Pipeline Engineer
Saipem
مجموع سنوات الخبرة :24 years, 4 أشهر
the discipline team for the project and ensure that they deliver project requirements on time and within budget.
•Manage all aspects of the discipline scope for the project, implementing requirements including technical integrity, safety, and sustainable design where applicable.
•Liaise with other engineering and technical personnel including personnel from other disciplines to ensure overall project goals are met.
•Ensure that the project and any changes to the project comply with:
Company systems’ policies, processes, procedures, and standards.
•Support the associated procurement, contracting strategies and processes to ensure that project deliverables meet project requirements on time and within budget.
•Where required, prepare, or assist in the preparation of project documentation such as budgets, estimates, forecasts, schedules, and reports.
•In conjunction with the Location Management team, identify and manage discipline resources and competency requirements of the team.
•Establish and maintain relationships with contractors, clients and other Company’s personnel as required by the project.
TANAP GAS PIPELINE PROJECT
EPC Contract - Value of Contract 170.3 $ US Million
•North Gas Project
Project Consisting of:
•Gas Gathering Station, Capacity 3MSCM/Day -
•Manifold and 3 Separators and Dehydration Unit, Metering Skid, and all Utility Facilities
• 6 Well Heads - 6 Flow Lines.
• 16" Gas Pipeline Length 28 KM & 8" Condensate Pipeline Length 22 km.
Responsibilities/ Duties:
During Engineering phase, HYSYS and PIPESYS Simulations Process Engineering.
•Hydraulic Study and Simulation for Liquid and Gas Lines.
•Design Basis - PFD & and P&ID
•Heat and Material Balance
•HAZOP Study Review
•Preparation of Materials Specifications and Data Sheets.
monitor and review the Engineering Work According to Engineering Documents (specification, calculation, datasheet, MTO) and drawings of piping & pipeline, manage coordination with Procurement team for purchasing items, assist PM in preparing and identifying Change Order to the client.
During Commissioning phase, worked as Pre-Commissioning & Commissioning to prepare the documents of pre-commissioning and commissioning procedures, check-sheet for piping & pipeline, ICCP, and supervise the works of all pipeline & piping pre-commissioning & commissioning including Hydrotesting, Cleaning Flushing, Caliper Survey, Swabbing, Drying, Reinstatement & flange management, blowing, N2-He Leak Test, Gas Purging Until Performance Test
Management) China:
Engineering and Consultancy Services for Upgrading and Expansion of existing facilities.
Oil & Gas Fields -SINOPEC China).
Engineering for Oil Fields and its Flowlines & Pipeline Systems:
•Feasibility studies,
Economic studies and Cost Analysis of new Facilities, flowlines and Pipelines,
Upgrading of existing systems. Conceptual Design, FEED, detail design & Engineering and procurement support including Pumps, pigging facilities, valve stations.
•Hydraulic Study and Simulation for Liquid and Gas Lines.
•Design Basis - PFD & and P&ID
•Heat and Material Balance
•HAZOP Study Review
•Preparation of Materials Specifications and Data Sheets.
• NPSH calculation of pumps and pump selection
•Reviewing existing data and verifying vendor document to check compliance with process requirements.
•Assessing the safety and environmental impact of the equipment
Pre-Commissioning, Commissioning and Start- up
24” Syria - Lebanon Gas Pipeline and Metering Station & 10” Gas Pipeline from Metering Station to Power Plant. (Ministry of Power - Lebanon). Project budget 385.000 $
•Responsibilities/ Duties
•Quotation, Prepared proposal documents, ( C.T.R.) cost time resources , equipment list and pricing Man power - qualification information, technical and commercial clarifications, schedules and other supporting and services and executed the work at site .
•Preparing Procedures and Execution the Works.
•Initial cleaning.
•Hydro testing.
•Dewatering and Final Cleaning.
•Final Gauging.
•Draying till -20 C°.
•Nitrogen Purging.
• Leak Testing.
•Gas Inserting and Startup.
Hot Tapping Project for 16" Gas Pipeline -in 8 locations.
8 spled tees 16" hot welding - 8 hot welds 4" - 16 hot welds 2"
8 hot tapping 16" - 8 hot tapping 4" - 16 hot tapping 2".
8 stopple 16" - 8 stopple 4”.
Banias Pipeline Project- phase I
•EPC Contract - Value 217.3 million $ U
Diameter 24" - Length 135 km, 4 valve stations, one pressure reducing & metering station.
Responsibilities/ Duties:
FEED Basic Design and Detailed Design
Site Investigation / Survey and Data Collection
Pipeline route reconnaissance
Pipeline Mechanical Design Calculations (Wall Thickness, Crossing Design, etc.)
Preparation of Materials Specifications and Data Sheets.
Provide necessary inputs to Designers for preparation of various layouts, detail drawing, MTOs.
Knowledge of selection of materials
Review of other discipline deliverables for interface checking, inter discipline co-ordination activities.
Preparation of Material Requisitions.
Evaluation of Technical Quotations / Offers submitted by the Vendors.
Review and approval of Vendor Data / Drawings
Engineering Workshops, Preparation of CTRs.
Responsible for working within the provisions and guidelines of the Quality Assurance system
Responsible for personal safety safe working practices
• Work Shop Inspection & Functional Test for Gas Heaters Gas Station in Manufacturer work shop - KCC (England) in ABU DHABI.
: Gas Pipeline Project
EPC Contract - Value 45 million $ US
Diameter 24" - Length 235 km. - Six Block Valve Stations,
one pressure reducing & metering station.
Contractor: A-Hak, Subcontractor LEAD Contracting and Trading.
Responsibilities/ Duties:
FEED Basic Design and Detailed Design
Site Investigation / Survey and Data Collection
Pipeline Mechanical Design Calculations (Wall Thickness, Crossing Design etc.).
Preparation of Materials Specifications and Data Sheets.
Provide necessary inputs to Designers for preparation of various layouts, detail drawing, MTOs.
Selection of materials
Review of other discipline deliverables for interface checking, inter discipline co-ordination activities.
Preparation of Material Requisitions.
Evaluation of Technical Quotations / Offers submitted by the Vendors.
Prepare Purchase Requisition/Order
Review and approval of Vendor Data / Drawings
Engineering Workshops, Preparation of CTRs.
Responsible for working within the provisions and guidelines of the Quality Assurance system
Responsible for personal safety safe working practices
. •University: