أبو بكر فاروق, Project Execution Manager

أبو بكر فاروق

Project Execution Manager

U.ZIA Building Contractors

البلد
باكستان
التعليم
بكالوريوس, Electronic And Electrical Engineering
الخبرات
10 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :10 years, 6 أشهر

Project Execution Manager في U.ZIA Building Contractors
  • باكستان - لاهور
  • أشغل هذه الوظيفة منذ ديسمبر 2017

 Supervise and execute Civil, Mechanical and Electrical work of different projects.
 Electrical designing of Commercial and Residential buildings.
 Preparation of BOQ’s of electrical projects.
 Cost Analysis of different projects.
 Inspection of Electrical work according to project specifications.
 Proper management of materials and workmanship.
 Ensure all the work meet the stipulated quality standards.
 Coordinate with subcontractors for smooth flow of work.
 Negotiating with suppliers and purchasing items at optimum cost.
 Preparation of electrical procedures for installation and commissioning.
 Manage different construction sites and deliver to clients within the given time.

Electrical Engineer في Roshan Packages Pvt Ltd
  • باكستان - لاهور
  • مارس 2014 إلى نوفمبر 2017

 To supervise and ensure the trouble free running of all machinery and smooth operation of electrical substation.
 To plan, organize and monitor the preventive and corrective maintenance of all plant.
 Oversee all repairs and troubleshooting of equipment failures as well as root cause analysis of failures.
 To manage the electrical preventive maintenance team in different shifts to improve the plant performance.
 Coordinated with production department on different project progress.
 Analyzed and recommended improvements to operational process to increase the performance of the plant.
 Pay attention to safety precaution provided by the manufacturers and organization.
 Conducting Safety audits within the department and ensuring the compliance from all the employees and updating the checklists and audit reports.
 Reducing down time on all machinery (Operational and Maintenance).
 Working on power factor to reduce the reactive power and decrease the electricity bill by 40%.
 Determining, calculating and analyzing various maintenance cost.
 Optimized machinery to increase efficiency and output.
 Strong Ability to read Electrical drawings.
 Maintain inventory at optimum level.

Internee في PTV(Pakistan Television)
  • باكستان - إسلام أباد
  • أغسطس 2012 إلى سبتمبر 2012

To gain the Knowledge; of basic engineering principles and techniques; of engineering planning; of equipment used in master control room

Internee في Orient Group of Companies
  • باكستان - لاهور
  • يونيو 2011 إلى يوليو 2011

1) To understand the assembling and testing process of indoor and outdoor unit of Air Conditioner.
2) To understand the manufacturing process of condenser of Air Conditioner.

الخلفية التعليمية

بكالوريوس, Electronic And Electrical Engineering
  • في Air University
  • أغسطس 2013

I did Electrical Engineering from Air University Islamabad.

الثانوية العامة أو ما يعادلها, Fs.c Pre Engineering
  • في Unique College of Computer Science
  • مارس 2008

I did FS.c Pre Engineering from Unique College of Computer Science.

Specialties & Skills

Leadership
Project Management
Maintenance Planning
Project Execution
Team Building
Microsoft Excel
Microsoft Powerpoint
Microsoft Office
AutoCAD
Teamwork
Communication

اللغات

الأوردو
متمرّس
الانجليزية
متمرّس

العضويات

Adventure Club at Air University Islamabad
  • Member
  • January 2013

التدريب و الشهادات

EMBA 170 (تدريب)
معهد التدريب:
Roshan Packages Pvt Ltd
المدة:
48 ساعة
BHS (Corrugation Machine) (تدريب)
معهد التدريب:
Roshan Packages Pvt Ltd
المدة:
72 ساعة
AutoCAD (الشهادة)
Appreciation Certificate (3000 Ton Production) (الشهادة)

الهوايات

  • Cricket