Lead Electrical Engineer
TIEJUN COMPANY
مجموع سنوات الخبرة :9 years, 4 أشهر
• Led construction management of provided resources optimally for 400MWp (122 SF1. 266 SF2, 6 SD, 6 DR & 6 at Shey Barah Ireland) solar installations.
• Grounding, switchgear, cable pulling, & distribution panel installation are second nature.
• Skilled in DC/LV & MV cable pulling
• PV modules installation
• Solar Inverters installation termination and testing
• Proficient in resource optimization, & team leadership for successful project execution.
• Utilize MS Office Suite, AutoCAD, SolMetric, and Aconex for optimal workflow & communication.
• Microgrid Solar Power plant installation at sheybarah Island 10-1, SD and DRO (18MWp Total)
• Installation of biofuel ICE systems about 100MW
• Grid Rings Connected Construction of 2 Solar Forms SF1 (122MWp) & SF2 (266MWp)
• Involved in the Construction of 110KV substations and other related auxiliary works.
• Coordinate the construction, Site Engineers and subcontractors for safe and efficient delivery of electrical scope.
• Installation of BESS Battery Energy storage systems of about 1200 MWh (386 at SF1, 388 at SF2 and 386 at COV)
• Ensured safety goals are achieved on the project and oversee implementation of safety procedures
• Installation of all BESS compulsory equipment such as PCS (Power Converter system), Battery Container, Smart transformer station (STS), UPS and Auxiliary Transformers
• Review the work progress daily for all electrical activities on site and ensured that the project timeline is being followed.
• Review the project in-depth to schedule deliverables and coordinate with the client to expedite the approval of submitted construction activities like, Method statements, Material Approval Requests (MAR) and technical permits.
• Ensure Compliance with quality construction standards, specifications, and the use of proper installation techniques.
• Ensuring on-site safety compliance, cleanliness, and orderliness in all activities ongoing.
• Raised RFIs to clear any ambiguity in the drawings.
• Prepare and submit weekly Progress reports to client and Companys management.
• Preparation of TOPs
• Working for the clearance of snags (Punch) Lists as per comments from the owner
• Installed extensive grounding mesh systems, ensuring safety and equipment protection in high-voltage environments.
• Executed cable pulling, panel installation, and cable termination, enabling reliable power delivery within demanding 5x660MW steam turbine facilities.
• Led the installation of high-capacity transformers, contributing to efficient power conversion and system stability.
• Implemented comprehensive lighting and lightning arrestor systems, enhancing operational safety and minimizing downtime.
• Utilized and maintained overhead cranes for safe and efficient handling of heavy electrical equipment.
• Skilled in power systems analysis, grounding, switchgear, distribution panels, and Site testing.
• Leveraged MS Office Suite and AutoCAD for project documentation, planning, and design.
• Possess additional knowledge of FinFan coolers, air compressors, and strong communication & teamwork skills.
• Empowering sustainable growth by delivering proven renewable energy solutions from 5kW residential setups to 300kW commercial projects
• Managed the implementation of 300kWp systems at DHA Bahawalpur and 760kW at Multan Garrison, demonstrating expertise in large-scale solar installations.
• Increased energy security for clients, achieving significant cost savings through optimized on-grid systems.
• Designed efficient solar systems using industry-standard software, ensuring optimal energy production.
• Performed site surveys, procured materials, conducted technical reviews, and handled grounding, erection, and commissioning tasks.
• Ensured transparent project execution with comprehensive documentation for each stage.
• Seamlessly connected systems to the grid for immediate energy utilization and cost reduction.
• Optimized material usage and ensured long-term system integrity through accurate cable sizing and proper material handling.
• Implemented robust structures and expertly handled solar module installation for maximum energy capture.
• Maintained organized and safe electrical connections for reliable system operation.
• Oversaw the assembly, installation, and start-up of all 25 MW Power plant equipment, ensuring timely and successful completion within project constraints.
• Managed the logistical planning, unloading, storage, and commissioning of relocated engines (4 Wartsila Engines (6.125MW each), maximizing efficiency and minimizing downtime.
• Led the installation and commissioning of a Waste Heat Recovery System, contributing to significant energy savings and improved plant performance.
• Successfully installed and commissioned 8 (Fincoil®) radiators, enhancing cooling capacity and system reliability.
• Utilized Microsoft Project to plan and track daily activities, ensuring adherence to execution plans and achieving project milestones on schedule.
• Conducted thorough inspections of all electrical and mechanical components, guaranteeing conformity with OEM manuals and Wartsila standards.
• Generated daily reports for clients, kept them informed through daily meetings, and adapted plans to meet evolving site requirements.
• Managed the design and construction of a new Dyeing and finishing Unit, meeting client deadlines and budget requirements.
• