Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Thank you. Your report has been submitted and will be reviewed shortly.
Abhishek Ray, Planning Engineer

Abhishek Ray

Planning Engineer·Al Basti & Muktha LLC

United Arab Emirates

Master's degree, Construction Technology & Management

Work experience

Total years of experience: 13 years, 0 months

Planning Engineer

February 2016 - Present

Al Basti & Muktha LLC

Dubai, United Arab Emirates

February 2016 - Present

Downtown Views Residential Development Project (Client: Emaar PJSC, Duration: 26 Months, Cost: AED 444 Million)
 Responsible for preparing and getting approval of project baseline program with cost and resource loading.
 Submitted three EOT claims for 28, 35 and 38 days with all relevant substantiation and documents.
 Responsible for all contractual correspondences with project stake holders and subcontractors.
 Conducting weekly meetings with site teams, onboard subcontractors, technical and MEP department for engineering and construction progress.
 Issuing milestone schedules to subcontractors and monitoring their substantiated schedules and progress on weekly basis.
 Tracking and controlling engineering progress through broadly substantiated and programmed logs.

Dubai Creek Residences Project (Client: Emaar PJSC, Duration: 32 Months, Cost: AED 1.16 Billion)
 Successfully monitored and completed Dubai Creek Residences project from inception to closure on time and within budget. The scope of DCR project comprises of structure, finishes, façade, MEP, Landscaping and T&C of 6 towers (2B+G+44/37/33) and two connecting podiums (2B+G+3).
 Responsible for preparing resource and cost loaded Baseline Schedule and then generated detailed Cash Flow, Progress Curves, KPI and Manpower Histogram for the project
 Responsible for all key stake holders and subcontractors’ deliverables including schedules/variations/claims.
 Prepared all project related Extension of Time (EOT) claims including an overall EOT claim and Disruption/loss of productivity related cost claim.
 Wrote analgorithm in excel whichenabled us togenerate KPI of any activity by providingstart/finish date and quantity. Hence we were able to establish KPIs of almost all intricate activities and monitored them on weekly basis thus providing animmense control over the delayed activities.
 Updated the Baseline Schedule using a self-coded interface from excel thus saving human resource and time. I had developed analgorithm which would enable us to monitor all possible Finishes and MEP activities room wise which enabled us to conclude which activity in which room is causing a delay in progress.
 Prepared the Technical (Subcontractor, Material, Shop Drawing, Method Statement) Logs for Civil and MEP and monitored them onweekly basis using a self-coded algorithm which would enable us to find out where we are lacking in engineering submissions/approvals thusenabling us to tackle it at early stage.
 Prepared Hook Time analysis report comprising of 12 tower cranes. The report enabled us to understand at a very early stage thatwe would be requiring two more additional cranes to complete the project on time.
 Our project’s Weekly Report, Monthly Report and Monthly presentation have set high standards for our company and project.

Company industry:
Civil Engineering
Job role:
Construction and Building

Senior Planning Engineer

April 2015 - January 2016

IL&FS Engineering & Construction Company Ltd.

Mumbai, India

April 2015 - January 2016

 Prepared the Baseline Schedule of the project and successfully tracked project progress through micro monitoring.
 Handling projects from inception and solely responsible for all contractual submittals
 Preparing EOT Claim and prolongation cost capturing all relevant hindrances by client/consultant in the project.
 Reporting DPR, WPR, MPR, Manpower Histogram, Delay Analysis, monthly Cash Flow, MIS reports, Profitability report, CTC and Monthly Revenue targets.
 Prepared Subcontractor’s Bill

Company industry:
Civil Engineering
Job role:
Construction and Building

Planning Engineer

July 2014 - April 2015

Capacite Infraprojects Ltd.

Mumbai, India

July 2014 - April 2015

 Prepared the Baseline Schedule of the project and successfully tracked project progress through micro monitoring.
 Handling projects from inception and solely responsible for all contractual submittals
 Preparing EOT Claim and prolongation cost capturing all relevant hindrances by client/consultant in the project.
 Reporting DPR, WPR, MPR, Profitability and Monthly Revenue targets.
 Prepared Site Logistic plan and tower crane location plan with its jumping schedule.
 Prepared Client's RA Bills and Subcontractor’s Bill with Material and Labor reconciliation report.
 Prepared Concrete and Steel Procurement plan including preparing BBS and ordering steel

Company industry:
Civil Engineering
Job role:
Engineering

Trainee Engineer

July 2013 - June 2014

NTPC Ltd.

Bengaluru, India

July 2013 - June 2014

1.) Monitoring day to day activities of power plant construction
2.) Reviewing and evaluating subcontractor's program of works
3.) Carrying out analysis for my thesis on Quality Earned Value Management
4.) Design Coordination with inter departments and subcontractors

Company industry:
Construction & Building
Job role:
Construction and Building

Education

National Institute of Technology

June 2014

June 2014

Master's degree, Construction Technology & Management

India

GPA (point): 8.47 out of 20

GPA (point): 8.47 out of 20

Thesis - “Quality Earned Value Management (QEVM)” - QEVM optimizes Time, Cost & Quality all together of a project by carrying out mathematical calculations using three variables - Planned value, Earned value & Actual Cost for quality and overall. It also provides forecast of a project performance. To support my thesis, I carried out a case study of 2400 MW super thermal power plant erection.

Sir M. Visvesvaraya Institute of Technology

August 2011

August 2011

Bachelor's degree, Civil Engineering

India

GPA (percentage): 70%

GPA (percentage): 70%

Thesis - "Rammed Earth for Load Bearing Walls" - Proposed an alternative building block made of locally available rammed earth which wouldbe very cost effective, energy efficient, environmentally friendly and can reduce the dependency on traditional bricks or otherbuilding blocks.

Skills

Project Control

Expert

Project Management

Expert

BIM

Expert

Microsoft Office

Expert

Primavera P6

Expert

Cost Control

Intermediate

Microsoft Project

Expert

Revit

Intermediate

Primavera

Expert

Microsoft Office

Expert

Project Monitoring

Expert

Project Management

Expert

Building Information Modelling

Intermediate

Project Control

Expert

Project Planning

Expert

Navisworks

Intermediate

BIM

Expert

Primavera P6

Expert

Languages

English

Native Speaker

Hindi

Expert

Bengali

Expert

Training and Certifications

Certifications
Autodesk Certified BIM Coordinator - Naviswork
Jun 2018
Autodesk Certified BIM Coordinator - MEP
Jun 2018
Autodesk Certified BIM Coordinator - Architecture
Jun 2018
Autodesk Certified BIM Coordinator - Structure
Jun 2018

Hobbies and interests

Chess

 Played and Won chess at various inter-school level

Street Play

 Represented SMVIT and won third Prize in Street Play Competition at Inter-Collegiate Fest “Verve” & “Kalanjali”  Acted in a lead role for a short movie (2013)and Launched a music album – “CAMPUS” (2011)

Cricket

 Participated in Cricket Tournaments for “Achievers Sports Club”, MUMBAI (2005)