عبدالقادر احمد الطاهر حسن, مدير قسم تخطيط وامداد الوقود

عبدالقادر احمد الطاهر حسن

مدير قسم تخطيط وامداد الوقود

Sudanese Thermal Power Generating Company (STPGC).

البلد
السودان
التعليم
ماجستير, M.Sc. Electrical Power Engineering (2009
الخبرات
23 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :23 years, 10 أشهر

مدير قسم تخطيط وامداد الوقود في Sudanese Thermal Power Generating Company (STPGC).
  • السودان - الخرطوم
  • أشغل هذه الوظيفة منذ مارس 2021

• Participates in preparing plans for the current and future needs of the company in terms of materials and operational services
• Prepares the planning budget for the department and follows up on the implementation of the listed programs
• Monitors quality and specification control of the Company's purchases of fuels and oils
• Establishes standards and policies for fuel purchase and storage
• Monitor the performance of suppliers with regard to fuel
• Preparing reports of fuels and oils for thermal power plants
• Preparing periodic reports showing the station's position

Director of Contracts Follow-up Division في الشركة السودانية للتوليد الحراري
  • السودان - الخرطوم
  • مارس 2019 إلى فبراير 2021

• Receipt of the original contract after signing it.
• Follow up the implementation of the contract.
• Follow up the opening of letters of credit.
• Receipt and confirmation of letters of guarantee and follow-up (period, renewal, and delivery to the contractor when the contract is completed).
• Follow up the contract payments and compare them with the implementation of the contract, and the preparation of periodic balance.
• Preparing a periodic report indicating the technical and financial progress of the contract and recommending the appropriate decision.

Efficiency and planning engineer for Thermal power plants (Head of Information and Statistic Unit) ( في الشركة السودانية للتوليد الحراري
  • السودان - الخرطوم
  • مايو 2014 إلى فبراير 2019

• Prepare reports the weekly, monthly and annual(for all company power plants 14)
• Prepare periodic reports on the status of thermal power plant...
• Participate in the planning of the routine maintenance power plants.
• Analysis of daily, monthly &annual reports
• Participating in the execution of continuous improvement

Maintenance, efficiency and planning engineer for Gas & Steam turbine power plants at Maintenance an في الشركة السودانيةللتوليد الحراري
  • السودان - الخرطوم
  • أكتوبر 2010 إلى أبريل 2014

• Collect all the data required from STPGC power plants such as generated power, auxiliary consumption, fuel oil consumption, running hours, etc these data used for performance indicator calculation such as availability, forced outage factor, percentage of STPGC generated power from total grid generation, kwh cost for each STPGC power plant and company, , , etc, any odd indicators followed by full analysis and rectified action applied.
• Prepare weekly, monthly, and annually reports, which includes generation, auxiliary consumption, fuel oil consumption, lube oil consumption, running hours, etc.

Sr. Operation engineer في NATIONAL ELECTRICITY CORPORATION
  • السودان - خرطوم بحري
  • أكتوبر 2009 إلى سبتمبر 2010

• Supervise the preparation of the unit before starting it and this include visual inspection beside the unit, checking that the barring is working, auxiliary LO pump is working, starting of cooling water pumps and FO forwarding pump operation, , , etc.
• Observe the unit during starting by checking all parameters related such pressure, temperature, speed, and perform correct action in case of abnormalities, this process is continue from zero speed up to full speed no Load (FSNL).
• After checking that all parameters are fulfilled at FSNL the unit connected to the grid manually or automatically through synchronization process, after the unit is connected to the grid by closing generator circuit breaker (CB), the unit load increased gradually up to load dispatch center (LDC) request.
• All connected units observed continuously by operation staff in the control room and besides the unit any abnormalities, important and critical events and action applied recorded in the log sheet related to each unit.
• Prepare mid night report at the end of the day for each unit this report include the generated power, auxiliary consumption, FO consumption, running hours, delivery, stock, water consumption, specific fuel consumption (sfc), , , etc.
• Issued permit to work (PTW) for all works carried out in the plant and make the isolation required and also observed the closing process of PTW after work completed.
• Observed the unit during shutdown process from load removing, generator CB opening, FSNL to zero speed and checking the starting of the auxiliary LO pump and barring device of the shaft operated, and also stopping of the unnecessary auxiliaries at appropriate time.
Manage the operation staff during shift period. Issue defect card around the plant, administrate all the auxiliary plant

