Abdulrazak Naser, Pipeline Engineer

Abdulrazak Naser

Pipeline Engineer

Saipem

Location
Türkiye - Ankara
Education
Master's degree, Chemical Process Engineering
Experience
24 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :24 years, 4 Months

Pipeline Engineer at Saipem
  • Qatar - Doha
  • My current job since January 2000
Project Engineer at SAIPEM
  • Saudi Arabia
  • November 2017 to June 2019

the discipline team for the project and ensure that they deliver project requirements on time and within budget.
•Manage all aspects of the discipline scope for the project, implementing requirements including technical integrity, safety, and sustainable design where applicable.
•Liaise with other engineering and technical personnel including personnel from other disciplines to ensure overall project goals are met.
•Ensure that the project and any changes to the project comply with:
Company systems’ policies, processes, procedures, and standards.
•Support the associated procurement, contracting strategies and processes to ensure that project deliverables meet project requirements on time and within budget.
•Where required, prepare, or assist in the preparation of project documentation such as budgets, estimates, forecasts, schedules, and reports.
•In conjunction with the Location Management team, identify and manage discipline resources and competency requirements of the team.
•Establish and maintain relationships with contractors, clients and other Company’s personnel as required by the project.

Senior Pipeline Pre-commissioning Engineer at SICIM
  • Türkiye - Erzincan
  • May 2016 to November 2018

TANAP GAS PIPELINE PROJECT

Senior Process Engineer at ASAS OIL & GAS CONTRACTING Ltd
  • United Arab Emirates
  • January 2011 to December 2013

EPC Contract - Value of Contract 170.3 $ US Million
•North Gas Project
Project Consisting of:
•Gas Gathering Station, Capacity 3MSCM/Day -
•Manifold and 3 Separators and Dehydration Unit, Metering Skid, and all Utility Facilities
• 6 Well Heads - 6 Flow Lines.
• 16" Gas Pipeline Length 28 KM & 8" Condensate Pipeline Length 22 km.

Responsibilities/ Duties:
During Engineering phase, HYSYS and PIPESYS Simulations Process Engineering.
•Hydraulic Study and Simulation for Liquid and Gas Lines.
•Design Basis - PFD & and P&ID
•Heat and Material Balance
•HAZOP Study Review
•Preparation of Materials Specifications and Data Sheets.
monitor and review the Engineering Work According to Engineering Documents (specification, calculation, datasheet, MTO) and drawings of piping & pipeline, manage coordination with Procurement team for purchasing items, assist PM in preparing and identifying Change Order to the client.
During Commissioning phase, worked as Pre-Commissioning & Commissioning to prepare the documents of pre-commissioning and commissioning procedures, check-sheet for piping & pipeline, ICCP, and supervise the works of all pipeline & piping pre-commissioning & commissioning including Hydrotesting, Cleaning Flushing, Caliper Survey, Swabbing, Drying, Reinstatement & flange management, blowing, N2-He Leak Test, Gas Purging Until Performance Test

Senior Process Engineer at Engineering Company
  • United Arab Emirates
  • October 2009 to January 2011

Management) China:
Engineering and Consultancy Services for Upgrading and Expansion of existing facilities.
Oil & Gas Fields -SINOPEC China).
Engineering for Oil Fields and its Flowlines & Pipeline Systems:
•Feasibility studies,
Economic studies and Cost Analysis of new Facilities, flowlines and Pipelines,
Upgrading of existing systems. Conceptual Design, FEED, detail design & Engineering and procurement support including Pumps, pigging facilities, valve stations.
•Hydraulic Study and Simulation for Liquid and Gas Lines.
•Design Basis - PFD & and P&ID
•Heat and Material Balance
•HAZOP Study Review
•Preparation of Materials Specifications and Data Sheets.
• NPSH calculation of pumps and pump selection
•Reviewing existing data and verifying vendor document to check compliance with process requirements.
•Assessing the safety and environmental impact of the equipment

Sr. Project Manager at Gas Oil Technical Company
  • May 2009 to October 2009

Pre-Commissioning, Commissioning and Start- up
24” Syria - Lebanon Gas Pipeline and Metering Station & 10” Gas Pipeline from Metering Station to Power Plant. (Ministry of Power - Lebanon). Project budget 385.000 $
•Responsibilities/ Duties
•Quotation, Prepared proposal documents, ( C.T.R.) cost time resources , equipment list and pricing Man power - qualification information, technical and commercial clarifications, schedules and other supporting and services and executed the work at site .
•Preparing Procedures and Execution the Works.
•Initial cleaning.
•Hydro testing.
•Dewatering and Final Cleaning.
•Final Gauging.
•Draying till -20 C°.
•Nitrogen Purging.
• Leak Testing.
•Gas Inserting and Startup.

