Abdus Samad Azad, Head Construction Civil

Abdus Samad Azad

Head Construction Civil

Voltas Ltd.

Location
India
Education
Master's degree, Building Engineering
Experience
27 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :27 years, 1 Months

Head Construction Civil at Voltas Ltd.
  • India - Kolkata
  • My current job since February 2012

Project: EPC Project of Water System Facility for Steel Melting Shop at TATA Kalinganagar, Duburi, Jajpur, Odisha
Client : M/S. TATA Projects Ltd.
The above package includes Civil, structural, piping, supply of equipments, installation, commissioning for above package of SMS at converter and caster units. Major works are 25, 000cum of concreting and supply of 134nos pumps including filter press, bowl classifiers, thickeners, cooling towers etc.
Job Value : Rs. 1744 Millions.

Asst. General Manager-Projects at Shapoorji Pallonji & Co. Ltd.
  • India - Hyderabad
  • April 2011 to February 2012

Shapoorji Pallonji & Co. Ltd. (SPCL), one of India’s leading construction giants engineering, construction and project management companies is more than 140 years old, first Indian construction company to enter in the middle east and also first ISO:9001 certified Company. Shapoorji Pallonji & Co. Limited has been awarded BTG packages which are as bellow:
Project: Krishnapatnam Ultra Mega Power Project (6000MW), Krishnapatnam, Andhra Pradesh
Client : M/S. Reliance Infra Ltd.
Civil works of BTG Area for Krishnapatnam Ultra Mega Power Project, Krishnapatnam, Dist- Nellor
The above package includes Civil works for BTG Area main plant including TG structure, TG Buildings, Boiler structures, ESPs, coal bunkers, ID, FD, PA Fan Foundations, transformer foundations etc. for KUMPP, Krishnapatnam of capacity (9x660 MW).

Asst. General Manager-Civil at Abhijeet Projects Ltd.
  • India - Kolkata
  • September 2010 to March 2011

Abhijeet Group, by virtue of its entrepreneurial skills, innovative strategies and seamless execution, is emerging as one of the fastest growing and leading private sector organizations in India. The Group is a well-diversified business entity with significant presence in the core sector areas of Power, Mining, Cement, Roads, Steel and Ferroalloys. Abhijeet Group is a thorough professionally managed organization and takes immense pride in its highly committed, dedicated and dynamic workforces who are all set to chart out new avenues by converting their Dreams into Reality.
M/s. Abhijeet Projects Limited (APL) having been appointed as EPC Contractor for each 10MW Biomass based Power Plant at Durgapur, Murshidabad and Midnapur in West Bengal of M/s. Corporate Ispat Alloy Limited (CIAL), the “Owner”, at Banskopa village, Durgapur. Company also has a plan for 25MW Hydro Power plant at Darjeeling District in West Bengal.
Project: 10MW Biomass Power Project, Durgapur, West Bengal
Client : M/S. Corporate Ispat Alloy Ltd. (CIAL)
The Civil works are including Power House, Boiler Structure, ESP, ACC, Water Treatment Plant, water reservoirs, fuel handling system, chimney etc., road, drainage works, area development and boundary wall.
Job Value: Rs. 140 Millions.

Project Manager at Subhash Projects and Marketing Ltd.
  • India - Kolkata
  • November 2007 to August 2010

