Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Achilles Pareno, Lead Testing and Commissioning Engineer

Achilles Pareno

Lead Testing and Commissioning Engineer·COMMISSIONING SERVICES INTERNATIONAL

United Arab Emirates

Bachelor's degree, Bachelor of Science in Electrical Engineering

Work experience

Total years of experience: 21 years, 3 months

Lead Testing and Commissioning Engineer

May 2016 - Present

COMMISSIONING SERVICES INTERNATIONAL

Abu Dhabi, United Arab Emirates

May 2016 - Present

Prepare and update commissioning activity schedules, site observations, site visit reports among others. Review, amend and approve T&C method statement in accordance with the International Standards, Project Specification, Local Regulation and Manufacturer’s Recommendation.

Specific Description of Work of T&C Engineer

 Verify and witness T&C of all electrical equipment such as HV/MV and LV/ELV switchgears, AC/DC UPS panels, Battery banks, electrical control system and Integrated protection and control system (ECS and IPCS)  Set up, operate test equipment to evaluate the performance of electrical components, assemblies or systems under simulated operating condition and record the results.  Analyze and Interpret test report to determine any acceptable and unacceptable results and design related problems.  Provide technical assistance and resolution when electrical and/or engineering problems are encountered during testing and commissioning.  Collaborate with other Electrical Engineers of the client and other key personnel to identify and solve the problems  Conduct periodic site inspection for QA and QC programs. Report the findings and recommendations.  Adhere to safety rules and regulations of the company to avoid accident at worksite. Conduct tool box meeting every start of the work to caution the workforce of all the potential danger in the worksite.

Company industry:
Project & Construction Planning
Job role:
Construction and Building

Sr. Electrical QA/QC Engineer

July 2015 - September 2016

Roots Energy & Engineering Co.

Doha, Qatar

July 2015 - September 2016

(July 24 2015 to September 04, 2016) Sr. Electrical QAC Engineer • QP/ NFIS- GC13107200 / GC14100400 FLARE PROJECT / I/A COMPRESSOR AT DUKHAN • QP/RLIC - GC10109100 RAW SEWAGE EFFLUENT NETWORK • VSDS - GC13111700 VARIABLE SPEED DRIVE SYSTEM AND SOFT STARTER UNITS • Review Quality documents (ITP procedure, Drawing & Vendor Data Sheets, Material Specifications and other Quality related documents submitted by Implementation Contractors) Pertaining to Electrical activities.. • Update to the Quality Control Plan with each Issue for Construction (IFC) design submittal as it relates to the Definable Features of Work (DFOW) and Testing Plan. Review and approve Electrical Subcontractors Quality Control Plan. Review and approve qualifications of Electrical subcontractors Quality Control Manager and jobsite supervision. • Review and check submittals, shop drawings, equipment data, material samples and/or manufacturers for compliance with contract drawings. • Perform the three phases of control on all definable feature of work as identified in the Quality Control Plan in coordination with the construction schedule. (ensure the electrical subcontractor is ready for the Preparatory and Initial Inspections prior to inviting the Corps) • Perform field inspections of electrical system installations verifying that work is in place according to drawings and specs and work meets or exceeds code requirements. • Coordinate electrical QC work with other trades and Turner superintendence to ensure safe and seamless management with all trades and activities. • Implement Turner Accident Prevention Plan. Promote Turner Safety Goals and the culture safety on of the jobsite.

Company industry:
Oil & Gas
Job role:
Quality Control

Field Electrical Engineer - Inspector

March 2014 - July 2015

Mustang Al Hejailan Dar Pi

Riyadh, Saudi Arabia

March 2014 - July 2015

• King Faisal Specialist Hospital and Research Center (KFSH&RC)-Riyadh. In charge in Electrical Site Supervision, Construction Management, Electrical System Inspection and Installation Approval of Five (5) Storey Central Utility Plant which LV, Switch Gear Panel and Equipments; Electrical Substation, Mechanical Pump Rooms, Laundry Facility and Offices for Staff located at KFSH facility in Riyadh Saudi Arabia. The building is equipped with fire detection and alarm system. Centralized overhead and underground cable, and 600m in length connected in underground tunnel which serves as distribution for the new hospital and adjacent expansion buildings.

Company industry:
Construction & Building
Job role:
Quality Control

Site Engineer/Electrical Inspector

February 2013 - February 2014

Samsung Engineering Ltd.

