الخبرة العملية

مجموع سنوات الخبرة :3 years, 9 أشهر

Site Engineer في OTV International
  • الكويت - الزور ميناء سعود
  • أكتوبر 2011 إلى أكتوبر 2014

(As Site Engineer: O&M / Warranty Period)

- October 2013 - October 2014

 Take active role in resolving issues relating to Mechanical, Electrical or Civil defects by optimizing

action plan in order to minimize impact on commercial production.

 Coordinate with Commissioning / Operation & Maintenance teams and identify root cause of issues

relating to Pumps, Valves, Compressors, Filter Vessels and Piping.

 Propose rectification solution to Project Manager

 Organize and Supervise Site Maintenance/Warranty Support team and effectively carry out

rectification works On-site

 Coordinate with Vendor in case of defective equipment and ensure that satisfactory action is taken in

order to replace defective equipment or resolve the issue.

(As Piping Engineer)

- April 2011 - October 2013

 Overlooking Installation of AG & UG Pipelines and carrying out Quality Inspections with QC

Engineers and Vendor Assistance Supervisors.

 Maintaining records of installation work on a daily basis and keeping track of progress.

 Resolving issues related to Pipe Installation in coordination with design team

 Estimation and monitoring of material requirement and shortages by maintaining precise records of

BOQ for the Project. (SS 316L; SDX Stainless steel; GRP Piping components & Chemicals; HDPE;

PVDF; PVC-U; Double containment Piping)

 Compilation and tracking of Purchase requests and Deliveries for various Piping materials.

 Conducting QC checks on Pipe spools at Vendor’s Production Facility.

 Conducting training sessions for workers in order to equip them with required knowledge and skill relating to Piping works On-Site.

(As Pilot Plant Operator)

- October 2011 - April 2011

 Responsible for safe running and operation of Pilot plant for a period of 6 months, adhering to Pilot plant protocol for Start-up, Shutdown and regular operations.

 Calibrating Instruments for conducting tests on various parameters denoting quality of raw and
product water

 Maintaining detailed records of all important parameters associated with daily operation of Pilot Plant.

Piping Engineer في Bronzia Projects Company
  • الكويت - الكويت
  • فبراير 2011 إلى أكتوبر 2011

Estimation and Pre-determination of material requirement and shortage for installation of

underground ductile iron pipeline and fire-fighting systems.

 Handling a team of foremen, fitters and helpers

 Planning of installation activities and scheduling work in order to match other site activities and

Project Schedule.

 Maintaining records of installation work on a daily basis and keeping track of progress.

 Ensuring strict adherence to quality control standards and procedures

 Drafting As-Built Drawings in accordance with variation on Site

 Overseeing Hydrotests

 Preparation of Hydrotest Packs

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في The National Institute of Engineering, Mysore
  • يونيو 2009

Certified with First Class Honors

Specialties & Skills

Pilot Plant Operation
MS Excel
Equipment Troubleshooting
Piping Management

اللغات

الانجليزية
متمرّس
الاسبانية
مبتدئ
العربية
مبتدئ
الفرنسية
مبتدئ
الهندية
متمرّس