Total Years of Experience: 12 Years, 3 Months
August 2015
To Present
Project Engineer
at SALMAN GROUP
Location :
Saudi Arabia - Dammam
Project: Retal Square (Residential Buildings)
Job Title: Project Engineer and Site Coordinator
Responsibilities
• Collaborate between site and office to support assigned projects ensuring an efficient handing over.
• Follow up on the shop-drawings presented by the subcontractor prior execution on site.
• Manage different suppliers and subcontractors to minimize the clashes and overlapping between different trades.
• Maintain Quality and Safety on all assigned projects.
• Follow up on the cost to completion and forecast to deliver the project within the limit of budget and time.
• Solving problems and providing technical advice.
• Prepare weekly and monthly progress report for the management to keep track of the projects.
• Procurement and material selection according to specification and within the budget limitations.
• Plan and schedule project timelines.
• Calculate all quantities needed for the project.
• Make invoices.
Job Title: Project Engineer and Site Coordinator
Responsibilities
• Collaborate between site and office to support assigned projects ensuring an efficient handing over.
• Follow up on the shop-drawings presented by the subcontractor prior execution on site.
• Manage different suppliers and subcontractors to minimize the clashes and overlapping between different trades.
• Maintain Quality and Safety on all assigned projects.
• Follow up on the cost to completion and forecast to deliver the project within the limit of budget and time.
• Solving problems and providing technical advice.
• Prepare weekly and monthly progress report for the management to keep track of the projects.
• Procurement and material selection according to specification and within the budget limitations.
• Plan and schedule project timelines.
• Calculate all quantities needed for the project.
• Make invoices.
March 2015
To July 2015
Project Civil Engineer
at Dar Al Omran
Location :
Jordan - Zarqa
Infrastructure and Roads
November 2013
To February 2015
Site Engineer
at Omar Abu Sa’ad & Sons Contracting Company (OASC)
Location :
Jordan - Zarqa
Project: AS SAMRA Wastewater Treatment Plant Expansion BOT Project
Job Title: Site Engineer
Project Description:
The project of As Samra Waste Water Treatment Plant Expansion BOT Project, Consist of water tanks, Sludge tanks, Residential buildings, Dewatering buildings, Thickeners tanks and Digesters tanks, Electrical trenches, GRP/HDPE pipes installation and precast Manholes.
Main contractor: (MORGANTI group Inc), (Consolidated Contractors Company)
Project cost: 300 million $.
Designer and consultant: FICHTNER Water & Transportation and Suez Environment.
Responsibility & duties:
• Check formwork and steel reinforcement works before handing over to the consultant.
• Supervise of concrete casting operation to control quality for concrete.
• Ensure that all site activities are conducted under controlled conditions as per shop drawings, schedule, method statements and specification.
• Coordinate between subcontractors.
• Ensure that materials are available before time in order to avoid any interruption of the works.
• Prepare bar binding schedules (BBS).
• Prepare weekly and monthly reports.
• Quality Control and productivity of works.
Job Title: Site Engineer
Project Description:
The project of As Samra Waste Water Treatment Plant Expansion BOT Project, Consist of water tanks, Sludge tanks, Residential buildings, Dewatering buildings, Thickeners tanks and Digesters tanks, Electrical trenches, GRP/HDPE pipes installation and precast Manholes.
Main contractor: (MORGANTI group Inc), (Consolidated Contractors Company)
Project cost: 300 million $.
Designer and consultant: FICHTNER Water & Transportation and Suez Environment.
Responsibility & duties:
• Check formwork and steel reinforcement works before handing over to the consultant.
• Supervise of concrete casting operation to control quality for concrete.
• Ensure that all site activities are conducted under controlled conditions as per shop drawings, schedule, method statements and specification.
• Coordinate between subcontractors.
• Ensure that materials are available before time in order to avoid any interruption of the works.
• Prepare bar binding schedules (BBS).
• Prepare weekly and monthly reports.
• Quality Control and productivity of works.
December 2011
To October 2013
Site Engineer
at Setec and engicon
Location :
Jordan - Amman
Project: Water Supply of Greater Amman III & IIII
• Installation DIP Pipe & HDPE Pipe with Diameter 63 mm & 125 mm & 180 mm and House Connections, Pressure Test, Disinfection, Connection & Disconnection.
• Used Trenchless Technology
• GRP Ductile Steel Pipes.
• Installation DIP Pipe & HDPE Pipe with Diameter 63 mm & 125 mm & 180 mm and House Connections, Pressure Test, Disinfection, Connection & Disconnection.
• Used Trenchless Technology
• GRP Ductile Steel Pipes.
October 2012
To August 2013
Consultant
at Water Supply Of Greater Amman IIII
Location :
Jordan - Amman
To obtain a full-time working position in the field of construction building or infrastructure in a well-reputed company. As well as applying my scientific background and to obtain more engineering experience in the field of my specialty .
December 2011
To September 2012
Site Engineer
at Setec & Engicon
Location :
Jordan - Amman
1-) Worked at Setec & Engicon (Consultant) Water Supply Of Greater Amman III from 03/12/2011 Up to 30/09/2012, Project value is 10, 000, 000 euro
• Installation DIP Pipe & HDPE Pipe with Diameter 63 mm & 125 mm & 180 mm and House Connections, Pressure Test, Disinfection, Connection & Disconnection.
2-) Worked at Setec & Engicon (Consultant) Water Supply Of Greater Amman IIII from 01/10/2012 Up to now, Project value is 17, 000, 000 euro
• Installation DIP Pipe & HDPE Pipe with Diameter 63 mm & 125 mm & 180 mm and House Connections, Pressure Test, Disinfection, Connection & Disconnection.
• Used Trenchless Technology
• Installation DIP Pipe & HDPE Pipe with Diameter 63 mm & 125 mm & 180 mm and House Connections, Pressure Test, Disinfection, Connection & Disconnection.
2-) Worked at Setec & Engicon (Consultant) Water Supply Of Greater Amman IIII from 01/10/2012 Up to now, Project value is 17, 000, 000 euro
• Installation DIP Pipe & HDPE Pipe with Diameter 63 mm & 125 mm & 180 mm and House Connections, Pressure Test, Disinfection, Connection & Disconnection.
• Used Trenchless Technology
Share on Facebook
Share on Twitter
Share Via Email