Senior Automation & Electrical Technician
MenaBev (Pepsi Cola Bottler)
Total years of experience :14 years, 7 Months
Develop and implement preventive, predictive, and corrective maintenance plans and compliance of automated beverage lines and manufacturing. Establish and conduct basic troubleshooting and machine setup training for operators and technicians, including AC/DC drives, servo drives, PLCs, and HMI. Ensure requisition of spare parts, tools, equipment, and supplies required for maintenance. Complete installation and commissioning of new equipment systems; amelioration and modification of PLCs program of machines. Provide technical guidance and best practice to operations staff. Submit daily reports and breakdown analysis reports.
● Reduced the time of peppering production by 20 minutes through installation and programming of refractometer with integration in HMI on BIB Filler.
● Evaluated the Automation and Electrical critical spare parts needed and ensured availability and backup action plan for any machine/component failures.
Performed preventive and corrective maintenance on equipment and facility. Ensured efficiency of operation by setting up, maintaining, and repairing manufacturing equipment. Diagnosed, replaced, and repaired parts to equipment and systems. Enforced safety and GMP practice requirements in execution of assigned duties. Observed and tested operation of systems and equipment to diagnose malfunctions using testing devices. Inspected equipment and systems for damage and malfunctions, taking necessary action as per applicable codes and standards.
● Overhauled labeller machine and increased the speed machine from 20000b/h t0 26000 b/h.
● Suggested improvements to all maintenance processes, including planning scheduling, preventive maintenance, and
corrective maintenance.
Effectively managed electrical onsite labor for the project and coordinated onsite electrical sub-contractors. Determined daily schedules and assignments for work activities, including execution. Reviewed electrical drawing layout plan HV, LV power, lighting, cable tray, grounding system, and panel layout plan. Inspected electrical work ensuring regulatory standards were met. Produced daily and weekly progress reports to present to the Site Manager.
● Created progress reports and task schedules which resolute to good performance and height work quality.
Installed, connected, tested, maintained, and repaired electrical fixtures, wiring, and lighting systems. Interpreted drawings, schematic diagrams, wiring, and rewiring of the electrical cabinet. Used appropriate test instruments and circuit diagrams to diagnose equipment malfunctions. Executed preventive and corrective maintenance of HV/LV systems, including transformer, switchgear, distribution board panels, and load circuit. Utilized proper personnel protective equipment (PPE) with applicable safety policies, procedures, and practices to complete all work.
● Successfully developed electrical maintenance program.
Diploma in Electrical Maintenance Industrial Technician