Abubakar Farooq, Project Execution Manager

Abubakar Farooq

Project Execution Manager

U.ZIA Building Contractors

Lieu
Pakistan
Éducation
Baccalauréat, Electronic And Electrical Engineering
Expérience
10 years, 6 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :10 years, 6 Mois

Project Execution Manager à U.ZIA Building Contractors
  • Pakistan - Lahore
  • Je travaille ici depuis décembre 2017

 Supervise and execute Civil, Mechanical and Electrical work of different projects.
 Electrical designing of Commercial and Residential buildings.
 Preparation of BOQ’s of electrical projects.
 Cost Analysis of different projects.
 Inspection of Electrical work according to project specifications.
 Proper management of materials and workmanship.
 Ensure all the work meet the stipulated quality standards.
 Coordinate with subcontractors for smooth flow of work.
 Negotiating with suppliers and purchasing items at optimum cost.
 Preparation of electrical procedures for installation and commissioning.
 Manage different construction sites and deliver to clients within the given time.

Electrical Engineer à Roshan Packages Pvt Ltd
  • Pakistan - Lahore
  • mars 2014 à novembre 2017

 To supervise and ensure the trouble free running of all machinery and smooth operation of electrical substation.
 To plan, organize and monitor the preventive and corrective maintenance of all plant.
 Oversee all repairs and troubleshooting of equipment failures as well as root cause analysis of failures.
 To manage the electrical preventive maintenance team in different shifts to improve the plant performance.
 Coordinated with production department on different project progress.
 Analyzed and recommended improvements to operational process to increase the performance of the plant.
 Pay attention to safety precaution provided by the manufacturers and organization.
 Conducting Safety audits within the department and ensuring the compliance from all the employees and updating the checklists and audit reports.
 Reducing down time on all machinery (Operational and Maintenance).
 Working on power factor to reduce the reactive power and decrease the electricity bill by 40%.
 Determining, calculating and analyzing various maintenance cost.
 Optimized machinery to increase efficiency and output.
 Strong Ability to read Electrical drawings.
 Maintain inventory at optimum level.

Internee à PTV(Pakistan Television)
  • Pakistan - Islamabad
  • août 2012 à septembre 2012

To gain the Knowledge; of basic engineering principles and techniques; of engineering planning; of equipment used in master control room

Internee à Orient Group of Companies
  • Pakistan - Lahore
  • juin 2011 à juillet 2011

1) To understand the assembling and testing process of indoor and outdoor unit of Air Conditioner.
2) To understand the manufacturing process of condenser of Air Conditioner.

Éducation

Baccalauréat, Electronic And Electrical Engineering
  • à Air University
  • août 2013

I did Electrical Engineering from Air University Islamabad.

Etudes secondaires ou équivalent, Fs.c Pre Engineering
  • à Unique College of Computer Science
  • mars 2008

I did FS.c Pre Engineering from Unique College of Computer Science.

Specialties & Skills

Leadership
Project Management
Maintenance Planning
Project Execution
Team Building
Microsoft Excel
Microsoft Powerpoint
Microsoft Office
AutoCAD
Teamwork
Communication

Langues

Urdu
Expert
Anglais
Expert

Adhésions

Adventure Club at Air University Islamabad
  • Member
  • January 2013

Formation et Diplômes

EMBA 170 (Formation)
Institut de formation:
Roshan Packages Pvt Ltd
Durée:
48 heures
BHS (Corrugation Machine) (Formation)
Institut de formation:
Roshan Packages Pvt Ltd
Durée:
72 heures
AutoCAD (Certificat)
Appreciation Certificate (3000 Ton Production) (Certificat)

Loisirs

  • Cricket