Field Quality Lead
SIPD (Shell Iraq Petroleum Development)
Total years of experience :34 years, 5 Months
Coordinating all welding, NDT and civil quality activities. Auditing all the contractors. Reviewing of all NDT procedures (RT, UT, MT, PT) including PMI, Hardness Test, PWHT and Hydro/Pneumatic Test Procedures for all contractors. Reviewing of all WPSs & PQRs for (Saipem \[FCP Gas Project\] and CPPB \[FCP Gas Pipeline\]) referring to different standards, DEPs and project specifications. Reviewing of all ITPs and Quality Procedures for (Saipem and CPPB). Technical assistant for all contractors.
Managing all quality activities such as NDT, welding and civil works. Reviewing of all NDT procedures (RT, UT, MT, PT) including PMI, Hardness Test, PWHT and Hydro/Pneumatic Test Procedures for all contractors. Reviewing of all WPSs & PQRs for (ENKA-Green Field, Techno/CPPB-Brown Field and CPPB-Pipeline) referring to different standards, DEPs and project specifications. Reviewing of all ITPs and Quality Procedures for different contractors (ENKA-Green Field, Techno/CPPB-Brown Field and CPPB-Pipeline). Technical assistant for all contractors.
Project: Erbil Refinery Expansion Project.
Client: KAR Group.
Project: Reshadat (Oil Platforms) Renovation & Development Project / Khoram shahr/IOEC Yard - Iran.
Client: IOOC / TASDID
Position: Bureau Veritas-Site QA/QC Manager,
Project: Cable Route Survey between Sirri Island and Nasr Platform and Seabed Sampling /Sirri Island - Iran.
Client: SADAF
Position: MWS & TPI
Project: Salman Oil & Gas Field Integrated Development EPC-2/Bandar Abbas-Iran.
Client: PEDCO (PetroIran Development Company) .
Position: Bureau Veritas-Site QA/QC Manager.
Project: Dorood Oil Field Development/ Kharg Island-Iran
Client: TOTAL
Position: Bureau Veritas-Site QA/QC Manager.
Project: Balal (Oil & Gas) Topsides and Jackets Installation/ Balal Field-Iran
Client: TOTAL FINA ELF
Position: MWS
Project: South Pars Gas Field Development Phase 1 (Offshore Project)/Iran
Client: PetroPars
Position: Bureau Veritas-Senior Welding and NDT Inspector.
Supervision on prefabrication, fabrication and rollup of RP1, RP2, BSP1 &BSP2 Jackets.
Supervision on prefabrication, fabrication and erection of RP1, RP2, BSP1 & BSP2 Decks.
Supervision on prefabrication, fabrication and erection of WP2 (SPD4) deck.
Load out lead of jackets, Topsides and ancillaries.
Supervision of Survey and Dimensional Control activities.
Project: Abuzar West Wing Oil Field Development (Offshore Oil Project)/Iran
IOEC/TACE - Bandar Abbas
Client: NIOC
Position: Team leader & Survey Supervisor
• Check and approval of structural work orders (Shop Drawings).
• Supervision on fabrication and erection of A15, A16, A17, A18, A19 Jackets & Decks.
• Dimensional control of A15, A16, A17, A18, A19 Jackets & Decks.
Project: Repair on North Pars Platforms (Offshore Gas Project)/Iran
TACE- Bushehr
Client: NIOC
Position: Dimensional control (Survey) Supervisor & structural Inspector
• Dimensional control and inspection of North Pars Topsides Decks and top of Jackets.
Project: Persian Gulf Ship Building Yard Project /Iran
TACE-Bandar Abbas
Client: ISOICO (PGSC)
Position: Deputy of Site Mgr & Structural Inspector
• Inspection of workshops, substation buildings and open yard.
• Checking Contractors invoices.
Project: Repair on Abuzar Platforms (Offshore Oil Project) /Iran
IOEC/TACE- Bushehr
Client: NIOC
Survey Supervisor
• Dimensional control of Abuzar Decks, top of Jackets and Flare.
Project: Bushehr Seaport Development Project/Iran
TACE-Bushehr
Client: Bushehr Seaport Organization
Deputy of Site Mgr, Civil & Survey Inspector
• Inspections of Storages, office buildings, open yards, Utility channels, Drainage channels, extending lands and road around port.
• Checking Contractors invoice.
Feasibility Studies (Area, Turbine specification, Water fluid, Power Plant capacity, …)
•Geotechnical study for Atan Road area.
•Surveying of areas.
•Fabrication of Dams.
•Fabrication of channels.