Implementation Manager Fixed Network
Al Aseel Netkom Technology L.L.C Muscat Oman
Total years of experience :9 years, 8 Months
More Then 3 year to Working as Implementation Manager Fixed Network Department. Managing the Team Work, Customer Relationship, PO, s Handling and Technical Difficulties related Equipment (OLT's, MSAG's, MSAN's, ATN's, BONT's and CX core Equipment.
Managing the below mention Projects.
1-Omantel Fixed Network Project
2-Omantel MW ATN Project
3-Omantel Ipcore Project
4-IBMS Project
5- Ooredoo Fixed Network Project
6-OSP Project
Xad Technologies L.L.C UAE (Subcon of Etisalat) (2014 to 2014)
Three Month in Xad Technologies L.L.C UAE at GPON (FTTH) network, work at ONT, FDH, Fiber, Routers, PABx, IAD Installation and Commission and etc..
. Responsibilities:
1-Installation and Configuration of Modems and Switches
2-Installation of ONT, STB
3-Work on FDH.
4- Installation and Troubleshooting of FTTH Connection
5-Triple Play Services test
6-IAD Installation and Commission
7-Fiber Testing
8-Jointing
More Than 3 Year experience in Telecom (Access) & power Involving Commissioning, Installation and Maintenance of MSAG, DSLAM, Modems, ONT, STB, Routers (Installing and configure) DDF, ODF. Fiber lying, FDH, FTTH (GPON). In FCB (Fast Charging Batteries), Rectifiers (Emerson, Delta, Cisco) and Battery Projects in all of the country Pakistan.
working as Fixed Network Engineer leading a team of Access Department Supervisors and Technicians for various 37K MSAG project & 260K MSAG Project and FTTH (GPON) Project .
Projects & Responsibilities:
PTCL 50K DSLAM PHASE (A, B)
Installation,
Configuration,
PAT Protocol tests and Service configurations of HUAWEI’s DSLAM equipments
Power tests
In This Project work as Engineer
PTCL SULFURIZATION RECTIFICATION FOR MA5616 MINI DSLAM.
Backup Configuration and short Switch, on Live Network,
Verify the Configuration regards DATA, PROGRAM, and CONFIG.
In This Project Work as Engineer
PTCL UA5000 OFAN. (Live Network activities)
Backup Configuration and short Switch, on Live Network,
Verify the Configuration regards DATA, PROGRAM, and CONFIG.
In This Project work as Engineer
PTCL 50K C & 20K DSLAM
Configuration,
PAT Protocol tests and Service configurations of HUAWEI’s DSLAM equipments
Power PAT
Earthing
Quality test
Battery Testing
In this project work as Engineer
PTCL 100 K DSLAM
Configuration,
PAT Protocol tests and Service configurations of HUAWEI’s DSLAM equipments
Power PAT
IPTV Services Test
Earthing
Quality Test
Power D.Bs installations
Battery Testing
In this Project work as Team Lead.
PTCL 37K MSAG & 260K MSAG (Multi Service Access Gateway) UA 2000 Project
Configuration,
PAT Protocol tests and Service configurations of HUAWEI’s MSAG equipments
Power PAT
VoIP test
IPTV Multicast Service Test
Triple Play Services test
Earthing, s
Quality Test
Power D.Bs Installations
In This Project Work as leading a team Engineer
PTCL, Moblink, Telenor FCB (Fast Charging Battery) Project
Configuration of Power, Environment and other NMS Alarms,
Installation of SPD and testing its alarm
Installation of Rectifiers (Emerson, Delta, Cisco and etc) and its Testing
Power D.Bs installation
Battery Testing
Earthing, s
Quality Tests
In This Project Working as leading a team of Engineers and technicians.
PTCL 260K MSAN (Multi Service Access Network) Project
Configuration,
PAT Protocol tests and Service configurations of HUAWEI’s MSAG equipment’s
Power PAT
VoIP test
IPTV Multicast Service Test
Triple Play Services test
Earthing, s
Quality Test
Power D.Bs Installations
In This Project Work as leading a team Engineer
FTTH GPON Project
Installation and Configuration of ADSL, Routers and Switches
Work on FDH.
Installation and Troubleshooting of FTTH Connection
Triple Play Services test
Quality Test
In This Project Work as leading a team of Technicians and Supervisor
ITARA CHEMICAL INDUSTRIES LTD FAISALABAD PAKISTAN (2007 TO 2009)
Sitara Chemical is the largest chemical complex in Pakistan. It makes caustic soda and numerous others by products. The complex consists of four choloro-alkali plant with a combined capacity of 610 metric tons per day
Working skills
More Than two (2) years have been involved in as asset Supervisor Electrical.
Installation, Commissioning and Maintenance of Electrical Equipments, Distribution Control Systems (DCS), 132KV Grid Station, Motors, Transformers, field Electrical of industry sector Gas, Chemical.
Worked at
1: Maintence and overhauling
2: Operation HT and LT panels
3: Control and Power Circuits (Dol, Star Delta, Reverse and Forward Circuits)
4: On load Tap Changer Transformers and Rectifiers.
5: 132kv Grid Station.
6: Erection of CPW.
7: Motors & C.B.
Bechlor of Technology (pass) (Electrical) Preston University, Kohat. 2007-2009 CGPA 2.9 78% Final Year Project: Distribution Control System (DCS) This thesis will cover complete study of existing Sitara Chemical Industry in use DCS System on BMR and other plants. 132 kv grid station.