Sr ELV Engineer
Espina IT Solutions LLP
Total years of experience :12 years, 8 Months
Control, Key Management System, Guard Tour System and
Fire Alarm System.
• Preparation of Bill of Quantities (BOQ)& Costing, Cost
Calculations, Material Submittal, Method Statements and
Drawings, Handing Over and O & M Manuals.
• Good at engineering, designing, Commissioning and
Integration of ELV systems in accordance with standards and
project specifications.
• Proficient with planning, project supervision in Installation and
project performance.
• Ability to take the initiative and work under pressure.
• Superb communication and presentation skills and display a
positive attitude towards the consultant / client
Marina Gate-1-Dubai, Lego land-Dubai, Ikea Distribution Centre-JAFZA, Silicon Park, DSO-
Dubai
Report to Project Manager at all stages on following responsibilities.
➢
Prepare project schedule, project plan and calculating time requirements; sequencing
project elements
➢
Prepare project status reports by collecting, analyzing, and summarizing information and
trends, recommending actions.
➢
Prepare Method Statement, Material Submittal, Technical Documents, Shop Drawings.
➢
Monitoring complete project progress, coordinating activities and other systems.
➢
Guide Draughtsman in preparation of Shop Drawing, Schematics and Section drawings.
➢
Coordinating with all other services for coordination drawing.
➢
Controls project costs by reviewing and monitoring project expenditures.
➢
Coordinate with consultants, contractors and sub-contractors and involve in design/review/
implementation of all ELV functions and discipline required for the project
➢
Ordering and procuring materials as per site requirement.
➢
The Sole responsibility for the site works implementation and documentation in order to
achieve the project target completion date.
➢
Supervise the subcontractors to carry out site works according to design intent and the
suppliers for the timely delivery of equipment.
3
➢
Assure that the installations of ELV related systems (CCTV, ACS, SCS, FAS, BMS, AVI etc.) are
in compliance with drawings, required specifications and standards
➢
Keep records and related data of site progress in order to maintain regular/timely update to
Senior Manager.
➢
Submitting claims for completed work on monthly basis for client approval.
➢
Preparation of interim payment application, variation and subcontractors Payment
certificates
➢
Prepare WIR for the work done.
➢
Attend site meetings from time and time and liaise with other trades for details of works and
coordination of requirements amongst various parties.
➢
Perform testing and commissioning of the installed systems and handover to the parties
concerned.
➢
Good at Integration (Genetec) with CCTV, Intercom and Access control systems.
➢
Providing training to client/end-users for final hand over.
➢
Follow and attend the consultant snags and close the same, obtain the completion certificate
with timely follow-up
Projects : Oberai Chamber, Oberai Tower 1 & 2-Residential
)