- Overseeing the construction of a duplex villas 200 m² with its sump pit and under ground water tank.
- Initiating the concrete work and mechanical work
Renovation of a ground and first-floor building that was damaged from the Civil War (fixing slabs, partitioning, plastering, plumbing and water supply)
- Designing a 120 m3 infinity swimming pool and creating a CAD drawing
- Estimating costs and reviewing the quality of the products to be used
- Performing tests, recoding data and evaluating testing data to be able to propose any improvements for a better outcome
- Supervising the work on all concrete and mechanical work for a medical center (540m2 ) owned by Werdaneye Municipality
- Evaluating staff's performance and finding way- to boost productivity
- Providing necessary trainings and meeting regularly with staff site to discuss any obstacles and find suitable solutions
- Overseeing the construction of Ketermaya and Mazboud Villages Water Tanks, 850m3 each, funded by KFW and managed by Unicef.
- Preparing progress reports and presenting them to W.E.T the consultant and the EBML the owner
- Initiating the concrete work for water tank and valve chamber plus handling the plastering, water proofing and testing
- Executing mechanical work for the valve chamber then applying exterior plastering and painting plus providing steel stairs and rails
- Finalizing the work connecting the new water tank to the existing network
- Handling the execution of the finishing phase for a duplex villa
- Inspecting facilities and equipment to ensure their proper use, in addition to, testing materials
- Directing activities activities on on site and creating work schedules
- Maintaining detailed documentation to be presented to concerned parties
- Designing and preparing CAD drawings to a plumbing for a residential building
- Communicating with the client to gather feedback and ensure their satisfaction
- Observing the work of pump technicians for preventive maintenance
- Inderstanding and analyzing pump components for spare parts, in E addition to, to, pump's maintenance, operation and industrial wok
- Learning about the operation and maintenance of different turbines, AC generators, electrical machines and low-voltage switchboards, in addition to, the Sequence of Operation of a Hydro-Power Plant
- Reading PLC feedbacks and its functions in different fields:; Excitation, Automation, regulation and protection plus electrical and mechanical Drawings and Wiring Diagram
- Observing the production process of Oxygen and Nitrogen in air separation plant, storage and manipulation of of cryogenic industria
liquid gases, production of Acetylene and the thermodynamics of the production process of Liquid Oxygen and Nitrogen in Air Separation Plant
- Operating with high pressure systems while adhering to safety and preventive maintenance procedures