Project Manager Resident Engineer Roads ,Building, infrastructure
CEC
Total years of experience :24 years, 10 Months
Project base on FIDIC
PMU Project.
Being a Project Manager watch and supervise the work and ensure that the standard
of workmanship employed are in accordance with the specification, contract
agreement and client circular.
Review programme monitor the progress of the work according to the project schedule
and inform SPM from time to time
Provide details for extension of time for completion of work, Contractor Variation order
and other claims, from the record prepare a note accordingly and forward it with a
detailed note.
Determining the measurement and value of work and nominated subcontractor.
Submission of drawings and details.
Meeting with Clients/Client and Defense officials regarding future planning
and Progress of work and identify all obstruction and structure which interfere
with in the right -of-way, in preparation in finding adequate solutions.
Prepare report of a problem on at site like Alligator cracks, La-hi bridge link
road and additional work forward to the engineer and client NHA for proper
information and action.
Construction of building for Passport office, Schools, Accommodation, Mosque, Military barracks, Administrative Buildings and building for recreation and entertainment. Culverts, Sewerage, Water Supply Line, RCC Drain System Secant bored pile wall, Raft footing, Combined Footing.
42 Kilometer Laying of HDPE Water Supply Line
From Al-Shamli~ Hail City and RCC Strom water Drain 750* 900/600*750
Client for all Project was Ministry of Transport Saudi Arabia. All Projects Based on FIDIC.
Tabuk- Madinah Expressway.
Tabuk-Dubha Dual Carriageway.
28 Kilo meter Ring Road Tabuk to Tabuk Airport.
MOT Building 58000 s: q: ft. Contiguous Bore pile
wall & Raft footing.
60 Beds Nishter Kidney Centre & Science Faculty Block Jalal Abad university.
Building, Storm Water Drainage System. HDPE Pipe Water Supply Line
Ring Road Kandahar 18 K:m and Shah Agha Road.
Asphalt Road Construction & RCC Drain system
Islamabad-Peshawar motorway project.136 k:m length, 6line Asphaltic road with Bridges, Culvert, Under Pass
installation of Main Gas pipelines & Domestic Metering in District Nowshera KPK.
Civil Engineering subject