مهندس عمليات
مجموعة العبيكان للاستثمار الصناعي
Total years of experience :3 years, 3 Months
• Utilize different technologies, techniques, practices, and standards throughout the project phases.
• Monitor and analyze site key Energy Performance Indicators, water consumption, GHG emissions, and material waste.
• Develop and implement plans for improving production efficiency and reducing waste.
• Participate in plant improvement projects at all stages, from conceptual design to commissioning.
• Troubleshoot process issues and develop solutions to improve process efficiency.
• Work with cross-functional teams to implement process improvements and optimize production processes.
• Ensure compliance with safety and environmental regulations.
• Provide regular progress reports to management
تدريب لدئ وزاره المياه والزراعه
MY GRADUATE PROJECT Project work is an attempt to design a plant for synthesis of 1000 kg/h of syngas from biomass using fluidized bed gasifier/ plug flow reactor(PFR). Design of gasifier/PFR has been carried out in the present work. Also, drier, heat exchanger and cyclone separator have been designed. Simulation of the process of syngas production is being carried out by using ASPEN-HYSYS software. Plant layout, cost estimation and HSE (health, safety and environment) have also been covered in this project work.