Abed Al-Rahman البابا, Project Civil Engineer

Abed Al-Rahman البابا

Project Civil Engineer

Nesma trading

البلد
المملكة العربية السعودية - جدة
التعليم
بكالوريوس, Civil Engineering
الخبرات
10 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :10 years, 11 أشهر

Project Civil Engineer في Nesma trading
  • المملكة العربية السعودية - جدة
  • أشغل هذه الوظيفة منذ فبراير 2020

Worked as Project Civil Engineer at AL Jawhara Mall project (Skeleton works) and I had the following duties:
• Prepared Pr for the required materials.
• Submitted the Material technical submittals to the client.
• Checked plans, drawings and quantities for accuracy of calculations.
• Ensured that all materials selected and used and work performed are as per specifications.
• Followed with Engineering department the shop drawings to submit for approval.
• Liaised with consultant, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project.
• Managed the site daily, supervised and monitored the site labor force and the work of subcontractors.
• Oversaw quality control and health and safety matters on site.
• Followed the schedule of activities with the Site Planning Engineer.
• Made schedule for the night shift labors to cast the executed work

Project Civil Engineer في Nesma trading
  • المملكة العربية السعودية - الخبر
  • مارس 2018 إلى فبراير 2020

Worked as Project Civil Engineer at Saudi Aramco Dahran DUR project, Marafiq Al Jubail project, and Women driving school Saudi Aramco project and I had the following duties:

• Prepared Pr for the required materials.
• Submitted the Material technical submittals to the client.
• Checked plans, drawings and quantities for accuracy of calculations.
• Ensured that all materials selected and used and work performed are as per specifications.
• Followed with Engineering department the shop drawings to submit for approval.
• Liaised with consultant, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project.
• Managed the site daily, supervised and monitored the site labor force and the work of subcontractors.
• Oversaw quality control and health and safety matters on site.
• Followed the schedule of activities with the Site Planning Engineer.
• Prepared the redline for any site changes.
• Followed asbuilt drawing with Engineering Department.

Civil Site Engineer في Rasiyat Advanced Group
  • المملكة العربية السعودية
  • مايو 2017 إلى مارس 2018
Civil Site Engineer في Eastern Trading & Contracting Es
  • المملكة العربية السعودية
  • مارس 2015 إلى أبريل 2017

Worked as a Civil Site Engineer, at Salwa (Saudi-Qatar boarder), on a residential project consisting of 400 residential units with 373 million SR worth for client Ministry of Saudi Finance. I was responsible for 12 residential units each unit consists of 2 floors and having the following duties:

•Main technical advisor on the construction site for subcontractors, crafts people and operatives.
•Checked plans, drawings and quantities for accuracy of calculations.
• Ensured that all materials selected and used and work performed are as per specifications.
• Oversaw the selection and requisition of materials.
• Liaised with consultant, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project.
• Managed the site daily, supervised and monitored the site labor force and the work of subcontractors.
• Oversaw quality control and health and safety matters on site.
• Prepared reports as required.
• Handed over the executed work to the consultant (Al-Bawardi Engineering Consulting).

Civil Site Engineer في Al-Hefnah Contracting & Finishing
  • لبنان
  • أكتوبر 2014 إلى مارس 2015

Worked as a Civil Site Engineer on Shamiyah Project (Mecca-Haram Project) for finishing and and waterproofing works being the subcontractor for Saudi Bin Laden group and having the following duties:


•Main technical adviser on the construction site for subcontractors, crafts people and operatives.
•Checked plans, drawings and quantities for accuracy of calculations.
• Ensured that all materials selected and used and work performed are as per specifications.
• Oversaw the selection and requisition of materials.
• Liaised with consultant, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project.
• Managed the site daily, including supervising and monitoring the site labor force and the work of the subcontractors.
• Oversaw quality control and health and safety matters on site.
•Handed over the executed work to the consultant (Dar Al Handasah, Shair & Partners)

Civil Engineer في BMC Construction
  • يناير 2014 إلى سبتمبر 2014

construction sites for bill of quantities preparation and submitted them to contract manager and project manager.
•Measured finished works after applicators for invoices preparation and followed up with clients on a daily, weekly, monthly and quarterly basis.
•Prepared drawings necessary for waterproofing application.

Site Civil Engineer
  • يونيو 2013 إلى سبتمبر 2013
Site Civil Engineer
  • يونيو 2011 إلى أغسطس 2011

to various reinforced concrete works (casting of slabs, columns and shear wall) and finishing works (plaster, tiling, paint, aluminum, wood, steel, waterproofing…) for 10-storey building.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Beirut Arab University
  • يناير 2013

بكالوريوس, Civil Engineering
  • في Beirut Arab University
  • يناير 2013

الثانوية العامة أو ما يعادلها, Civil Engineering
  • في Life Science Baccalaureate Ikhaa National School
  • يناير 2008

Specialties & Skills

Civil Engineering
Engineering
CONSULTING
CUSTOMER RELATIONS
ENGINEERING
MATERIALS MANAGEMENT
MICROSOFT WORKS
QUALITY CONTROL
SUPERVISORY SKILLS
PAINTING
AUTOCAD

اللغات

العربية
متمرّس
الانجليزية
متمرّس