Subhash Projects and Marketing Limited (SPML), one of India’s leading engineering, construction and project management companies is ever expanding universe of service on Water Management, Power Generation, Infrastructure, Electrical Distribution, Environmental, Operation & Maintenance and Turnkey Solutions. Subhash Projects and Marketing Limited has been awarded three packages which are as bellow:
Project: Barh Super Thermal Power Project, Barh, Patna
Client : M/S. NTPC Ltd.
1) Offsite Area Civil works for Super Thermal Power Project of NTPC at Barh in Patna.
The above package includes Civil, Structural, Piling and Architectural works for different industrial Buildings, Heavy Drains (Twin and Trunk type), Roads, and Administrative Buildings etc. in the Construction of offsite Civil works for Barh Super Thermal Power Project (3x660 MW) of NTPC Ltd.
Job Value : Rs. 1230 Millions. ( Without Cement and Steel )
2) Water Pre-Treatment & Effluent Treatment Plant :
The above package includes Civil, Structural, Piling works for different industrial Buildings, PT-DM System, Gravity Filter, Casecade Aerators, Stilling Chamber, Filter House, Chemical House, Chlorination Building, Clarifier, Pump houses with Sumps, Central Monitoring Basin & Liquid Effluent Treatment Structures, Service Water Pump House, Coal Slury Settling Pond, PT-CW System, Tanks, substation and MCC rooms etc. for Barh Super Thermal Power Project (3x660 MW) of National Thermal Power Corporation Limited.
Job Value : Rs. 150 Millions. ( Without Cement and Steel )
3) Ash Water-Re-Circulation system (It is an EPC Contract).
Detailed design of equipment and equipment system, QAP, Design and drawing approval, supply of Material and equipments at site, associated civil, structural and Architectural works including Fabrication, Pre-assembly Erection, testing, operation of all the equipments including Commissioning, PG test and completion.
Job Value : Rs. 240 Millions.

Deputy Manager at Descon Engineering Qatar LLC
  • Qatar
  • April 2006 to October 2007

Descon Engineering Limited is a multi-dimensional engineering and construction company operating in Pakistan and the Middle East. The services portfolio covers project management, engineering, procurement, construction, maintenance, and manufacturing of process equipment for the sectors of Oil & Gas, Chemical/Petrochemical, Power, Fertilizer, Cement, and Infrastructure.
Project: Ras Laffan Olefin Project, Qatar
Consultant : Technip, France
The project comprises construction, project management and supervision of the infra structure that includes in-situ equipment foundations and pre-cast pipe racks etc for Ethylene Cracker portion of the Olefin Project.
Responsibilities: Responsible for project management and site supervision of Civil works while ensuring Time, Cost, Scope, Quality and H.S.E requirements of Civil work and Under Ground piping in Ethylene Cracker Cold Section Area ISBL SP-02, Ras Laffan Oil Company, Qatar.

Project Manager at Power Max (India) Pvt. Ltd.
  • India - Kolkata
  • September 2004 to April 2006

One of the upcoming ISO: 9001, 2000 and DNV certified companies of Power Max Group having many prestigious projects. Being a specialist in the fields of EPC division for material handling in power plant is also expert in boiler sector. As a manufacturing and fabrication group including erection, the company provides leading solutions in structural steel and aggressive business growth in its structural steel division.
140TPH Coal Handling Plant of 2x15MW Co-Generation Plant at challenging and innovative Turnkey Project under EPC
(Engineering, Procurement and Construction) contract for 140 Coal Handling Plant of 2X15 MW Co-Generation plant of project costs worth Rs.240 millions with a stipulated time schedule.
The above package includes a) Wagon Tippler with Tunnel, b) Reclaim Hopper with Tunnel, c) Primary Crusher House, d) Secondary Crusher House, e) Transfer Tower-1, 2, 3 & 4, f) Conveyer 1 to 9 Nos. (Total length- 950m) g) Substation Building including Control Room and h) Bunker House.
Supply of equipment such as wagon tippler, primary crusher, secondary crusher, magnetic separator, vibro-screen, Apron feeder, 9nos. of conveyor including all accessories (Total-950m length), MMC panel, PLC panel, Bull dozer etc.
SPECIAL ALUMINA EXPANSION PROJECT, PHASE-II At Indian Aluminium Co. Ltd’s,
The above package includes a) Dry Hydrate Building with Storage, b) Milled Hydrate and Microfined Hydrate Building (HM Building) with Storage, c) Hydrate Ball Mill Building with storage, d) Alumina Batch Ball Mill, e) Coarse Alumina (HMG) Building and f) Coarse alumina Storage Shoes. Total scope of civil work is approximately 2000m3 concrete including RCC flooring with vacuum dewatering including equipment foundation. In Structural Steel, total fabrication and erection is 1140 MT of rolled and builtup section and erection the same upto a height of 31.50m. Also fabricated 15 Nos. Tanks including erection upto a height of 18m and erection & commission of equipment.

