petrroleum engineer
sudanese petroleum corporation
Total years of experience :14 years, 2 Months
Attempts to maximize production (or injection) in a cost-effective manner.
Plans, designs, controls, analysis and forecasting.
Administer the interface between the reservoir and the well and choosing the appropriate methods.
October 2012 - Until now Production Engineer (Petroleum) at Sudanese
Petroleum Corporation.
Working as production Engineer in Sudanese Oil
Corporation to follow:
• Working in office to monitor the field
performance and flow well optimization (Well
productivity, artificial lift, Production problems)
• Working in client companies for auditing all
invoices Related to production engineering
(pumps Purchase equipments, chemical use for completion and processing)
• Well production improvements
• The conceptual design of development wells.
• New technology development and
implementation.
Vocational Courses:
• Drilling Fluids & Problems
• Analysis of Well Test
• Oil and Gas Production Technique
• Oil Wells Completion
• 3D Seismic Survey
• Quality Management System
• Production Optimization Using Nodal Analysis
• Laboratory Analysis for Oil and Gas
• Health, Safety and Environment in The Oil Industry
4
Curriculum Vitae
• Computer Basic
• General English - "Upper Intermediate"
• Exploration and Evaluation of Oil Fields
• Fundamentals of Oil and Gas Industry
• Management and Organization
• Directional Drilling
• Petroleum Contracts
• PCP training course PCM
• ESP training course WSP
March 2010 - Up to now Production Engineer (Petroleum) at Sudanese
Petroleum Corporation (Ministry of Oil)
March 2010 - March 2012 I worked in the field in many parts for getting more
Knowledge
2
Curriculum Vitae
• Drilling Rigs (Drilling Operation, Mud Engineer, mud
logging, Wire line, Fishing, etc)
• Production Operation Department (Operation in
Production Facilities CPF and FPF, To Familiar with processing equipment, Gas injection, Huff and Puff,
CSS, Artificial Lift (Gas Lift, ESP, PCP, BPU)
• Services Rig
• Well Testing
• Well Completion (Type of completion,
Completion program generation for wells, Dual
ESP completion)
• Work over (Pump repair, Well optimization,
Water Shut-off)
April 2012 - September 2012 On Job Trainee at GNPOC Operating company
I worked in the field in many parts to be qualified as
Production engineer
• Monitoring the wells in a field
• Preparing Programs for completion and Work over of the wells
• Diagnosing any problems in wells and find solutions
• preparing pumps and its equipments ( Warehouse in the field)
• GAS LIFT (Workshop operation)
• Workshop tool and equipment
• Workshop test (Preparing Valves)
3
Curriculum Vitae
• Installing the valve inside side pocket mandrel
• Valve extraction