Senior Project Manager
Al Gammal contracting
Total des années d'expérience :16 years, 7 Mois
Projects:
o Monorail Infrastructure and electrical feeding (End User: The National Authority for Tunnels - Owner: North and South Cairo Electrical Distribution Companies)
Job Description: Responsible for:
➢ Being the main coordination point between the End User, Owner, and existing facilities, and al Gammal
➢ Creating the Overall time schedule
➢ Creating the Project Budget
➢ Approving the Layout and routing of the cable feeding
➢ Setting due dates and milestones to the project team
➢ Assigning responsibilities.
➢ Overseeing upon the quality control methods in place
➢ Resolve unexpected technical and/or managerial problems that may arise
➢ Following up the Periodic Work Progress for invoicing the client
➢ Assuring the project is running on schedule and cost approved baselines and Monitoring the GP% of the project.
➢ Signing the Taking Over Certificate.
o WE telecom Egypt administrative building - New Administrative Capital (Owner: WE telecom - Main Contractor: CCC) Job Description: Responsible for:
➢ Being the main coordination point between the main contractor and al Gammal
➢ Creating the Overall time schedule
➢ Creating the Project Budget
➢ Reviewing the design and shop drawings received from the main contractor
➢ Setting due dates and milestones to the project team
➢ Assigning responsibilities.
➢ Overseeing upon the quality control methods in place
➢ Resolve unexpected technical and/or managerial problems that may arise
➢ Following up the Periodic Work Progress for invoicing the client
➢ Signing the Taking Over Certificate.
➢ Managing the Change requests based on the owner and main contractor requirements
➢ Managing the stakeholders to keep the project on track.
➢ Assuring the project is running on schedule and cost approved baselines and Monitoring the GP% of the project.
projects:
o Industrial Smart City System Integration (First integrated Smart Industrial City in KSA and Gulf Area)
Job Description: Responsible for:
➢ Being the main coordination point between the Client, Consultant, Consortium Partner (if available), Giza Systems and sellers (Subcontractors and Suppliers).
➢ Creating the Overall time schedule
➢ Creating the Project Budget
➢ Collect the Customer’s requirements to assure the Project Scope
➢ Being a part of the team finalizing the Contract with the Client
➢ Managing the subcontractors’ negotiation meetings.
➢ Managing the stakeholders to keep the project on track.
➢ Assuring the project is running on schedule and cost approved baselines and Monitoring the GP% of the project.
➢ Setting due dates and milestones to the project team including the subcontractors.
➢ Assigning responsibilities.
➢ Ensuring that all the materials used are as per the specifications and have passed the appropriate approval sequence
➢ Overseeing upon the quality control methods in place
➢ Resolve unexpected technical and/or managerial problems that may arise
➢ Following up the Periodic Work Progress for invoicing the client and subcontractors.
➢ Signing the Taking Over Certificate, User Acceptance Test
o Assuit Hydrocracking Complex (owner ANOPC - Main Contractor Petrojet) Job Description: Responsible for:
➢ Being the main coordination point between the Owner, Main Contractor, Consultant, ), Giza Systems and sellers (Subcontractors and Suppliers).
➢ Creating the Overall time schedule
➢ Creating the Project Budget
➢ Managing the Change requests based on the owner and main contractor requirements
➢ Collect the Customer’s requirements to assure the Project Scope
➢ Managing the stakeholders to keep the project on track.
➢ Assuring the project is running on schedule and cost approved baselines and Monitoring the GP% of the project.
➢ Setting due dates and milestones to the project team including the subcontractors.
➢ Assigning responsibilities.
➢ Ensuring that all the materials used are as per the specifications and have passed the appropriate approval sequence
➢ Overseeing upon the quality control methods in place
➢ Resolve unexpected technical and/or managerial problems that may arise
➢ Following up the Periodic Work Progress for invoicing the client and subcontractors.
