers of required major repairs or replacements for all equipment .

Maintenance Manager at Halayeb
  • Egypt - Damietta
  • December 2008 to June 2012

Responsible for:
- Executing designs of American experts for production lines.
- Designing, drawing, and executing service lines (steam, water, compressed air, and refrigeration) as well as piping supports.
- Installation of piping networks (including fittings, valves, balancing devices, etc) and estimation of their quantities
- Designing and executing water and compressed air stations.
- Implementing steam station (in collaboration with Catec co.).
- Duct fabrication, hanger installation and hanger spacing
- Performing after- installing tests for machines.
- Complete knowledge of the equipment hookup, including chillers, pumps and fcus
- Installation of the TETRA PAK carton filling machines (TBA 8 & TPA 19)
- Programming control panels in collaboration with production and control management.
- preparing technical articles and statistics.
- Management of all works on site
- TETRA PAK maintenance and spare parts
- Make the annual preventive maintenance plan.
- Developing maintenance treatments.
- Arranging and coding for the spare parts inventory.
- Coding machine parts as well as the spare parts to ease maintenance procedures.
- Recording machine history.
- Preparing daily check lists.
- Evaluating technicians monthly.
- Preparing monthly reports of the management performance for the high management.

installation and maintenance engineer at Halayeb
  • Egypt - Damietta
  • August 2006 to December 2008

Responsible for:
-welding and scrubbing teams
-Maintaining and rehabilitating machinery and tanks.
-Sharing installation manager for executing drawings (Canadian expert).
-Reviewing welded parts

Education

Bachelor's degree, production & mechnical design Engineering
  • at suez canal univercity / faculty of engineering
  • May 2006

Specialties & Skills

Maintenance Engineering
Installation Management
Equipment Installation
Designing and installing the required flow charts for milk and juice production.

Languages

English
Intermediate

Training and Certifications

Tetra pak TPA 19 (Training)
Training Institute:
Tetra pak Egypt
Date Attended:
April 2013
maintenance of Erca formseal (Training)
Training Institute:
Oyester - Erca
Date Attended:
May 2014
maintenance (Training)
Training Institute:
TetraPak
Date Attended:
March 2013
Advanced control system (Training)
Training Institute:
Gesco Group
Date Attended:
April 2009
Occupational health & safety (OHSAS180012007) (Training)
Training Institute:
SGS- EGYPT
Date Attended:
July 2010
Ammonia refrigeration systems (introduction (Training)
Training Institute:
GEA Grasso- HOLLAND
Date Attended:
April 2007

Hobbies

  • Drawing