Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
Ab Rahim Mohammad Yusoff, Interface Manager

Ab Rahim Mohammad Yusoff

Interface Manager·Acciona Construction Philippines Inc.

Malaysia

Master's degree, Operation and Project Management

Work experience

Total years of experience: 24 years, 10 months

Interface Manager

September 2022 - Present

Acciona Construction Philippines Inc.

San Fernando, Philippines

September 2022 - Present

The obligation to liaise, plan, coordinate, manage and cooperate with these interfacing contractors includes, but is not limited to, the following individual System Wide Installations:

1 Track Laying
2 Signaling
3 System Controls
4 Automatic Fare Collection
5 Passenger Screen Doors
6 Communications
7 Trackwork

The various matrices given below have been prepared by the Employers consultants and show the broad division of responsibilities as between these various interfacing parties. They may to be use as the basis for the contractor DIM however they are not to be regarded as exhaustive and the data given is to be verified and updated by the Contractor as the requirements and circumstances of the Project dictate.

Company industry:
Construction & Building
Job role:
Construction and Building

Electrical Manager Power Supply

January 2015 - August 2022

MMC-Gamuda (PDP-SSP) JV Sdn Bhd

Kuala Lumpur, Malaysia

January 2015 - August 2022

1. Checking and review design submitted by WPC (Work Package Contractor SY205/Colas Rail Asia)
2. Coordination work with PMD, others WPC and Colas Rail System Engineering.
3. Checking and reporting site constructions progress according to IFC CSD.
4. Preparing weekly report,
5. Conduct progress meeting, weekly and monthly basis construction meeting PD&DS department to keeping the work in line with the approve schedule.
6. Conduct a mitigation plan in case of work delay and to catch up schedule planning.
7. Manpower and resources monitoring planning to maximize the time utilized in each or work site.
8. Conduce weekly dashboard meeting to keep track the work progress.
9. Inspect the material and equipment at factory and before installation in order to make sure work package contractor supply and install the correct equipment as per design.
10. Onsite meeting and coordination case of clashing with existing or other system equipment.
11. Carryout PICO inspection of every equipment installed at site to make sure installation according to signoff CSD and meet the installation standard.
12. Coordinating and interfacing construction Sub Station (33KV), TPSS and Bulk Sub Station (132KV, passenger stations northern, underground and southern section.
13. Monitoring progress vs. schedule
14. On site monitoring and coordination, installation method and quality.
15. OIL monitoring and closure.
16. Coordination the material delivery and installation work underground,
17. Closely coordinate with others system and installation to maximize the time period, reduce the double handling with and lost manpower resources.
18. Attending all the safety passport and induction prior entering all different work sites for familiarization as per safety requirement.
19. Education contractor or subcontractor of handling the equipment and installation in proper method.
20. Migration work coordination between SBK line 1 MRT and SSP line 2 MRT. Work closely with Operational System Operator (RapidRail Sdn Bhd). To make sure not to disturb the live train operational and working according RapidRail work standard.
21. Closely working and coordinate with RapidRail Power team and QA team and follow the safety and security requirement and avoiding interrupting train operation.
22. Energization the TPSS and Utility building and handover to operation team.
23. Drive Colas Rail to complete Track Related Installation Program (TRIP) to energize 33kv power and 750DC traction power.
24. Testing and commissioning activities.
25. EOIL preparation and closing prior handover to client.
26. Handing over inspection with MRT for asset handing over to client until acceptance and operated by rail operator.
27. Asset handing inspection and rectification any defect before handing over to Owner.
28. Final inspection with Government Railway Authorities prior open services to public to make sure comply and safe to public.
29. Manage a maintenance team for rectification work or failure to minimize interruption to the system.
30. Manage spare part and manpower to carryout daily and routine maintenance
31. Coordination and planning with related parties for maintenance to avoid interruption to the operation and healthiness of the system.
32. Plan for preventive maintenance manpower and material also make sure team on standby duty for corrective maintenance.
33. Prepare PR and stock check availability for all necessary spare part.

Company industry:
Construction & Building
Job role:
Electrical Engineering

Maintenance Manager North Double Track Project

December 2013 - July 2014

Balfour Beatty Ansaldo System JV Sdn. Bhd

Malaysia

December 2013 - July 2014

Dec 2013 - Now: Maintenance Manager North Double Track Project
Balfour Beatty Ansaldo System JV Sdn. Bhd
C4-5-1, Solaris Dutamas,
No 1 Jalan Dutamas 1
50480 Kuala Lumpur

Responsibilities:
1. Managing and organizing department such as TPS, OCS, Communication, Signaling and Power SCADA on maintenance work.
2. Managing call centre department receiving all type of fault reporting by
KTMB/Gamuda and delegate to respective department (24 hour shift rotation)
3. Planning and organizing routine maintenance work for all department such as traction
power substation (TPS), Signaling, Communication, Power Scada and overhead
catenary system (OCS)
4. Managing 24 hours fault response team to attend corrective maintenance.
5. Preparing report and attending monthly maintenance meeting for all department.
6. Involving in testing and commissioning for OCS and signaling
7. Involve TPS testing and commissioning work, energization132kV and 25 kV
Switchgear.
8. Managing 3 depot supply material during 2 year defect liabilities period

Company industry:
Construction & Building
Job role:
Maintenance, Repair, and Technician

Project Manager - Senior Associate

June 2013 - July 2014

Syarikat Prasarana Negara Berhad

Malaysia

June 2013 - July 2014

Jun 2013 - Now: Project Manager - Senior Associate
Syarikat Prasarana Negara Berhad (PRIME)
B 20-1, Level 20, Menara UOA Bangsar,
No. 5, Jalan Bangsar Utama 1,
59000 Kuala Lumpur

Responsibilities:
1. Handling project replacement feeder manager with arc protection for 33kv switchgear for Kelana Jaya line LRT (10 Substation)
2. Handling project replacement of Public address system for Kelana Jaya line LRT (24
station and Annex building)
3. Construction of Rectifier Sub Station P62 for Ampang line and internal equipment
installation.
4. Managing Balfour Betty for project supply, Install, testing and commissioning of LBS at P62.
5. Monitoring KL Monorail Fleet Expansion Project (Contractor Scomi)
6. Refurbishment of 750 Vdc switchgear and AARU associated system BFZ TPSS
Kelana Jaya.
7. Earth bracket replacement at KL Monorail Line.
8. DC traction power substation replacement.
9. Replacement all Generator set for Ampang Line station.
10. Replacement of PA system for Ampang Line.
11. Assist Project team for UPS replacement for KL Monorail, Kelana Jaya Line and
Ampang Line.

Company industry:
Motor Vehicle Passenger Transport
Job role:
Engineering

Sr. Electrical Engineer

December 2007 - May 2013

Rapid Rail Sdn. Bhd

Malaysia

December 2007 - May 2013

Dec 07 - May 2013: Sr. Electrical Engineer.
Rapid Rail Sdn. Bhd (subsidari of Syarikat Prasarana Negara)
Wisma Monorail
Jalan Tebing, Brickfields
50470 Kuala Lumpur.

