Aboelfeda Ellabban, Project Director

Aboelfeda Ellabban

Project Director

SSH International

Lieu
Koweït - Hawali
Éducation
Baccalauréat, Construction Management
Expérience
45 years, 0 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :45 years, 0 Mois

Project Director à SSH International
  • Koweït
  • Je travaille ici depuis octobre 2016

Resident Engineer responsible for Managing SSH Supervision Team on the Expansion of Adan Hospital Project for the Ministry of Health (MOH).
The project is design Build with a budget of KD. 230 Mil.

Project Director à SSH International
  • Koweït - Al Ahmadi
  • janvier 2015 à octobre 2016

Responsible for Managing SSH Project Management and Supervision Team on the Marine Facilities Upgrading Project constructing two Harbors for Kuwait oil Co. (KOC).

project Director à Project Management International Systems-PMI
  • Bahreïn - Manama
  • mai 2013 à janvier 2015

Representing Kuwait Fund for Arab economic Development (KFAED) in Bahrain to Insure the proper utilization of Kuwait grant (US$ 2.5 Billion) and Bahraini Authorities compliance with KFAED regulations and procedures, all in complete transparency of the project management from master planning to projects completion.
The SOW covers the whole process starting from master planning till project completion and handing over. i.e. documents preparation, selection of Consultants, preparation of Tender Documents and selection of Contractors, close follow up of construction planning, actual progress and payments, issuance of variation order and resolution of disputes.

Operation Manager à First Kuwaiti Trading & Contracting Co.
  • Koweït - Al Koweït
  • janvier 2012 à avril 2013

. Manage designated projects; organization of projects, construction activities from mobilization to deployment of manpower, equipment, materials.
. Ensure that company's safety plan is applied on projects.
. Ensure that quality, time and cost targets are met.
. Monitor the overall construction progress of projects.
. Identify and mitigate risks associated with projects.
. Liaising with clients and consultants.
Main Projects:
1.New Cargo City - Kuwait Civil Aviation
2.Main Support & Security Center - Oil Sector Services Co.
3.New Aprons, Amiri Fleet & VVIP Parking - Kuwait Civil Aviation
4.Hawali Police Head Quarter - Ministry of Public Works

Projects Director à URRC - United Resources Real-estate Co
  • Koweït
  • septembre 2010 à décembre 2011

Job Description: In charge of the overall management of the company projects.
Main running Project was Olympia Complex which consists of:
Asian Olympic Committee H.Q. Bldg,
Two Offices Towers,
Mall
Hilton Hotel.
Those were at different stages of design, Construction and Operation. The work was carried out with fast-track design approach and utilizing multi-packaging system.

Sr. Project Manager à SSH International
  • Koweït
  • novembre 2009 à septembre 2010

Project: Marine Facilities Upgrading Project - Design Stage
Project Description: The project envisages refurbishment and expansion of the existing small boat harbor together with the associated infrastructure and facilities at south pier area. In addition to the construction of a new small boat harbor together with associated infrastructure and facilities at north pier area.
Owner: Kuwait Oil Company (KOC)
Duties:
* Management of design activities by the various trades including specialist Sub-Consultants to insure complete design and tender documents within the allocated budget and meeting all design criteria.
* Prepare and implement a quality assurance (QA) plan to assure compliance with plans and specifications in accordance with the contract.

Project Manager à Proman Project Management
  • Koweït
  • janvier 2007 à juillet 2009

Project: Capital Tower
Owner: Dar Investment Co.
Consultant: Al Jazeera Consultants

Budget: KD. 120 Million with Multiple Prime Contractors.

Project Details:
Construction of a high-rise world class headquarters building.
The project comprises Office Tower, 5 stars Hotel & Shopping Mall with Banquette Halls, SPA, Clinics, Cinemas, Food Court and Restaurants with related facilities, on plot area of 6, 393 m2.
The total built-up area is 170, 000 m2 containing the following: 3 storey underground Car park, 10 storey Podium retail/ entertainment, 13 storey Hotel Tower above podium and 70 storey Office Tower with a total height of 340 m above ground level.

