Abdelfattah Samir Abdelfattah Basuoni, Project Electrical Design

Abdelfattah Samir Abdelfattah Basuoni

Project Electrical Design

CONTRACTING & INFRASTRACTURE Obaid Ali Alselmy for Contracting

Lieu
Arabie Saoudite - Albaha
Éducation
Baccalauréat, electrical power & machines engineering
Expérience
0 years, 2 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :0 years, 2 Mois

Project Electrical Design à CONTRACTING & INFRASTRACTURE Obaid Ali Alselmy for Contracting
  • juillet 2009 à août 2009

Plant’s cable routing layout design, cable size through voltage drop calculations + de-rating factor of cables
• Single Line Diagram with sizing of Breakers to be submitted to Consultant for approval and to Electrical ma
• Cable schedules from transformer to electrical control panel & to equipments
• Lighting & Small socket/outlets design for each building
• Fire Alarm system with location of smoke detector, alarms, heat detectors, pull station
• Lightning Protection system with Copper Air Terminals, copper flat bars & clamps accessories
• Grounding layout design with 20mm diameter earth rods, 70mm2 & 120mm2 bare copper wire.
Project Electrical Material Take-Off & BOQ:
• Material take-off & BOQ preparation with reference to the design drawings then costing and will
submit to project manager for approval.
• Sewage Treatment Plant Electrical Load calculations
• Generator and Transformer Computed Load capacity 3200kw Generator 400V., 60Hz. / Transformer
of 4000Kva 33kv/13.8v, 13.8/400 60Hz.
• Construction drawings, calculation, drawing comments are submitted to the consultant for approval.
• Design are make through Autocad drafting
• Electrical Equipment i.e. pump/ float switch/sensors.
• SCADA & PLC Controls of all Electrical Equipment i.e. pumps/ float switch/sensors.
• Power through transformer and generator by Automatic Transfer Switch .
Electrical Engineer Abdelfattah Samir 2006
ENGASD007@YAHOO.COM Page 3 6
Site Engineer with Technical Support
•Doing maintenance of handing over finally of project.
• Good knowledge of diagnostics & repair methods for the electrical equipment in petrochemical
industries.
• Planning early start, early finish schedule of due date using MS Excel to be submitted to the
Consultant Engineering Technical Services (ETS)
Project Progress Report
• Daily progress report to be submitted to project manager and daily meeting to discuss activity &
progress of the project.
Project Operation And Maintenance 1 year
• Compare of electricity items with layout.
• Doing installations of cable low voltage from substation to project using pipe underground.
• Doing buying order of electricity items.
• Search for best supplier of electricity items.
• Revision of (Electricity Company & ministry that refused of project) and dealing of that.
• Qualification of dealing with supervisor engineering (supervision).
• Identical quantity tables with layout of project.
• Doing computing of electricity items of project.
• Make shop drawing from layout of project.
• Provide coaching to lower level technicians and supervise their work to ensure proper transfer of
skills and performance as per standard codes and practices.
• Follow all company safety policies and procedures to ensure a safe working environment
• Perform any other duties and responsibilities as designated by the Foreman.
• Prepare new or modified installations on assigned equipment and test acceptance to ensure proper
functioning of equipment.
• Perform preventive maintenance on assigned equipment and ensure satisfactory repairs to minimize
equipment downtime.
• Good knowledge of international maintenance standards and best practices.
• Perform repairs on assigned equipment to minimize equipment downtime and support operations.
• Locate faulty equipment, determine nature of repairs and spare parts required to plan work correctly.
• Supervision on elec. work from beginning until finishing the project.
5 Years 3 month

Electrical Engineer à 5school (albadrany - alnhrawan - alamir naif
  • Émirats Arabes Unis
  • à janvier 2006

Quickly find solutions for malfunctions and provide alternatives to avoid stopping production lines.
Good experience in dealing with the control and monitoring systems ( SCADA SYSTEM ).
Handle speed of the oven to avoid her sudden stops.
Review and implement future expansions.
Check and review the failure of the PLC of the Siemens and Schneider and ABB and omron companies.
Review spare parts inventory levels and update them as needed.
Approved Requests for the exchange of materials and spare parts from the warehouse.
Review and study the Shutdown List and make the necessary recommendations.
inspect the new spare parts and make sure that they meet the technical specifications.
Maintains regular routine maintenance, programmed shut-off and comprehensive operations for
boilers, generators, transformers, auxiliary machines and daily corrective maintenance work.
Follow up the emergency stop work as soon as possible and technical reports on the reasons for
stopping and take the necessary precautions to avoid repeating these stops.
- 7 school (sa3d ibn aby wakas - Abdulla ibn mas3od - ibn kather - korashiat
Alzawran - Alhalah - Alsedra)
Planning, supervising, and following up the programming of preventive maintenance and repairs of
electrical and other equipment.
UmmluJ (Ummlug Housing Project) (359) villa consisting of ground floor area of 144 m2
and the extension area of 75 m 2, as well as for the construction of mosques
accommodate each other's (200) worshipers in the same location
Oct, 2006: July, 2009
Production of Sanitary Ware
Ceramic Cleopatra Group
(EGYPT) Ain Sukhna - Suez
Continues the work of inspecting the electrical equipment, diagnoses and identifies the causes of the
faults and looks for suitable methods of repair work.
Extend, study and analyze the work of electrical modifications in the factory and prepare and complete
the technical matters and maps necessary and the needs of equipment and spare parts.
Prepare and submit orders for the purchase of materials and spare parts for the plant and analyze the
prices and approve them after being technically matched.
Maintain technical specifications and follow up requests for external services and analyze the prices
provided by companies.
Determination of faults and speed of solving faults related to production lines.
Checking, reviewing and fixing the faults of the automatic control panels.
projects that have been implemented with The Advanced construction company

Project Electrical Design à Abdelfattah Samir Abdelfattah whats app
  • à

+966543050663
Technical Support &Site Enggineer.
project
Biljurashi Sewage Treatment Plant Project
Biljurashi - Al_baha - Kingdom of Saudi Arabia
Plant’s capacity : 12, 500 Phase 1 cu.mtrs/day
STP consist of 3000 KVA M.V Transformer, 3000 KW Generator, ATS, SCADA System for all
station, Fire Alarm, Street Lighting Network, Inlet Tank, Balancing Tank, Aeration Tank,
Sludge Pumping Station, Sludge Dewatering Bldg., MBR System, UV System, Effluint Pump's,
Admin Building

  • à

Research and develop techniques for maintenance of electrical equipment to ensure their effectiveness
and reduce their downtime.
Coordinate the work with other departments regarding the various maintenance works.
Participates in the training of supervisors, observers and new technicians and prepares and develops
appropriate training programs.
As well as an own initiatives
And I have course in rank of leader preparation

  • à

meets with the head of the electrical maintenance department to coordinate the daily work and attend
regular maintenance meetings.
Prepare, write and review reports

Éducation

Baccalauréat, electrical power & machines engineering
  • à The Faculty of engineering, Zagazeg University
  • mai 2006

Project : unbalanced operation of 3ph induction motor Graduation Project Grade : Excellent

Specialties & Skills

AutoCAD
Electrical Design
Electrical Installation
ADOBE PHOTOSHOP
AUTOCAD
CABLEADO
COACHING
CONSULTING
DISEñO DE LA DISPOSICIóN
DRAFTING
ENGINEERING
GRAPHIC DESIGN

Langues

Arabe
Expert
Anglais
Expert