Mechanical Engineer في National Electricity Corporation of Sudan (NEC)
  • السودان - الخرطوم
  • مايو 2000 إلى يوليو 2009

Supervise the preparation of the unit before starting it and this include visual inspection beside the unit, checking that the barring is working, auxiliary LO pump is working, starting of cooling water pumps and FO forwarding pump operation, etc.
• Observe the unit during starting by checking all parameters related such pressure, temperature, speed, and perform correct action in case of abnormalities, this process is continue from zero speed up to full speed no Load (FSNL).
• After checking that all parameters are fulfilled at FSNL the unit connected to the grid manually or automatically through synchronization process, after the unit is connected to the grid by closing generator circuit breaker (CB), the unit load increased gradually up to load dispatch center (LDC) request.
• All connected units observed continuously by operation staff in the control room and besides the unit any abnormalities, important and critical events and action applied recorded in the log sheet related to each unit.
• Prepare mid night report at the end of the day for each unit this report include the generated power, auxiliary consumption, FO consumption, running hours, delivery, stock, water consumption, specific fuel consumption (sfc), , , etc.
• Issued permit to work (PTW) for all works carried out in the plant and make the isolation required and also observed the closing process of PTW after work completed.
• Observed the unit during shutdown process from load removing, generator CB opening, FSNL to zero speed and checking the starting of the auxiliary LO pump and barring device of the shaft operated, and also stopping of the unnecessary auxiliaries at appropriate time.
• Manage the operation staff during shift period. Issue defect card around the plant, administrate all the auxiliary plant.
• the starting process and time required from zero speed to FSNL to full load, in gas turbine the auxiliaries are less and the time required from zero speed to full load also is less .
• Responsible to load dispatch center for the required loading of the unit, make sure that the N.E.C safety rules are applied, perform the on job training for the operation staff, administer the shift according to N.E.C regulations, make sure that the required quantities of fuel, water and oil are available, issues Defect card to the maintenance department
• During erection period of the two new gas turbines (GT3 & GT4) I shared in installation of many equipment’s e.g. air intake filter unit, starting motor, accessory gear box, turbine rotor, load gear box, FO forwarding pump units.
• Participate in the commissioning of (GT3 & GT 4).
• Maintenance team leader during executing of preventive and corrective maintenance.
• Participate in troubleshooting for many problems occurred during the period I spent in operation and maintenance.
• Lead the execution of many preventive and corrective maintenance for gas turbine equipment’s such as FO forwarding pumps, atomizing air compressor, high pressure FO pump, atomizing air compressor, flow divider, accessory and load gearbox, bearings, fans, , , etc.

الخلفية التعليمية

ماجستير, M.Sc. Electrical Power Engineering (2009
  • في University of Khartoum
  • نوفمبر 2009

M.Sc. Electrical Power Engineering (2009)

بكالوريوس, B.Sc. Mechanical Engineering - Honors (1993 - 1998)
  • في جامعة الخرطوم
  • يونيو 1998

B.Sc. Mechanical Engineering - Honors (1993 - 1998)

Specialties & Skills

تشغيل وصيانة التوربينات الغازية والبخارية
Fire Safety
Project Management
Power Generation
inernet
microsoft office
microsft project
pramivera
برايمفيرا
Mechanical Engineering
Management

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

المجلس الهندسي السوداني
  • مهندس خريج
  • August 2000
الجمعية الهندسية السودانية
  • مهندس اختصاصي
  • October 2018
المجلس الهندسي السوداني
  • مهندس -عضوية كاملة
  • November 2018

التدريب و الشهادات

Iosh (الشهادة)
تاريخ الدورة:
December 2019
Republic Arabic of Egypt (تدريب)
معهد التدريب:
Thailand
تاريخ الدورة:
October 2001
المدة:
240 ساعة
Project Management Professional (PMP) Preparation Course (تدريب)
معهد التدريب:
Experience training center Sudan
تاريخ الدورة:
December 2014
المدة:
35 ساعة
HVAC (تدريب)
معهد التدريب:
Abd elbary training center - Sudan
تاريخ الدورة:
July 2014
المدة:
60 ساعة
Combined cycle training (تدريب)
معهد التدريب:
Republic Arabic of Egypt
تاريخ الدورة:
August 2006
المدة:
80 ساعة
firefighting system course (تدريب)
معهد التدريب:
Abd elbary training center - Sudan
تاريخ الدورة:
July 2014
المدة:
30 ساعة

الهوايات

  • sport