Site Manager at TECPESA
  • October 2007 to December 2007

Hot Tapping Project for 16" Gas Pipeline -in 8 locations.
8 spled tees 16" hot welding - 8 hot welds 4" - 16 hot welds 2"
8 hot tapping 16" - 8 hot tapping 4" - 16 hot tapping 2".
8 stopple 16" - 8 stopple 4”.

Senior Pipeline Engineer
  • May 2003 to May 2004

Banias Pipeline Project- phase I
•EPC Contract - Value 217.3 million $ U
Diameter 24" - Length 135 km, 4 valve stations, one pressure reducing & metering station.
Responsibilities/ Duties:
FEED Basic Design and Detailed Design
Site Investigation / Survey and Data Collection
Pipeline route reconnaissance
Pipeline Mechanical Design Calculations (Wall Thickness, Crossing Design, etc.)
Preparation of Materials Specifications and Data Sheets.
Provide necessary inputs to Designers for preparation of various layouts, detail drawing, MTOs.
Knowledge of selection of materials
Review of other discipline deliverables for interface checking, inter discipline co-ordination activities.
Preparation of Material Requisitions.
Evaluation of Technical Quotations / Offers submitted by the Vendors.
Review and approval of Vendor Data / Drawings
Engineering Workshops, Preparation of CTRs.
Responsible for working within the provisions and guidelines of the Quality Assurance system
Responsible for personal safety safe working practices
• Work Shop Inspection & Functional Test for Gas Heaters Gas Station in Manufacturer work shop - KCC (England) in ABU DHABI.

Senior Pipeline Engineer at CONSTRUCTION LTD
  • September 2001 to October 2002

: Gas Pipeline Project
EPC Contract - Value 45 million $ US
Diameter 24" - Length 235 km. - Six Block Valve Stations,
one pressure reducing & metering station.
Contractor: A-Hak, Subcontractor LEAD Contracting and Trading.
Responsibilities/ Duties:
FEED Basic Design and Detailed Design
Site Investigation / Survey and Data Collection
Pipeline Mechanical Design Calculations (Wall Thickness, Crossing Design etc.).
Preparation of Materials Specifications and Data Sheets.
Provide necessary inputs to Designers for preparation of various layouts, detail drawing, MTOs.
Selection of materials
Review of other discipline deliverables for interface checking, inter discipline co-ordination activities.
Preparation of Material Requisitions.
Evaluation of Technical Quotations / Offers submitted by the Vendors.
Prepare Purchase Requisition/Order
Review and approval of Vendor Data / Drawings
Engineering Workshops, Preparation of CTRs.
Responsible for working within the provisions and guidelines of the Quality Assurance system
Responsible for personal safety safe working practices

Education

Master's degree, Chemical Process Engineering
  • at Azerbaijan State Petroleum Academy
  • June 1997

. •University:

Specialties & Skills

Process Engineering
Pipeline Design
Pipeline Building
Process Reviews
Pipeline Development
CONCEPTUAL DESIGN
MATERIALS MANAGEMENT
OIL PAINTING
DATA COLLECTION
GRAPHIC DESIGN
MECHANICAL DESIGN
QUALITY CONTROL
WORKSHOPS
ENGINEERING

Languages

Arabic
Expert
English
Expert
Russian
Expert
Turkish
Expert

Training and Certifications

FIRE FIGHTING SYSTEMS (Training)
Training Institute:
ENPPI
Date Attended:
November 2005
Duration:
40 hours
quality management (Training)
Training Institute:
INTEX
Date Attended:
June 2006
Duration:
25 hours
basic safety offshore training (Training)
Training Institute:
Baku Training Center
Date Attended:
January 2018
Duration:
30 hours

Hobbies

  • Reading