Responsibilities:
1. Assist infrastructure/WEES manager to planning, monitoring and executing of new
improvement project such as emergency power isolation project. Prepare the SOP the operation of the emergency power isolation project
2. Carryout demonstration of emergency power isolation project
3. Provide technical support to power team and others section in infrastructure
especially in case new improvement project such as SW 06 modification and refurbishment work car traction system
4. Assist infra manager for planning, monitoring, coordination and executing work within
KLSR to ensure preventive and corrective maintenance is carry out correctly and also outside contractor to make sure the result produce by contractor is meet our standard and specification within company setting budged.
5. Assist infrastructure manager in dealing with local authorities such as TNB and
Energy Commission to ensure we are inline with the rule and regulation. Coordinate with TNB to make sure minimized power interruption.
6. Preparing and update the standard operation procedure, method statement and check sheet toward the ISO 9001:2000 certifications.
7. Involve in internal audit team and carryout internal audit to others department in
KLSR to fulfil the ISO requirement
8. Update and make good all documentations and check sheet and ready for Sirim
Malaysia audit.
9. Prepare technical proposal and modification to TPSS to overcome the overvoltage
problem form TNB mainly to prevent any damages to TPSS equipment and train
equipment especially traction inverter. It also related to the train passenger safety.
10. Committee in developing blueprint for SAP programmed.
11. Developing NOSS programmed for Malaysia Education Department (SKM) regarding train management and maintenance.
12. Managing 3 ongoing projects which are KLMFEP, installation 3 unit disconnect switch and DC switchgear replacement for 2 TPSS.

Job role:
Electrical Engineering

Sr. Electrical Engineer

September 2006 - December 2007

KL Monorail System Sdn. Bhd

Malaysia

September 2006 - December 2007

Sept 06 - Dec 07: Sr. Electrical Engineer.
KL Monorail System Sdn. Bhd.
Wisma Monorail
Jalan Tebing, Brickfields
50470 Kuala Lumpur.
Responsibilities:
1. Manage power maintenance team for 5 TPSS, 11 passenger station, Depot and
Wisma Monorail..
2. Manage maintenance team for installation and maintenance KL Multimedia
advertisement lighting at KL Monorail buck head and column.
3. Provide technical support to power team and others section in infrastructure
especially in case new improvement project such as SW 06 modification and refurbishment work car traction system
4. Assist infra manager for planning, monitoring, coordination and executing work within
KL monorail to ensure PM and CM maintenance is carry out correctly.
5. Monitoring contractor to make sure the result produce by contractor is meet our
standard and specification within company setting budged.
6. Assist infrastructure manager in dealing with local authorities such as TNB and
Energy Commission to ensure we are in line with the rule and regulation.
7. Coordinate with TNB to make sure minimized power interruption.

Job role:
Electrical Engineering

Project Engineer Electrical & Instrumantation

January 2006 - September 2006

Sumatec Resources Berhad

Malaysia

January 2006 - September 2006

Jan 06 - Sept 06: Project Engineer (Electrical & Instrument)
Sumatec Engineering & Construction.
Projecat involve: Ammonia Red Line 1 and 2 Project.
Client: Petronas Ammonia Sdn.Bhd.
EPCC project.

Responsibilities:
1. Preparation working schedule to any involving electrical and instrumentation work.
2. Installation E & I item for Red Line Project.
3. Calibration for instrumentation work.
4. Installation of compressor and coordination work with the compressor vendor
(from Italy)
5. Testing and Commissioning work.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Project Engineer Electrical & Instrument

October 2005 - September 2006

Sumatec Resources Berhad

Malaysia

October 2005 - September 2006

Oct 05 - Sept 06: Project Engineer (Electrical & Instrument)
Sumatec Engineering & Construction.
Projecat involve: Construction of Kemaman Bitumen Plant.
Kemaman Terengganu.
Client: KBC and TBC
Engineering by Sumatec Engineering and Construction.

Responsibilities: 1. Preparation of job safety analysis and job method statement prior executing any
work.
2. Preparation ITP (Inspection and Test Plan) for electrical and instrument work.
3. Attending weekly site coordination meeting with Client Kemaman Bitumen
Company (KBC) and client consultant (TBC)
4. Inspection of free issue material taken from Thailand.
5. Material controlling and preservation after mobilized from Thailand.
6. Carryout field inspection and preparing QA/QC report for electrical & Instrument
work.
7. Reporting work status daily.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Mechanical & Electrical Coordinator

November 2004 - October 2005

Sumatec Resources Berhad

November 2004 - October 2005

Nov 2004- October 05: Mechanical & Electrical Coordinator.
Sumatec Resources Berhad.

Project involved: Construction of Sungai Besi Military Camp.
Sungai Besi, Selangor.

