عدنان اظهر, Lead Electrical Engineer

عدنان اظهر

Lead Electrical Engineer

TIEJUN COMPANY

البلد
المملكة العربية السعودية - الوجه
التعليم
بكالوريوس, Electrical Power
الخبرات
9 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :9 years, 4 أشهر

Lead Electrical Engineer في TIEJUN COMPANY
  • المملكة العربية السعودية - املج
  • أشغل هذه الوظيفة منذ نوفمبر 2021

• Led construction management of provided resources optimally for 400MWp (122 SF1. 266 SF2, 6 SD, 6 DR & 6 at Shey Barah Ireland) solar installations.
• Grounding, switchgear, cable pulling, & distribution panel installation are second nature.
• Skilled in DC/LV & MV cable pulling
• PV modules installation
• Solar Inverters installation termination and testing
• Proficient in resource optimization, & team leadership for successful project execution.
• Utilize MS Office Suite, AutoCAD, SolMetric, and Aconex for optimal workflow & communication.
• Microgrid Solar Power plant installation at sheybarah Island 10-1, SD and DRO (18MWp Total)
• Installation of biofuel ICE systems about 100MW
• Grid Rings Connected Construction of 2 Solar Forms SF1 (122MWp) & SF2 (266MWp)
• Involved in the Construction of 110KV substations and other related auxiliary works.
• Coordinate the construction, Site Engineers and subcontractors for safe and efficient delivery of electrical scope.
• Installation of BESS Battery Energy storage systems of about 1200 MWh (386 at SF1, 388 at SF2 and 386 at COV)
• Ensured safety goals are achieved on the project and oversee implementation of safety procedures
• Installation of all BESS compulsory equipment such as PCS (Power Converter system), Battery Container, Smart transformer station (STS), UPS and Auxiliary Transformers
• Review the work progress daily for all electrical activities on site and ensured that the project timeline is being followed.
• Review the project in-depth to schedule deliverables and coordinate with the client to expedite the approval of submitted construction activities like, Method statements, Material Approval Requests (MAR) and technical permits.
• Ensure Compliance with quality construction standards, specifications, and the use of proper installation techniques.
• Ensuring on-site safety compliance, cleanliness, and orderliness in all activities ongoing.
• Raised RFIs to clear any ambiguity in the drawings.
• Prepare and submit weekly Progress reports to client and Companys management.
• Preparation of TOPs
• Working for the clearance of snags (Punch) Lists as per comments from the owner

Site Engineer في GAMA Power at PP13 Project Riyadh
  • المملكة العربية السعودية - الرياض
  • مايو 2016 إلى أكتوبر 2018

• Installed extensive grounding mesh systems, ensuring safety and equipment protection in high-voltage environments.
• Executed cable pulling, panel installation, and cable termination, enabling reliable power delivery within demanding 5x660MW steam turbine facilities.
• Led the installation of high-capacity transformers, contributing to efficient power conversion and system stability.
• Implemented comprehensive lighting and lightning arrestor systems, enhancing operational safety and minimizing downtime.
• Utilized and maintained overhead cranes for safe and efficient handling of heavy electrical equipment.
• Skilled in power systems analysis, grounding, switchgear, distribution panels, and Site testing.
• Leveraged MS Office Suite and AutoCAD for project documentation, planning, and design.
• Possess additional knowledge of FinFan coolers, air compressors, and strong communication & teamwork skills.

Construction Manager في Royal Brucke Energy
  • باكستان - Bahawalpur
  • فبراير 2014 إلى مارس 2016

• Empowering sustainable growth by delivering proven renewable energy solutions from 5kW residential setups to 300kW commercial projects
• Managed the implementation of 300kWp systems at DHA Bahawalpur and 760kW at Multan Garrison, demonstrating expertise in large-scale solar installations.
• Increased energy security for clients, achieving significant cost savings through optimized on-grid systems.
• Designed efficient solar systems using industry-standard software, ensuring optimal energy production.
• Performed site surveys, procured materials, conducted technical reviews, and handled grounding, erection, and commissioning tasks.
• Ensured transparent project execution with comprehensive documentation for each stage.
• Seamlessly connected systems to the grid for immediate energy utilization and cost reduction.
• Optimized material usage and ensured long-term system integrity through accurate cable sizing and proper material handling.
• Implemented robust structures and expertly handled solar module installation for maximum energy capture.
• Maintained organized and safe electrical connections for reliable system operation.

Electrical Engineer في Fatima Engineering company
  • باكستان - لاهور
  • يناير 2012 إلى ديسمبر 2013

• Oversaw the assembly, installation, and start-up of all 25 MW Power plant equipment, ensuring timely and successful completion within project constraints.
• Managed the logistical planning, unloading, storage, and commissioning of relocated engines (4 Wartsila Engines (6.125MW each), maximizing efficiency and minimizing downtime.
• Led the installation and commissioning of a Waste Heat Recovery System, contributing to significant energy savings and improved plant performance.
• Successfully installed and commissioned 8 (Fincoil®) radiators, enhancing cooling capacity and system reliability.
• Utilized Microsoft Project to plan and track daily activities, ensuring adherence to execution plans and achieving project milestones on schedule.
• Conducted thorough inspections of all electrical and mechanical components, guaranteeing conformity with OEM manuals and Wartsila standards.
• Generated daily reports for clients, kept them informed through daily meetings, and adapted plans to meet evolving site requirements.
• Managed the design and construction of a new Dyeing and finishing Unit, meeting client deadlines and budget requirements.
• Optimized team performance through effective planning and allocation of tasks, ensuring project targets were met efficiently.

Trainee Electrical Engineer في Sapphire Textile Mills
  • باكستان - فيصل أباد
  • أغسطس 2011 إلى ديسمبر 2011

3), optimizing performance and ensuring reliable power generation.
• Oversaw the operation of Nigata engines (5.9MVA X 4) and various alternator models (Caterpillar 3512, AVK, TOYONAKI, Stamford), demonstrating proficiency with diverse equipment.

الخلفية التعليمية

بكالوريوس, Electrical Power
  • في The Islamia University Of Bahawalpur
  • أغسطس 2024
ماجستير, Electrical Power and Control
  • في North China Electric Power University
  • يونيو 2024

Electrical Power and system automation

الثانوية العامة أو ما يعادلها, MS Electrical Power Engineering
  • في North China Electric Power University
  • يناير 2021
بكالوريوس, BS Electrical Power Engineering
  • في The Islamia University of Bahawalpur
  • يوليو 2011

Specialties & Skills

Documentation
Management
Electrical Engineer
Renewable Energy
AUTOCAD
COMMUNICATIONS
TRANSFORMERS (ELECTRICAL)
INSTALLATION
OFFICE SUITE
SWITCHGEAR
CABLE SIZING
CONSTRUCTION
CUSTOMER RELATIONS
ENGINEERING
PRESENTATION SKILLS
TECHNICAL SUPPORT
Solar / PV
BESS (Battery Energy Storage system)
Team Leading
Documentation and work flow
PlanSwift

حسابات مواقع التواصل الاجتماعي

الموقع الشخصي
الموقع الشخصي

لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.

اللغات

الانجليزية
متمرّس
الأوردو
متمرّس