Quality Control & Quality Assurance Engineer at National Prawn Company
  • Saudi Arabia
  • April 2002 to April 2004

Project: Shrimp Farm Project
Job Responsibility: Quality Control & Quality Assurance Engineer, Conducting lab test of all civil material, Quality inspection of Mech, Structural & Civil works, financial involvement of project including preparation of budget, planning & scheduling of sub-project by MS project, Coordinating for preparation of bill of quantities and checking of contractors bills, Coordinating with design & drawing, controlling fixed assets.

Asst. Project Manager at Emkay International Limited
  • India
  • January 2000 to March 2002

Project: Copper Smelter Project
Job Responsibility: Execution of civil, structural, mechanical, piping and instrumentation works of converter furnace, anode furnace and compressed air system as an EPC contract. Planning & monitoring, preparation of micro-schedule in Microsoft Project, preparion of MIS Reports, Quantity Surveying, Client Billing, sub-contractor's Billing, liasoning with clients, sub-contractors and consultants, co-ordinating with designs, drawings and as-built drawings, reconciliation of Free Issue Materials, prepration of Bids, inviting offers from both the vendors and contractors and evaluation. Analysis of Item Rates and Turn-Key Jobs, Quantities Take-offs, preparation of competitive statements and Work Orders. Conducting Site Surveys, Financial involvement in projects, Budgeting, scheduling and Cash Out-flow Statements. Asisiting in marketing of projects and Project Consultancy.

Assistant Engineer at Simplex Concrete Piles (India) Limited
  • India
  • July 1997 to November 1999

Project: Petroleum Refinery Project
Job Responsibility: Execution of Sea Water Cooling Tower. Layout, execution and testing of Underground Pipes of more than 21km in coker complex and sulfur recovery unit and sulfur granulation plant. Preparation of Quality Control Documents, Testing Reports, Inspection Reports as per ISO 90002 standards. Conducting QC Audit by client (Reliance Petroleum Limited - world's biggest grassroots level refinery) and external agency. Preparation of client and sub-contractor's bills. Renovation and maintenance works at Aromatic and ETP complexes.

Site In-charge at P.C. Concrete Industries (Pvt.) Ltd.
  • India
  • November 1996 to June 1997

Project: Production division of Pre-stress concrete electric pole
Job Responsibility: Responsible for Production Control and Productivity, Quality Control of pre-stress electric poles and testing as per Indian standards.

Education

Master's degree, Building Engineering
  • at Aligarh Muslim University
  • September 1996

Master of Science in Engineering (Building). Structural Analysis, Stress Analysis, Plate and Shell Analysis, Finite Element Analysis, Advanced Soil Mechanics and Machine Foundation, Stability of Structures, Construction Management and Optimisation etc.....

Bachelor's degree, Civil Engineering
  • at Aligarh Muslim University
  • May 1994

Bachelor of Science in Engineering (Civil). Engineering Drawing, Applied Physics, Applied Chemistry, Applied Mathematics, Basic Electrical Engineering, Thermodynamics, Strength of Materials, Hydrology, Geology, Hydraulics, Open Channel Flow, Survey, Irrigation Engineering, Theory of Structures, Theory of Concrete Structures, Theory of Steel Structures, Bridge Engineering, Environmental Engineering, Industrial Pollution, Programme Evolution and Reveiw Techiques, Critical Path Methode, Building Material etc......

Specialties & Skills

Aluminum
Waste Water Treatment
PowerPlant
oil gas
MS Office, MS Project, SAP-88, utilisation of Web resources.

Languages

English
Expert