Jubail, Saudi Arabia

February 2013 - February 2014

(Wasit CoGen and Steam Generation Project (Saudi Aramco)
Responsible to coordinate of inspection checklist and report etc. and coordinate with the Suadi Aramco project inspection representative (PID). Review and approve Project Certification on a progressive base and minimizing delays in final certification. Responsible to Coordinate Control and Monitor all Instrumentation Quality Control/Inspection activities and project site with the construction team to ensure the inspection compliance. Preparation & Issuance of Non- Conformance Report ( NCR ) for non-compliance activities against the approve quality plan, inspection test plans, relevant to engineering standard, such as Saudi Aramco Engineering Standard ( SAES ), Saudi Engineering Procedures ( SAEP ) and applicable national and International Codes and Standards ( NEC ), etc.
Responsible to check commissioning test / operational test after completion of the work to determine that the entire system is properly operational.Review project drawing to ensure that the site activities are compliance with the approved designed, changes if any, shall be marked, red line and ensure that the changes reflected in as built-drawings.
Initiate Request for Inspection at different stages of work completion in accordance with SAUDI ARAMCO Typical Inspection Plan (SATIP)
Prepare and Issue Non Conformance Report (NCR) for and deviation in the approved IFC drawings, SAUDI ARAMCO Standards, Quality Plan etc.
Inspection of Grounding Grid and Grounding Rod for Substation Grounding Grid system.
Inspection of Installation of Underground PVC pipes and underground cable installation.
Carry out Material Receiving Inspection and verification of MTC and Delivery note.

Company industry:
Oil & Gas
Job role:
Quality Control

QA/QC Electrical Engineer

October 2010 - December 2012

Sky Oryx JV ( Taisei Corporation / TAV )

Doha, Qatar

October 2010 - December 2012

An Electrical Engineer engaged in Engineering-Procurement-Construction projects. Consistently assumes responsibility to meet projects within time and budget constraints without sacrificing quality. Resort ideas and suggestions whenever needed to satisfy the requirements of the project. Technically proficient in terms of industrial and electrical equipment installation and maintenance.

Company industry:
Civil Engineering
Job role:
Quality Control

QC Electrical Engineer

August 2009 - September 2010

Hyundai Heavy Industries

Manama, Bahrain

August 2009 - September 2010

ALDUR;Kingdom of Bahrain( IWPP - Independent Water and Power Producer ) Conducting Site Inspection at BOP / MCCB, ROArea; Checking of Electrical works such as: Installation of Raceways, AC/MV Motor, Metal Supports, Cable, JB Unit, Boxes, Lighting and Receptacles. Waste Water Treatment, WAR System, RO/UF, ESD, Security Fire alarm.
Inspection of package units such as;11KV Transformer, Switchgear. Monitoring Panel, interface, units, Busduct, HVAC Panel, Cathodic Protection System. Assisting to Site Testing for Electrical Activities, Insulation Resistance Test, Ducter Testing and Hipo Testing. Preparing Monthly Summary Report for Progress Notification of Inspection and Punchlist Updating Report.
Reporting and Coordinating to superior regarding the status of Construction ready for ( RFI ) prior to submit for final Inspection.Conduct Inspection According reference detail drawing, insure complementation of standard quality work and material’s based on NEMA, NEC, IEC, IEE, BS, NFPA, IEEE, NACE, etc.

Company industry:
Construction & Building
Job role:
Quality Control

Site Engineer/Electrical Inspector

April 2007 - June 2009

Al Khatlan Est. Co.

Eastern Province, Saudi Arabia

April 2007 - June 2009

Replace Electrical Equipment @ Five southern GOSP Area ( SAUDI ARAMCO )
Conduct inspection of all materials received on site prior to installation to make sure that all materials are per specification and latest version of Saudi Aramco materials Specification and Standards (SAMSS) and other applicable industry codes and specification base on the classification of area. Also inspect and ensure that all test equipment has valid calibration.
Responsible to check the pre-commissioning test such as:
1.) Insulations / continuity test of all wiring system prior to terminations of equipment’s and panel boards.
2.) Earth resistance test of the grounding system as per Suadi Aramco Engineer Standards.
3.) Inspection of flow meters, sensor of level instruments, temperature instruments for the pump operation.
Have the overall responsibility for the quality manual, quality procedures, work instruction, company procedure and quality control forms and checklist as per ISO 9002; NEMA; UL; NEC and all applicable international standards.
Preparation project quality plans, inspection and test plan (ITP), special work procedures, instrumentation checklist etc. for the projects Quality Plans.Conduct site inspection for all on-going construction activities on regular basis to make sure that all installation are per drawing notes & details and is conforming to latest version of Saudi Aramco Engineer Standard (SAES) and other applicable codes standards. Check and ensure that all field installation shall comply with the latest version of the for construction (IFC) drawings. To ensure that the execution of work is per approved IFC Drawing.

Company industry:
Oil & Gas
Job role:
Quality Control

Senior Service Engineer

March 2006 - March 2007

AsiaPhil Manufacturing Industries, Inc.

Philippines

March 2006 - March 2007

Manufacturing & Engineering…Supply Chain/Logistics…Strategic Planning…process Redesign…Cost Reductions…Operations ImprovementOperations and Engagement in a Variety of Industries, Commercial, General Manufacturing/Industries Products.Diverse, Comprehensive Operational background, including Engineering, Manufacturing, Supply Chain/Sourcing, Logistics Planning and Marketing.

Company industry:
Distribution, Supply Chain & Logistics
Job role:
Engineering

Site Engineer

January 2005 - February 2006

Integrated Utility Corp.

Philippines

January 2005 - February 2006

Supervise installation of cable trays and cable pulling. Initiate installation of magnetic starter and overload rely. Installation of flood lighting system the production area. Termination of electric cable in power /lighting panel. Installation and mounting of electrical low and high voltage rating.
Review project drawing to approved designed, changes if any, shall be marked, red line and ensure the changes reflected in as built drawing. Check power outlet and equipment grounding installation prior to operation. Supervise wiring installation of PVC, wood, metal moulding, EMT, and RGS conduit.
Conduct site /plant surveillance to ensure that construction conformed to the latest revision of conduction drawing. Installation of magnetic contactor /starter, overload relay and disconnecting means.
Evaluate and monitor the installation magnetic control, overload relay in several high current motors.
Check mounting of panel board, safety boxes and other disconnecting means.
Inspect industrial motors three phase and single phase motor using magnetic starter with electrical interlock. Monitor the installation and mounting of electrical low and high voltage rating.

Company industry:
Construction & Building
Job role:
Quality Control

Education

St. Peter College

March 2004

March 2004

Bachelor's degree, Bachelor of Science in Electrical Engineering

Philippines

GPA (percentage): 83%

GPA (percentage): 83%

Electrical Engineer

Skills

Wed Page Design Course
Intermediate
Wed Page Design Course
Intermediate
Basic Computer Course
Intermediate
Basic Computer Course
Intermediate
Computer Skills (microsoft office application), analytical skills
Intermediate
Computer Skills (microsoft office application), analytical skills
Intermediate
Installation
Expert
Installation
Expert
QC
Expert
QC
Expert
Procurement
Expert
Procurement
Expert
Terms
Expert
Terms
Expert
Equipment Installation
Expert
Equipment Installation
Expert
Practical Electricity
Intermediate
Practical Electricity
Intermediate
Design Coordination, Electrical Project Site Supervision, and Testing and commissioning of LV switch
Expert
Design Coordination, Electrical Project Site Supervision, and Testing and commissioning of LV switch
Expert
supervisory
Intermediate
supervisory
Intermediate
QC
Expert
QC
Expert
Electrical
Expert
Electrical
Expert
Inspection
Expert
Inspection
Expert
Testing
Expert
Testing
Expert
Installation
Expert
Installation
Expert
Commissioning
Expert
Commissioning
Expert
Electrical Maintenance
Expert
Electrical Maintenance
Expert
Instrumentation
Intermediate
Instrumentation
Intermediate
Project Execution
Intermediate
Project Execution
Intermediate
MEP
Intermediate
MEP
Intermediate
Quality Assurance
Expert
Quality Assurance
Expert
On Site
Intermediate
On Site
Intermediate
Electrical Engineering
Intermediate
Electrical Engineering
Intermediate
Equipment Installation
Expert
Equipment Installation
Expert
Terms
Expert
Terms
Expert
Procurement
Expert
Procurement
Expert

Languages

English

Expert

Arabic

Intermediate

Japanese

Beginner

Filipino

Expert