Duties:
Manage the Design & Construction of mixed use development adopting a fast-track approach with Multiple-Prime Contractors.
Included proper implementation of Cost, Time, Quality Assurance, Risk, and Information Management techniques including Safety plans for delivering the project on time, within budget, and to the quality desired.

International Consultant à Project Management International Systems (PMI)
  • Koweït
  • octobre 2005 à décembre 2006

Project Management International Systems, (PMI), Joint Venture with Kuwait University - Centre of Excellence in Management (KUCEM)

Project: Consultancy Services for Kuwait Oil Company (KOC)
Owner: Kuwait Oil Company (KOC)
Project Description: Full review of the KOC Contracts with the International Project Management Contractors (PMC's)
Work Description:
• Technical and Commercial evaluation of PMC's prepared documents and performance.
• Develop a Contract Administration Manual (CAM) for better quality control of the various project deliverables, activities, contractual commitments and bids evaluation.
• Monitoring CAM implementation through conducting presentations and workshops for KOC personnel.
• Recommend improvements to PMC's contract for future implementations.

Construction Manager à Ministry of Public Works - Kuwait
  • Koweït
  • octobre 1999 à août 2005

Project: Kuwait University Building Program
Project Description: Consisted of approximately 30 packages of faculties, supporting buildings and infrastructure over three campuses, in addition to renovating some of the existing buildings.
Budget: KD 180 Million.
Duties:
•Control contract administration functions including variation order negotiations, progress payment approval, and schedules analysis.
•Manage field construction activities and coordinated the work of prime contractors, consultant and ministry staff of the various contracts running simultaneously.
•Review and analyze claims including providing detailed analysis of the acceleration, delay and disruption, and overhead claims.
•Participate in several design and construction claim resolution committees.
•Monitor consultants' procedures concerning time and adherence to contract and acceptable standards.
•Monitor performance of contractors and consultants and making proper recommendations.

Sr. Construction Eng. à Project Management & Control Co. - Kuwait
  • Koweït
  • mai 1992 à septembre 1999

Employer: Project Management & Control Co. - Kuwait
Joint venture with DMJM (USA)
Owner: Ministry of Public Works - Kuwait
Project: Kuwait University Building Program
Budget: KD 180 Million (Construction Cost)
Contractor: Several Grade “1” Prime Contractors
Project Description: The project consisted of approximately 30 packages of faculties, supporting buildings and infrastructure over three campuses, in addition to renovating some of the existing buildings.
Main Duties:
•Ensuring implementation of the site supervision manual by the respective site supervisors.
•Follow-up the progress of the work in order to assure adherence by each of the contractors to the coordination procedures established.
•Attending progress meetings for each of the projects and preparing a summary report on a bi-weekly and monthly basis.
•Analyzing the Contractor's invoices and values for variation orders in respect of the scope, reason, time and cost.

Project Manager à Kuwaiti Engineers Office
  • Koweït
  • janvier 1991 à mai 1992

Job Description:
Preparing damage assessment reports for several projects, including claims to UN and complete tender documents for reinstatement contracts complete with Specification, budget and master schedule.
The main projects were:
•Kuwait International Hotel (Previously Hilton).
•Airport Transit Hotel.
•KISR (Kuwait Institute for Scientific Research) Facilities and Infrastructure.
•Bayan Palace - structural damage assessment.
•Mishref Neighborhood Centre Project.
•Participated in the Damage assessment of the Ahmadi Port, Oil Pier.

Resident Engineer à Kuwaiti Engineers Office
  • Koweït
  • juin 1988 à août 1990

Project: Mishref Neighborhood Centre Project.
Owner: Ministry of Public Works - Kuwait
Main Contractor: Abdul Hamid Al-Issa Trad. & Cont. Co.
Budget: KD 5 Million
Project Description: Neighborhood Shopping Centre with post office, police station, community centre, library, two theatres & celebration hall.
The external elevations consisted of pre-cast concrete and large glass curtain walls.
The project was the first of its kind in Kuwait.
Duties:
To insure the proper performance by all members of the supervision team.

