Abdelmotaal Mousa, A. Resident Engineer

Abdelmotaal Mousa

A. Resident Engineer

NJS Co. Ltd

Location
Kuwait
Education
Bachelor's degree, Civil Engineering
Experience
29 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :29 years, 2 Months

A. Resident Engineer at NJS Co. Ltd
  • Iraq - Basra
  • My current job since March 2021

• Review contractor construction documents (incl. method statement, inspection & test plan) and ensure that their proposed works are in compliance with technical specifications.
• Leader of the site inspection team.
• Provide oversight and coordinate activities of the inspectors to ensure that site work is supervised and inspected correctly.
• Monitor the Contractor’s third-party coordination activities and ensure that necessary permits are obtained from all the relevant third parties prior to the commencement of the construction works.
• Review the completed inspection forms produced by the inspectors to ensure the accuracy and completeness of records.
• Act as a focal point of the team for the Contractor’s pipeline commissioning activities and ensure the successful commissioning of the new pipelines.
• Attend monthly H&S and traffic control safety meetings and provide the Engineer’s input.
• Monitor construction progress and contractor manpower.
• Review contractor’s daily reports to verify contractor’s activities and on-site performance.

resident civil engineer at NJS CO LTD
  • Iraq - Basra
  • My current job since March 2021
Project Manager at United Gulf Construction Company
  • Kuwait - Al Kuwait
  • September 2018 to December 2020

Project: Construction and Maintenance of 6.5 Ring Road (RA/223)
Duration: 36 months
Value: 97 million KD

Section Head at WSP
  • United Arab Emirates
  • October 2017 to July 2018

Project: Construction and Maintenance of Roads Bridges, Storm Water Drainage,
Sewer and other services - South Surra Area - Kuwait

Section Head at Salini Impregilo
  • Saudi Arabia - Riyadh
  • February 2016 to October 2017

Project: Ar-Riyadh Metro - Line 3 (Saudi Arabia)
• Overall responsibility of operation works and coordination for infrastructure in the project
• Management of all site activities
• Manage the infra teams and contractors in the event of emergencies
• Monitor work with community, & contractors to resolve all related issues for smoothly operate of works.
• Coordinate with all other internal dept. to resolve interface issues for infrastructure operations.
• Operation project progress with contractors and to discuss issues/factors coming that have an adverse
impact on the project and to be highlighted for timely corrective measures in order to achieve agreed
completion target.
• Organize, delegate & over see long-term planning of operation related works for the project.
• Coordinate the operation work of the department with government authorities

Project manager at Combined Group Company
  • Kuwait
  • March 2012 to February 2016

Employment Period: 3 years, 11 month
- RESPONSIBILITY AND DUTIES
• Manage the execution of the project with close coordination with the consortium partner, the consultant,
and the Ministry of public works.
- • Manage the project from mobilization to handing over the stage.
- • Manage the design team.
- • Manage the consortium agreement and coordinate with the partner during design execution and handing
over.
- • Manage and coordinate with the consultant at all stages of the project.
- • Manage and coordinate with the owner at all stages of the project.
- • Manage the construction team.
- • Mange safety implementation during construction.
- • Manage Quality control during construction.
CV of Abdel Motaal Mousa Page 4
1-From

Engineer at AKTOR S.A
  • Kuwait
  • April 2009 to February 2012

Construction and maintenance of roads, bridges, storm water drains sanitary sewer and other services for the 1st.
Ring Road JAHRA GATE ROUNDABOUT (Contract RA/106)
Value : 29 Million K.D.
Duration: 36 months
Consultant: PB PARSONS BRINCKERHOFF - GULF CONSULTANT
WORKS DESCRIPTION:
• Construction of Storm water Box Culvert single cell ( 4.00m x 2.50 m ) with total length
2.1 km and Double Cell Box Culvert (4.00m x 2.50 m x 2) with total length 0.5 km
• Construction of Storm Water pipe lines And Gullies for Roads drainage & Troughs using HDPE pipes
with diameters (400, 500 & 600mm). Total Length 7.5
CV of Abdel Motaal Mousa Page 5
• Main Storm Water lines & manholes with concrete pipes (800mm, 1000mm, 1200 mm
& 1800 mm).Total length 0.9 km
• Construction of water supply lines (Ductile Iron Pipes) Fresh & Brackish with total length
14.00 km, Diameters of pipes ( 300mm, 400mm, 500mm, 600 mm )
• Executing of Sanitary pipe lines (Micro Tunneling) concrete pipes with total length
1.8 km, Concrete pipes (from 700 mm ..… to 1700 mm ).
• Executing of HT cables (33 kv. & 132 kv. ), MT cables (11 kv.) And LT cables.
• Executing of Telephone civil works (Ducts & Manholes).

Highway Engineer at COPRI Construction Enterprises WLL
  • Kuwait
  • April 2006 to April 2009

Directing construction of infrastructure (Roads, sanitary sewers, water supply, pump stations and other
services ) projects for New Cairo City- Egypt
• Shop drawings preparation and approval from government authorities
• Submission of daily and annual reports;
• Confer with line manager to resolve operational problems if required.
• Coordinate the operation work of the department with government authorities
• Manage the infra teams and contractors in the event of emergencies
• Monitor work with community, & contractors to resolve all related issues for smoothly operate of works.
• Coordinate with all other internal dept. to resolve interface issues for infrastructure operations

Highway Engineer at COPRI Construction Enterprises WLL
  • Kuwait
  • April 2006 to April 2009

Construction & maintenance of roads, bridges, storm water drains sanitary sewer and other services for the 5th.
Ring road at Abdul Karim Al-Khattabi St
(Contract RA/111)
Value: 23 million K.D.
Duration: 36 months
Consultant: Dar Al-Handasah ( Shair and Partners ) - Jassim Qabazard (Engineering Consultant)
WORKS DESCRIPTION:
• Construction of Storm water Box Culvert single cell (4.00m x 2.50 m) with total length 2.75 km.
• Construction of Storm Water pipe lines And Gullies for Roads drainage using Concrete pipes with
diameters (400, 500 & 600mm). Total Length 6.2 km
• Main Storm Water lines & manholes with concrete pipes (800mm, 1000mm,
& 1200 mm).Total length 1.4 km

Senior Civil Engineer at The Arab Contractors Company
  • Egypt
  • May 1996 to March 2006

Construction of water supply lines (Ductile Iron Pipes) Fresh & Brackish with total length
9.50 km, Diameters of pipes (400mm, 500mm, 600 mm)
• Executing of Sanitary pipe lines (concrete pipes) with total length 1.5 km
(Concrete pipes) With Diameters from 800 mm ..… to 1200 mm ).
• Executing of HT cables (33 kv. & 132 kv. ), MT cables ( 11 kv. ) And LT cables.
• Executing of Telephone works (Ducts & Manhole

Senior Civil Engineer at The Arab Contractors
  • United Arab Emirates
  • May 1996 to March 2006

Company (Osman Ahmed Osman & Co.), EGYPT
Directing the construction of infrastructure projects (roads, storm water drains pipelines, water
supply, pump stations and other services)
In New Cairo city, Egypt for 10 years
RESPONSIBILITY AND DUTIES:
• Directing construction of infrastructure (Roads, sanitary sewers, water supply, pump stations and other
services ) projects for New Cairo City- Egypt
• Shop drawings preparation and approval from government authorities
• Submission of daily and annual reports;
• Confer with line manager to resolve operational problems if required.
• Coordinate the operation work of the department with government authorities
• Manage the infra teams and contractors in the event of emergencies
• Monitor work with community, & contractors to resolve all related issues for smoothly operate of works.
• Coordinate with all other internal dept. to resolve interface issues for infrastructure operations
1. Construction of roads, water supply pipe lines house connection, storm water drains sanitary
sewer and other services), South of Police Academy Zone 5th. Accumulation, New Cairo City
Total Value : 43 million E.P.
Total duration: 18 months

Site Engineer at Ministry of Defense
  • United Arab Emirates
  • November 1994 to March 1996
Site Engineer at Ministry of Defense
  • United Arab Emirates
  • November 1994 to March 1996

Construction of Schools for Ministry of Education - Egypt
RESPONSIBILITY AND DUTIES:
• Apply designs and plans to mark out the site and can be involved in project.
• Perform a technical, organizational and supervisory role on constructions.
• Confer with line manager to resolve operational problems.

Education

Bachelor's degree, Civil Engineering
  • at Minia University
  • May 1993

,

Specialties & Skills

Project Execution
Infrastructure Projects
Water Supply
Stormwater Management
Projects Coordination
CONSULTING
DIRECTING
GOVERNMENT
MICROSOFT WORKS
YEAR END ACCOUNTS
BRIDGES
CABLING
QUALITY CONTROL
Infrastructure Projects
Construction Management
AutoCAD
Materials
Project Management
Civil Engineering
Management
Planning

Languages

English
Expert

Memberships

Engineering Syndicate of Egypt
  • Member
  • August 1993
Kuwait Society of Engineering
  • Member
  • May 2006
- Saudi Engineering Council
  • Member
  • March 2016

Training and Certifications

Road Construction Projects Planning, Designs & Implementation (Training)
Training Institute:
National Consulting Bureau
Date Attended:
May 2011
Duration:
35 hours