Qaqc Engineer
National Marine Dredging Company
مجموع سنوات الخبرة :15 years, 7 أشهر
Preparing ITP as per the project specification, approved drawings and method statement and getting
approval from the client or consultant.
Preparing material submittals with the required documents and getting approval from the client
Raising ITRs with the approved drawings and inviting the client/ consultant for inspection
Raising MIRs for the materials inspection of the arrived materials and getting approval from the
client/consultant
Performing pre-inspections prior to the joint inspections with client representative (Consultant)
Performing the onsite testing with approved third party laboratory
Sending materials for testing at laboratories and follow up for test reports
Maintaining all the documents on folder and updating the registers of Material approvals, ITPs, ITRs
and MIRs
Raising internal site observation and NCRs when non-conformance performed
Closing the site observations and NCRs once the site complied with requirements and specification
Reviewing submitted prequalification of sub-contractor as it follows t
he client’s requirement
Reviewing material submittals and ITP of sub-contractor as it follows the project specification and
approving.
Attending for the inspection invited by the sub-contractor and checking as per the drawing
specification.
Regular site visit to monitor the implement of specification and requirement, and to avoid noncompliance.
Approving the supplier by confirming as it complies the client’s requirements and specification
Preparing and closing of punch list for the hand over process
Preparation of dossier for the handover after project completion
as a qc inspector ensuring the site activities are as per the ITP, Method statement, PQP, drawings and specification
as a qc inspector ensuring the site activities are as per the ITP, Method statement, PQP, drawings and specification
1) Six Construct Company Ltd. (October 2014 ~ Present)
Presently working as a QA/QC engineer at the ongoing project DUBAI WATER CANAL PROJECT
Main Contractor: SIX CONSTRUCT.
Client: RTA (ROAD & TRANSPORT AUTHORITY)
Consultant: HALCROW
Project: DUBAI WATER CANAL (Project contains 3.2km length of canal crossing through Sheik Zayed road, Al Wasl Road & Jumeirah road)
2) Six Construct Company Ltd. (January 2013 ~ Present)
Workedg as a QA/QC engineer, in UAE (Dubai), at Six Construct (BESIX). The ongoing project DUBAI TRAM .
Main Contractor: SIX CONSTRUCT.
Client: RTA (ROAD & TRANSPORT AUTHORITY)
Consultant: SYSTRA
Project: DUBAI TRAM project is 14.5 km track line for the access of TRAM. All cable systems are underground there are no overhead cables. So under track lines, there are duct banks for power supply cable & signaling cable, underground drainage system, 13 STATIONS & DEPOT.
Project: It is an Offshore Civil and Marine Works, for the construction of gas plant. The project location is situated 150 km from the coastal of Abudhabi. The plant was constructed inside the sea by placing quay walls on either side of 300m wide & 1, 200m length and raised up to 12m of Datum level. The inner portions are backfilled with reclamation material through dredger. The projects contains the soil improvements, 1200 pilings, small & large foundations, substations, outstations, cable trenches, drainage systems, duct banks, interlock road, pipelines, pipe protection foundations, etc, .
Job Responsibilities:
• Ensures that the Project Quality requirements are understood at all levels.
• Ensures that inspection activities are coordinated and carried out to specified requirements.
• Develop inspection procedures and implement throughout the construction stages
• Necessary assistance for getting approvals from the consultant for day to day project works
• To arrange / ensure timely inspection and approval of all materials / equipment delivered / completed installations at site by Consultants and maintain records
• To ensure timely action on any comments / complaints by the Consultant/ Client and closing of NCRs, if any
• To ensure that all testing and measuring instruments are calibrated as per standard requirements
• Ensure implementation of quality standards and control
• Maintaining the records, of RITA, NCR, IAR, CONRETES ARRIVAL, TEST RESULTS
• Implementing Quality Management System.
• Implementing Quality policy and objectives .
• Safekeeping of all quality manuals, procedures, work instructions, work standards, forms, records and other quality related documents relevant to the project.
