مدير مشروع بناء مدني
the affix
مجموع سنوات الخبرة :15 years, 11 أشهر
مدير مشروع مول تجاري بالتجمع الخامس بتكلفه ٤٠٠ مليوم po٠٠٠
construction and project manager for the maintenance of the
facades of Elaf Taiba Hotel No. 118 in the northern region Owner
and developer Emaar Arabia and Consultant Office Dr. Ahmed
the office of Dr.
Buildings Project Finishing Hotel Building in Central
Western Region Plot No. 2112 King of Makram Ali Al-
Sherbini and
I have worked in the field of architectural design and
have done the following works.
1- Design of 26 residential villas adjacent to the duplex
system, King Abdul Aziz Al Basri
2 - design of the number of 10 residential adjacent to
at the office of
Omar Qassem Al-Issaie for contracting and
engineering project to establish the
at Al-Bandari
Contracting Company for finishing works in the
Sanabel City Hotel project and in the northern central
region of the Prophet's Mosque. The project is a
commercial residential project consisting of three
basement parking spaces and the ground floor
contains an entrance The hotel, restaurant and Dora
Mezzanine contain the main restaurant and
management in addition to fourteen four-room hotel
rooms and four-star project on the central system VRV
and fire alarm systems and surveillance systems.
I have a
poet company for traders of, industry and construction
as an architect to carry out a review of design
drawings and the workshop drawings for all business
and architectural details as well as carrying out
implementation of all architectural items and the work
of the monthly extracts and follow-up program project
time and cost control so as to project His Excellency
Ali bin Hassan poet in the Western region project
Custodian of the two Holy Mosques, to develop the
Haram al-Sharif and the project Residential
Commercial is a number 2 basement services and the
role of land and commercial mezzanine and ten floors
is residential apartments Atk N the role of the number
three apartments Bmstah total of 500 m 2 and the
project contains the central adjustment system and
warning systems and self-extinguishing fire
for Al-Alama Trading and
an architect for the
projects of Sheikh Abdul Rahman Al-Namla based on piece 152
and on the two pieces 169-170 in the northern region of the
Custodian of the Two Holy Mosques to develop the area of the
Prophet's Mosque Al Sharif and the project Residential
Commercial is located on the surface of 1400 m 2 and consists of
the number of five basement and ground and commercial balance
and the role of the restaurant and management and the number
of thirteen Dora Hotel rooms and apartments and we have
coordinated between the various work and follow-up
implementation and work plans for the workshop needed for the
in the office of the
architecture of the branch of Bakiriya in Qassim - Saudi Arabia as
an architect designed for a group of residential villas and palaces
and commercial markets and buildings and palaces and weddings
as well as consultant for several projects.
with Fine Touch Design
and Implementation Office in Egypt -
implementation of the
Golden Eygpt tourist village in Hurghada, Egypt The owner of
the company Kimidar Tourism for the implementation and
supervision of the subcontractors and the work of the
architectural details necessary for implementation as well as
the necessary architectural modifications and the project is : -
2 - horizontal hotel 5 stars four floors with a capacity of 310
rooms and 8 suites in addition to the lobby, restaurant and
cafeteria
3 - the number of 16 chalets building temporary rental system
4- In addition to the elements of landscaping, swimming pool
and other services.
the Egyptian armed forces with
military works to supervise the implementation of a group of
residential buildings and a project of cooling water connection
with a length of 3 km
in designing
and implementing decoration works in Cairo
of the technical office and general coordinator of the city's
projects. Later on I was added to the project of managing the
Arabic language projects. During that period I redesigned the
conference hall as the company's contracting company and
worked on the design and implementation plans. Arabic language
and follow up the work of the executive plans and planning and
coordination of the work of finishing the residential buildings at the
university and overseeing contracts with subcontractors and
coordination with the university administration and consultant for
the company's projects worth about 400 million riyals as they
have fled The tender for the Faculty of Science at the University
was awarded by the company for 165 million riyals
The
investment property of the honorable Ashraf Aslan
3 - Modification work of the design of the tower project