SITE ENGINEER
MWNRYR LLTJARH WALMQAWLAT
مجموع سنوات الخبرة :6 years, 0 أشهر
JOB RESPONSIBILITIES
Day to Day supervise ongoing construction work. Observe all the ongoing site activities. Report to the senior Engineers of the Project. Observe the different Activities and tests perform on the materials.
Project: Peshawar Bus Rapid Transit Corridor (PBRTC) Client: Peshawar Development Authority (PDA) Contractor: TTC_TBL Contracting Company
JOB RESPONSIBILITIES
Day to Day supervise ongoing construction work. Control of wastage and quality of workmanship. Coordination between different Sub contractors and agencies. Work out the requirements of different materials for construction. Assist the senior engineer in checking and certifying the contractors bill. Prepare and submit daily progress report, monthly progress reports, and consumption reports with coordination with the stores and site team. Supervise all the activities related to the construction of the project. To report progress and other updates back to senior site engineer. Prepared daily, weekly, monthly, and quarterly project progress reports.
Checked the quality of construction material and insured the approved materials usage.
Position: Trainee ENGINEER Project: Ajmal Mall & Residency Industrial Estate Hayatabad Peshawar Contractor: Mian Consultant Duration: November 2022 to May 2023
JOB RESPONSIBILITIES
Engineering, material, equipments and construction by proper control of quality management system. Supervise all the activities related to construction of the project. Monitor Site quality and workmanship of every activity in engineering construction relating to Civil, Architectural and Structural. To ensure that all the technical activities in the site are in compliance with the Approved Project Specification, Approved Project Drawings. .
Project: Residential houses in DHA Peshawar. Contractor: Mian Consultant
JOB RESPONSIBILITIES
Assisted with preparation of client presentations using AutoCAD and Micro soft Office.
Conducted root-cause analysis of component failure.
Created 3D models from 2D drawings.
Conducted root-cause analysis of component failure.
Created 3d models using Sketch up pro.
Created plans and layouts by using autocad.
project: Experimental investigation on geo polymer concrete blocks