Project Civil Engineer à Nesma trading
  • Arabie Saoudite - Jeddah
  • Je travaille ici depuis février 2020

Worked as Project Civil Engineer at AL Jawhara Mall project (Skeleton works) and I had the following duties:
• Prepared Pr for the required materials.
• Submitted the Material technical submittals to the client.
• Checked plans, drawings and quantities for accuracy of calculations.
• Ensured that all materials selected and used and work performed are as per specifications.
• Followed with Engineering department the shop drawings to submit for approval.
• Liaised with consultant, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project.
• Managed the site daily, supervised and monitored the site labor force and the work of subcontractors.
• Oversaw quality control and health and safety matters on site.
• Followed the schedule of activities with the Site Planning Engineer.
• Made schedule for the night shift labors to cast the executed work

Project Civil Engineer à Nesma trading
  • Arabie Saoudite - Khobar
  • mars 2018 à février 2020

Worked as Project Civil Engineer at Saudi Aramco Dahran DUR project, Marafiq Al Jubail project, and Women driving school Saudi Aramco project and I had the following duties:

• Prepared Pr for the required materials.
• Submitted the Material technical submittals to the client.
• Checked plans, drawings and quantities for accuracy of calculations.
• Ensured that all materials selected and used and work performed are as per specifications.
• Followed with Engineering department the shop drawings to submit for approval.
• Liaised with consultant, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project.
• Managed the site daily, supervised and monitored the site labor force and the work of subcontractors.
• Oversaw quality control and health and safety matters on site.
• Followed the schedule of activities with the Site Planning Engineer.
• Prepared the redline for any site changes.
• Followed asbuilt drawing with Engineering Department.

Civil Site Engineer à Rasiyat Advanced Group
  • Arabie Saoudite
  • mai 2017 à mars 2018
Civil Site Engineer à Eastern Trading & Contracting Es
  • Arabie Saoudite
  • mars 2015 à avril 2017

Worked as a Civil Site Engineer, at Salwa (Saudi-Qatar boarder), on a residential project consisting of 400 residential units with 373 million SR worth for client Ministry of Saudi Finance. I was responsible for 12 residential units each unit consists of 2 floors and having the following duties:

•Main technical advisor on the construction site for subcontractors, crafts people and operatives.
•Checked plans, drawings and quantities for accuracy of calculations.
• Ensured that all materials selected and used and work performed are as per specifications.
• Oversaw the selection and requisition of materials.
• Liaised with consultant, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project.
• Managed the site daily, supervised and monitored the site labor force and the work of subcontractors.
• Oversaw quality control and health and safety matters on site.
• Prepared reports as required.
• Handed over the executed work to the consultant (Al-Bawardi Engineering Consulting).

Civil Site Engineer à Al-Hefnah Contracting & Finishing
  • Liban
  • octobre 2014 à mars 2015

Worked as a Civil Site Engineer on Shamiyah Project (Mecca-Haram Project) for finishing and and waterproofing works being the subcontractor for Saudi Bin Laden group and having the following duties:


•Main technical adviser on the construction site for subcontractors, crafts people and operatives.
•Checked plans, drawings and quantities for accuracy of calculations.
• Ensured that all materials selected and used and work performed are as per specifications.
• Oversaw the selection and requisition of materials.
• Liaised with consultant, subcontractors, supervisors, planners, quantity surveyors and the general workforce involved in the project.
• Managed the site daily, including supervising and monitoring the site labor force and the work of the subcontractors.
• Oversaw quality control and health and safety matters on site.
•Handed over the executed work to the consultant (Dar Al Handasah, Shair & Partners)

Civil Engineer à BMC Construction
  • janvier 2014 à septembre 2014

construction sites for bill of quantities preparation and submitted them to contract manager and project manager.
•Measured finished works after applicators for invoices preparation and followed up with clients on a daily, weekly, monthly and quarterly basis.
•Prepared drawings necessary for waterproofing application.

Site Civil Engineer
  • juin 2013 à septembre 2013
Site Civil Engineer
  • juin 2011 à août 2011

to various reinforced concrete works (casting of slabs, columns and shear wall) and finishing works (plaster, tiling, paint, aluminum, wood, steel, waterproofing…) for 10-storey building.

Éducation

Baccalauréat, Civil Engineering
  • à Beirut Arab University
  • janvier 2013

Baccalauréat, Civil Engineering
  • à Beirut Arab University
  • janvier 2013

Etudes secondaires ou équivalent, Civil Engineering
  • à Life Science Baccalaureate Ikhaa National School
  • janvier 2008

Specialties & Skills

Civil Engineering
Engineering
CONSULTING
CUSTOMER RELATIONS
ENGINEERING
MATERIALS MANAGEMENT
MICROSOFT WORKS
QUALITY CONTROL
SUPERVISORY SKILLS
PAINTING