Project Manager à Sabwan Trading & Contracting Co
  • Koweït
  • janvier 1987 à mai 1988

Owner: Imad Bukhamsin Trad. & Cont. Co. Kuwait
Project: Laila Gallery - Salmiya
Project Description: This shopping/offices building was one of the prominent shopping centers in Kuwait.
Scope of Work: Prime Contractor for Concrete Structure
Main Duties:
Managed, planned, and controlled the various project activities and ensured a smooth flow of the construction process including:
• Managing the material supply and subcontracts administration.
• Coordinating construction activities.
• Supervising the activities of field engineers to ensure time and quality.
• Analyzing the CPM schedule and preparing bid packages for supplementary contracts.

Planning Manager à Al-Janoub Trading & Cont. Est.- Kuwait
  • Koweït
  • juillet 1985 à décembre 1986

Main Duties:
Responsible for the pricing and bidding, developing CPM schedules, material procurement, projects follow-up and software development to facilitate the various Projects requirements.

Assistant Resident Engineer à Associated Consulting Engineers Co. (ACE Int.Greece)
  • Koweït
  • janvier 1982 à août 1984

Project: Fire Fighting Network for Shuaiba Industrial Area and the Harbor.
Owner: Shuaiba Harbor Authority - Kuwait
Contractor: CAP Trad. & Cont. Co.
Budget: KD. 5 Millions.
Main Duties: Assistant Resident Engineer for civil works and in charge of Time & cost control

Design Engineer à Associated Consulting Engineers Co. (ACE Int.Greece)
  • Grèce
  • janvier 1981 à janvier 1982

Design Engineer at Head Office - Greece
Participated in the structural design of several projects.
Carried out short assignments in the roads, sanitary and contracts administration departments.

Sr. Site Engineer à Associated Consulting Engineers Co. (ACE Int.Greece)
  • Koweït
  • janvier 1980 à janvier 1981

Project: Ardiya Treatment Plant - Kuwait
Owner: Ministry of Public Works (MPW), Kuwait
Contractor: Hundai Construction Co.
Budget: KD. 3 Millions.
Project Details: Expansion of existing Ardiyah Sewage Treatment Plant
Main Duties:
Supervising the construction of water retaining structures, lifting & pumping stations and roads

Site Engineer à Associated Consulting Engineers Co. (ACE Int.Greece)
  • Koweït
  • novembre 1977 à janvier 1980

Joint Venture; ACE International with Cood & Partners (UK)
Project: Shuaiba Harbor - Kuwait
Owner: Shuaiba Harbor Authority - Kuwait
Contractor: Hundai Construction Co.
Budget: KD. 37 Millions
Project Detail: Construction of approx. 1600 m. quay walls, administration buildings, containers storage yard, supporting buildings, infrastructure and roads.
Duties:
Over the life span of the project, duties and assignments covered all project activities of Quay walls construction, road construction, buildings, piling, dredging and reclamation.

Éducation

Baccalauréat, Construction Management
  • à Northeastern University
  • juin 1985

Advanced courses in Construction Management, Northeastern Univ., Boston. Courses included: * Construction Management * Engineering & Construction Law * Structural Design * Accounting * Information Technology Applications

Diplôme supérieur, Structural Engineering
  • à Manchester University
  • juin 1977

Post Graduate Diploma (Structural Engineering) Manchester University, UK

Baccalauréat, Civil Engineering
  • à Aleppo University
  • juin 1975

B.Sc. in Civil Engineering, Aleppo University, Syria.

Specialties & Skills

Construction Supervision
Construction Disputes
Project Control
Planning
Construction Management
CONCRETE
CONTRACTS
SOFTWARE DEVELOPMENT
PRICING
PROJECT MANAGER

Langues

Anglais
Expert
Arabe
Expert

Adhésions

Kuwait Society of Engineers
  • --
  • August 1985
Professional Engineers Society of Ontario, Canada
  • --
  • January 2000

Formation et Diplômes

Civil Law for Engineers (Formation)
Institut de formation:
Kuwaiti Engineering Society
Date de la formation:
January 1989
Durée:
40 heures
AutoCAD (Formation)
Institut de formation:
Kuwaiti Engineering Society
Date de la formation:
January 1987
Durée:
64 heures
Concrete Mix Design & QC (Formation)
Institut de formation:
Kuwait Institute for Sientific Reasearch (KISR)
Date de la formation:
January 1983
Durée:
40 heures

Loisirs

  • Travelling, Reading & Walking