• Attend all Quality Control meetings with Project Management, Consultants as applicable.
3) Six Construct Company Ltd. (September 2011 ~ December 2012)
Worked as a QA/QC engineer, in UAE (Abu Dhabi), at Six Construct Company. For the Gas development project of IGD (Integrated Gas Development), in DAS Island, ABUDHABI - UAE.
Main Contractor: Hyundai Heavy Industries Co. Ltd.,
Client: ADGAS (Abudhabi Gas Liquefaction Company).
Consultant: Worley Parsons
Project: It is an Offshore Civil and Marine Works, for the construction of gas plant. The project location is situated 150 km from the coastal of Abudhabi. The plant was constructed inside the sea by placing quay walls on either side of 300m wide & 1, 200m length and raised up to 12m of Datum level. The inner portions are backfilled with reclamation material through dredger. The projects contains the soil improvements, 1200 pilings, small & large foundations, substations, outstations, cable trenches, drainage systems, duct banks, interlock road, pipelines, pipe protection foundations, etc, .
Job Responsibilities:
• Ensures that the Project Quality requirements are understood at all levels.
• Ensures that inspection activities are coordinated and carried out to specified requirements.
• Develop inspection procedures and implement throughout the construction stages
• Necessary assistance for getting approvals from the consultant for day to day project works
• To arrange / ensure timely inspection and approval of all materials / equipment delivered / completed installations at site by Consultants and maintain records
• To ensure timely action on any comments / complaints by the Consultant/ Client and closing of NCRs, if any
• To ensure that all testing and measuring instruments are calibrated as per standard requirements
• Ensure implementation of quality standards and control
• Maintaining the records, of RITA, NCR, IAR, CONRETES ARRIVAL, TEST RESULTS
• Implementing Quality Management System.
• Implementing Quality policy and objectives .
• Safekeeping of all quality manuals, procedures, work instructions, work standards, forms, records and other quality related documents relevant to the project.
• Attend all Quality Control meetings with Project Management, Consultants as applicable.
4) Worked as a Site Engineer in Archirodon Overseas Construction Company at the Khalifa Port Project, in Khalifa Port & industrial zone, Taweela, Abu-Dhabi. It is an offshore construction of Breakwater, Revetments, Bridges and Quay wall.
Client: Abu Dhabi Ports Company (ADPC)
Consultant: BECHTEL
Project Title: Khalifa Port Project, Taweelah, Abudhabi.
5) Worked as a Site Engineer - ELIXIER II (UAE) :
Worked as a Site Engineer in Archirodon Overseas Construction Company in the Elixier II Mirfa1 project - Seawater Intake and Outfall project Abu Dhabi in the pipeline project. The Elixier is a joint venture of Abu Dhabi National Oil Corporation and LINDE (German Company) The consortium building the Air Separation Unit (ASU plant) for the Nitrogen production. In which we are doing a part of pipeline work
Client: Abu Dhabi National Oil Corporation & LINDE
Consultant: LINDE
Project Title: Sea water Intake & Outfall for ASU plant
Job Responsible:
• Getting the work permits from the client.
• Starting the work at the specified time without any delay.
• Discussing with the Project Engineer about the progress.
• Producing the progress reports to Project Engineer regularly.
• Checking the sea bed level by Bathymetric survey.
• Checking the levels of the bedding at the dredged area where the Piers or blocks of Quay wall is going to be placed.
• Submitting the reports for the inclination and levels of Piers and Quay wall blocks.
• Producing the as built drawing for the placed Piers and blocks of Quay wall in an AutoCAD.
• Finding out the variations from the design drawing and the as built if the variation is more than a tolerance it will be changed.
• Each and every progress completed we should inform it to Quality Control department. After the QC’s satisfaction they will bring the client QC inspector. They will check and approve our progress. If they did not approve we recommence our progress in which they did not approve.
I will make a drawing as of the given survey points & shop drawings