1) Qatar Petroleum Project (EPC), Mesaied, Qatar, From Apr 2013 to Sep 07, 2013 (06 Months):
Project Name: EPC of New LGO Tank (2114FI) & Utilization of LC Tank (2145FA) for LGO Service at QP Refinery.
Client: QP Refinery, Mesaeeid Qatar.
Consultant: Technip Middle East, Doha, Qatar.
Worked as Engineer E&I and the Scope of work is subdivided into two parts the first part consist of E&I works for new LGO tank (2114FI) & SER Building 14 and the second part consist of E&I works for utilization of LC tank (2145FA) for LGO service .
2) ORYX GTL Project (Shutdown), Ras Laffan, Qatar, From Jan 2013 to Mar 2013 (03 Months):
Project Name: Modification of Unit 20 Fired Heater Auto Shut OFF Valve Actuators, ORYX GTL Plant, Ras Laffan Industrial Area.
Client: ORYX GTL
Consultant: Technip Middle East, Doha, Qatar.
Main Contractor: Technip Middle East, Doha, Qatar.
Worked as Engineer E&I and the scope of work was given in two parts one part was demolition of existing tubing, air filter regulator, gauges, glands of control cable, filed Q module, limit switches, and second part was installation of heat deflection plates assembled with solenoid valve & air filter regulator, limit switch, tubing, Namur plate, glanding & termination of control cable, assistance in commissioning, loop checking, function test & ready for operation.
3) Head Office, Doha, Qatar, From Oct 2012 to Dec 2012 (03 Months):
Worked as Engineer E&I (Estimation), Head Office, Doha.
Performed evaluation of tenders and BOQ,
Reviewed contract and commercial terms and assessed risks.
Prepared and submitted cost estimation and competitive techno-commercial offers,
Responded to client clarifications regarding tender,
Prepared request for quotations RFQs for material,
Dealt with consultants and vendors,
Performed detailed tender review with PM/GM prior to submission,
Prepared schedule, execution philosophy, method statements, & quality inspection plans for E&I works.
4) QAFCO Project (EPC-Balance Works), Mesaied, Qatar, From April 2012 to Sep 2012 (06 Months):
Project Name: Construction, Installation, Testing, Pre-Commissioning and Commissioning of Collection Storage and Transfer of Waste Water System, QAFCO
Client: QAFCO
Consultant: Pan Maritime
5) QAFCO Project (Shutdown), Mesaied, Qatar, From Feb 2012 to Mar 2012 (02 Months):
Project Name: Construction, Installation, Testing, Pre-Commissioning and Commissioning of Collection Storage and Transfer of Waste Water System, QAFCO
Client: QAFCO
Worked as Engineer E&I Scope and summary of work is given as shifting of electrical load from Ammonia-03 switchgears to urea-03 switchgears, installation of Relays REF-630 ABB on existing switchgears, voltage transformers (VTs), current transformers (CTs), DC power supply, control wiring inside MCC panels, assistance to ABB for commissioning & completed report for project.
6) Sewage Treatment Plant, Project (Construction), Barwa City, Qatar, From Jul 2011 to Feb 2012 (08 Months):
Project Name: Electrical & Instrumentation Works of Barwa City Sewage Treatment Plant.
Client: Ministry of Barwa City
Consultant: Aecom, Doha, Qatar.
Main Contractor: Butec/Degremont, Doha, Qatar.
Worked as Engineer E&I and scope and summary of work is given as installation earthing and control cables, installation of lights & lighting pole, junction boxes, Scada system, local control panels, MDB with battery charger, distribution boards, PLC panel, VFD panels, star delta starters, LV & MV switchgears, 800kVA to 1500kVA generators, UPS. Installation of instruments(i.e. analyzers, level indication transmitters, pressure differential transmitters, sampler panels, level switches, flow indication transmitters, emergency push buttons. Installation of fire & gas detection panels, H2S sensors, flash lights, Siren, detectors. Performed continuity & megger test of power & control cables, performed continuity, megger & Prepared final dossier & completed report for project.