Scientific Assistant Gr.D
Nuclear Power Corporation of India Ltd
Total years of experience :14 years, 5 Months
Since Sept 2005 to till date with
Nuclear Power Corporation of India Ltd.Kaiga
220MWe X 4 pressurized Heavy Water Reactors (PHWR)
Location: Kaiga.
Designation: Scientific Assistant Gr.D
• Overhauling and troubleshooting of Centrifugal pumps, Positive displacement pumps like Triplex plunger type Reciprocating pumps, Screw pumps, Diaphragm pumps, Gear pumps.
• Overhauling of Valves such as Gate valve, Globe valve, Ball valves, Diaphragm valves, Butterfly valves, Needle valves.
• Overhauling and troubleshooting of Fans and Blowers and compressors
• Maintaining and updating of maintenance log, History cards, Deficiency cards.
• Servicing of Relief valves and its testing and calibration.
• Specially trained in servicing and troubleshooting of hydraulic equipments which includes Oil motors, PRV's, FCV's, CBV's, MV/D's, RV's etc.
• Installation and Reconditioning of Mechanical seals.
• Hydraulic cylinders and actuators servicing.
• Pumps Erection and its Alignments.
• Conducting Periodic preventive maintenance checks, Conditioning Monitoring checks and surveillance checks of the system related equipments.
• Fuel handling system Ball Screw and nut assembly servicing and installations.
• Fuelling machine Servicing, its maintenance
• Ram's Load calibration and Ram head calibration
• Commissioning of the Fuel Handling System well ahead of schedule.
• Operation of Fuel Handling System from Centralised Control Room as a First operator
• ON Power Refueling and Spent fuel Discharge operations.
• New fuel loading in new fuel Magazine.
• New Fuel pick up and Exchange Operation from transfer magazine to Fuel Machine
• Spent Fuel Receiving And Storage in Spent Fuel bay.
• Hydro Qualification Of Fuel Machine at a Pressure of 140 Kg/Cm2
• Fault finding in hydraulic system and rectification
• Maintaining the healthiness & testing of the Safety related & Non safety related hydraulic system components
• Efficient Planning, effective execution of preventive and breakdown maintenance schedules of the system
Since Jan 2004 to Aug 2005
As a Proprietor of "Shaikh Contractor"
Clients: Dodsal pvt. Ltd., Larsen and toubro ltd.,
Vijay Industries and projects ltd.
Project: Kaiga Generating Station 3&4
Location: Kaiga.
Designation: Proprietor.
• Fabrication and erection of tanks for Sodium hydroxide and Acids to carry out the pickling.
• Work Order issued for Pickling of pipes of various systems required for the generating plant from Dodsal pvt.ltd.
• Work Order issued for Painting and Wire Brush Cleaning of Large and Small size Pipes and Structural steel from Vijay Industries and Projects ltd.
• Work Order issued for Shuttering and Reinforcement and Manpower supply from Larsen and Toubro Ltd.
• Work accomplish without any complaints and with full satisfaction well ahead of schedules
Since Jan 2002 to Dec 2003
With M/s Gammon India Ltd.
Client: Nuclear Power Corporation of India Ltd.
Project: Kaiga Generating Station 3&4
Location: Kaiga.
Designation: Junior Engineer.
• Reviewing of Drawings, Extraction of Materials Required.
• Material Planning and Procurement.
• Resource Utilisation and Manpower Management.
• Preparation of Embedded Parts, structures schedule.
• Liasoning with the Clients, Preparation of minutes of meeting agendas.
• Fabrication of Embedded Parts, Huge Structures, Piping etc.
• Preparation of quality procedures and involvement in quality Control, Welding Inspections.
Since Sept 2000 to Nov 2001
With M/s JINDAL VIJAYNAGAR STEEL LTD.
Client: JINDAL Vijaynagar Steel Ltd.
Project: Pellet Plant.
Location: Tornagallu, Bellary.
Designation: Senior Technician.
Notable Accomplishment.
• Commissioning of the Heavy Rotating Equipments well ahead of schedule.
• Commissioning of Dryers, Ball Mill, Compressors. Additive Grinding Mills.
• Commissioning of Bucket Conveyors, Balling Disks, Indurating Machine.
• Commissioning of Belt Conveyors, Silos, Carbon Monoxide Pipelines, And the Pipelines related to the system.
• Fabrication of Pipelines, Structural steel fabrication, Welding Inspection.
• Operation & Maintenance of Heavy rotating Equipment as Dryers, Ball mills, Additive Grinding Mills.
Since June 1995 to Mar 1997
With M/s Reliance Engineering services.
Client: Nuclear Power Corporation Of India Ltd.
Project: Kaiga Generating Station
Designation: Supervisor.
• Fabrication of steel structures and piping.
• Review of Drawings and material planning.
• Manpower management.
• Up keepment of Stores
QUALITY/TROUBLESHOOTING
• Performing functions of troubleshooting & breakdown/ preventive/ shutdown maintenance for bringing down system equipments downtime to a minimum level.
• Establishing quality standards, implementing stringent quality control systems to enhance quality and reduce rejection level.
• Ensuring maintenance with proper documentation for maintaining compliance with ISO requirements.
• Actively involved in quality circle in troubleshooting arising in day-to-day activities