Electrical Superintendent
General Contracting Company
مجموع سنوات الخبرة :8 years, 8 أشهر
Maintaining site electrical works in compliance with all
safety requirements.
• Monitoring installation and operations to consistently
meet the rigorous RC requirements.
• Reviewing and approving quality requirements for
purchase orders and engineering specifications to meet
contract compliance.
• Scheduling and planning all required materials, tasks,
and team assignments.
• Accomplishing and Finalizing project documents:
(ITPs, HPRs, ICLs, DQCR, CMQR, MS, RL-Drwgs)
• Managing performance evaluation and scheduling of
electrical team members.
• Improving methods for measurement, documentation,
and workflow management.
proficient in all electrical site and technical office works
(Lighting - Power - Fire Alarm - Data &Telephone -CCTV - Sound System - Access Control - Intrusion System - Queuing system )
• Created electrical shop drawings and schematics using AutoCAD.
• Applied appropriate engineering methods to all project discipline standards.
• Evaluated installed electrical equipment and systems to isolate faults and implement corrective actions.
• Planned all project electrical resources and budgets.
• Coordinated activities between cross-functional teams, including MEP, Civil and Architectural activities.
Executed electrical works according to project specifications and to latest approved shop drawings
for following Systems:
- Lighting & Power Systems.
- Light Current Systems (Fire Alarm, Data &Telephone,
ONT, CCTV, MATV, Access Control, Speakers).
- BMS System.
- Earthing System.
- Low & Medium Voltage substations and networks
• Reviewed over 80 shop drawings and changes in quantity between tender drawings & BOQ.
• Provided input to Quantity Surveyor for interim payment Applications.
• Monitored project daily progress vs. Plan and schedule.
• Prepared construction method statements (MS), Material Submittals and any other site related technical documents.
• Update drawings to fit newly approved modification for As-Built drawings.
• Supervised construction and pre-commissioning of electrical rooms, substations, and service buildings for technology area project.
• Monitored & Evaluated Subcontractor's performance and solved operational and technical issues on site.
• Conducted field surveys and studied maps and diagrams to identify and correct power system problems.
Executes lighting and Power systems from construction phase to finishing phase
Graduation project: Speed control of seperately excited DC motor & Educational Kits