Consultant: Arkitek Jururancang Malaysia & Ranhill Consulting Sdn. Bhd.
Client: Kementerian Pertahanan Malaysia.

Responsibilities: 1. Preparation working schedule to any involving mechanical and electrical sub- contractor.
2. Coordination work and sequence of work between all internal sub-contractor.
3. Carry out coordination between internal sub-contractor and nominated contractor
(NSC)
4. Monitoring work and schedule.
5. Preparing material proposal and material receiving inspection.
6. Coordination with client any of site technical error, modification and rectification
work.
7. Testing and commissioning all mechanical end electrical fixtures including lift.
8. Rectification of defect work.

Job role:
Engineering

Electrical & Instrument Engineer

September 2003 - November 2004

Sumatec Resources Berhad JV Project Development India Limited

September 2003 - November 2004

Sept 2003- Nov 2004: Electrical & Instrument Engineer.
Sumatec Resources Berhad JV Project Development India Limited.

Project involved;
Construction of Asean Bintulu Fertilizer (ABF) revamp project, Bintulu Sarawak
(Petronas subsidiary)

Consultant: UHDE India limited and OGP Technical Service.
Client: Asean Bintulu Fertilizer (ABF)


Responsibilities:
1. Preparation of job safety analysis and job method statement prior executing any
work.
2. Preparation ITP (Inspection and Test Plan) for electrical and instrument work.
3. Attending weekly site coordination meeting with Client Asean Bintulu Fertilizer
(ABF) and client consultant (UHDE India)
4. Preparation electrical & instrument buying specification according technical
specification by client prior start any procurement.
5. Site supervision including servicing work, site modification and installation work.
6. Calibration work for new and existing instrument, and trouble shooting for any
abnormal / faulty instrument.
7. Major sub-station extension and modification work including installation a new
electrical panel, busbar, ENMC system and current limiter panel.
8. Supervising Heat tracing installation work.
9. Reviewing QA/QC report for electrical and instrument work.
10. Preparation final documentation.
11. Reporting work status daily to project control department.
12. Testing and commissioning.

Job role:
Engineering

Electrical & Instrument Engineer

April 2003 - September 2003

Sumatec Corporation Sdn Bhd

April 2003 - September 2003

April 2003 - Sept 2003: Electrical & Instrument Engineer.
Sumatec Corporation Sdn Bhd

Project involved;
Construction of balancing tank project, Petronas Penapisan Terenganu Sdn. Bhd
(PPTSB)

Consultant: AMEX Engineering.
Client: Petronas Penapisan Terengganu Sdn.Bhd.

Responsibilities:
1. Material preparation for basic engineering study and data collection.
2. Coordination with engineering consultant (AMEX engineering)
3. Preparation of job safety analysis and job method statement prior executing any
work.
4. Preparation ITP (Inspection and Test Plan) for electrical and instrument work.
5. Preparation electrical & instrument buying specification according technical
specification by client prior start any procurement.
6. Site supervision including servicing work, site modification and new installation
work.

Company industry:
Oil & Gas
Job role:
Engineering

Electrical & Instrument Engineer

July 2002 - September 2003

Sumatec Corporation Sdn Bhd JV Oil Line Engineering

July 2002 - September 2003

July 2002 - Sept 2003: Electrical & Instrument Engineer
Sumatec Corporation Sdn Bhd JV Oil Line Engineering.

Project involved;
Construction of retrofit work for GPP-2, GPP-3 & GPP-4, Ethane Extraction
Improvement Project, Gas Processing Plant. Kerteh, Terengganu.