➢ Signing the Taking Over Certificate, User Acceptance Test
Projects:
o May 2019 - Nov 2019: Engineering, Supply, Construction, Installation, Commissioning, Testing and Warranty of 220/33/33 kV GIS substation for Canal Sugar Factory in west Mallawy
▪ Scope of work is turnkey Project (with Value exceeding 500 Million EGP)
o Jan 2019 - Apr 2019: part of CANRCC (Canal Regional Control Center) Project team in the initiation phase till approval of baseline time schedule
▪ Scope of work is to rehabilitate the main building of CANRCC in Ismailia as well as introducing and updating the SCADA system in 119 Substation connected to the control center
o Jun 2016 - Dec 2018: Engineering, Supply, Construction, Installation, Commissioning, Testing and Warranty of 8 x 500 and 220 kV GIS substations (Consortium with Siemens Egypt - substations of East Assuit, Abu el Matameer, ..etc)
▪ Scope of work is Civil and Electromechanical works (with Value of 450 Million EGP)
Job Description: Responsible for:
➢ Being the main coordination point between the Client, Consultant, Consortium Partner (if available), EET&D and sellers (Subcontractors and Suppliers).
➢ Managing the subcontractors’ negotiation meetings.
➢ Managing the stakeholders to keep the project on track.
➢ Assuring the project is running on schedule and cost approved baselines and Monitoring the GP% of the project.
➢ Setting due dates and milestones to the project team including the subcontractors.
➢ Assigning responsibilities.
➢ Ensuring that all the materials used are as per the specifications and have passed the appropriate approval sequence
➢ Overseeing upon the quality control methods in place
➢ Resolve unexpected technical and/or managerial problems that may arise
➢ Following up the Periodic Work Progress for invoicing the client and subcontractors.
➢ Signing the Taking Over Certificate
➢ Following up the progress of the punch list accomplished to the PAC
➢ Signing the FAC after the warranty period and clearing the punch list requirements
Delivering revenue up to 100 Million EGP with on time delivery (OTD) over 95% for 2015 including local and export projects in Iraq, Ivory Coast and Kuwait.
Responsible for completion of the project on time, on specs, as agreed, on budget and controlling the GP% through coordinating all resources and suppliers; developing the risk plan, setting due dates; assigning responsibilities; monitoring, and by the end of the project responsible for the documentation and referencing.
Projects: NGL plant (Zeit bay - Customer EBGDCo) -
on shore pumping station (south Sinai Customer GUPCO) - anti pollution station (south Sinai -
Customer Petrobel)
Responsible for:
Being the main technical advisor to subcontractors, labors and technicians.
Checking drawings, plans, and other qualities to get an accurate calculation of the whole thing.
Ensuring that all the materials used are according to the specifications.
Overseeing the requisition and selection of the materials.
Agreeing to the material distributors on the set prices and take cost effective measures.
Managing, monitoring and interpreting the design of the contract documents that has been supplied to them, to be able to make the monthly financial invoice.
Managing the site on a day to day basis that includes supervising and monitoring the labor force and that of the sub-contractors.
Overseeing upon the quality control methods in place.
Resolve unexpected technical problems that may arise.
Making the required tests for the done work (Calibration of instruments, Megger and Continuity test for Cables …etc).
Issuing the Release form for Handing over the site to the Owner.
Making the Marked-up Drawings and the As-Built Drawings.
Responsible for offering, bidding, and prequalification’s files in the offering Stage.
Responsible for completion of the project on time, on specs, as agreed, on budget and controlling the GP% through coordinating all resources and suppliers; setting due dates; assigning responsibilities; monitoring, and by the end of the project responsible for the documentation and referencing.
Responsible for completion of the project on time, on specs, as agreed, on budget and controlling the GP% through coordinating all resources and suppliers; setting due dates; assigning responsibilities; monitoring, and by the end of the project responsible for the documentation and referencing.
B.Sc. of Electric Power and Machine Engineering 2007 - Faculty of Engineering - Ain Shams University Cairo, Egypt. Grade: Good Graduation Project: Protection against power system harmonics Graduation Project Grade: Excellent