Consultant: OGP Technical Services and Petronas Gas Berhad (Engineering
Division)
Client: Petronas Plant Operation Division (POD)


Responsibilities: 1. Preparation of job safety analysis and job method statement prior executing
any work.
2. Preparation ITP (Inspection And Test Plan) for electrical and instrument
work.
3. Attending weekly site coordination meeting with Client Petronas Gas Berhad
(PGB) and client consultant (OGP)
4. Preparation electrical & instrument buying specification according technical
specification by client prior start any procurement.
5. Coordination with buying agent (Oil Line Engineering / Tenaga Nazar) about procurement matter.
6. Site supervision including servicing work, site modification and new
installation work.
7. Calibration work for new and existing instrument, and trouble shooting for any abnormal / faulty instrument.
8. Carryout field inspection and preparing QA/QC report for electrical & Instrument work.
9. Reporting work status daily to project control department.
10. Preparation final documentation.
11. Testing and commissioning.

Job role:
Engineering

Electrical & Instrument Supervisor

April 2001 - July 2002

Megasteel (M) Sdn. Bhd. (Loin Group And Company)

April 2001 - July 2002

April 2001 - July 2002: Electrical & Instrument Supervisor.
Megasteel (M) Sdn. Bhd. (Loin Group And Company)

Responsibilities:
1. Daily maintenance work.
2. Leading a group of technician for daily maintenance work (shift)
3. Involving in HV switchgear and HV circuit breaker servicing under supervision by vendor (ABB)
4. Involving in final stage of construction for Vacuum degassing system until commissioning stage.
5. PLC trouble shooting.
6. Overhead crane maintenance, servicing and troubleshooting.
7. Monitoring any faulty in electrical to avoid interrupting for steel melting process.

Job role:
Engineering

Maintenance Supervisor

April 2001 - April 2001

Grand Blue Wave Hotel

April 2001 - April 2001

Graduate- April 2001: Maintenance Supervisor
Grand Blue Wave Hotel

Responsibilities:
1. Daily maintenance work.
2. All new electrical installation.

Job role:
Maintenance, Repair, and Technician

Education

Asia E University

March 2014

March 2014

Master's degree, Operation and Project Management

Malaysia

GPA (point): 3.87 out of 4

GPA (point): 3.87 out of 4

1) . Master in Operation and Project Management from Asia E University.

Asia E University

March 2014

March 2014

Master's degree, Master in Operation and Project Management

GPA (point): 3.87 out of 4

GPA (point): 3.87 out of 4

Mara University of Technology

Bachelor's degree, Electrical Engineering

2) . Advance Diploma / Industrial Expert Sector (TP05-00-Transportation, Sub-sector: 05-08 Railways Industry) From Jabatan Pembangunan Kemahiran Malaysia. 3) . Diploma in Electrical Engineering (Power), Mara University of Technology, Shah Alam Postal Address: No 29, Jalan Jawi Jaya 4, Taman Jawi Jaya, Sungai Jawi, 14200 Seberang Prai Pulau Pinang. Contact No: 018-2798566 / 012-3617502 Current Employer: Balfour Beatty Ansaldo System JV Sdn Bhd Current Position: Maintenance Manager for North Double Track. Current Salary: RM 11, 300.00 Expected Salary: Negotiable E-Mail Address: abrahim.army@gmail.com yusoff.abdrahim@bbas.com.my Working Experience Background • North Double Track (Maintenance Manager -overall): 1 year • Prasarana Project Department (Project Manager): 1 year - Transfer from KL Monorail

Bachelor's degree, Oil

• RapidRail KL (KL Monorail- Sr. Electrical Engineer): 8 years • Oil and gas ( E and I Engineer - EPCC): 5 ½ years • Steel melting plant factory (Electrical Supervisor): 1 ½ years • Hotel (Electrical Technician): 1 year

Skills

Maintenance

Expert

Electrical

Expert

AUDIT

Beginner

BLUEPRINT

ENGINEER

Expert

INTERNAL AUDIT

Intermediate

ISO

Intermediate

MAINTENANCE

Expert

SAP

SOP

TECHNICAL SUPPORT

Expert

TESTING

Electrical

Expert

Social profiles

Languages

English

Expert

Malay

Expert

Training and Certifications

Training
Railway Elelctrification
Jabatan Kemajuan Pendidikan
Jan 2010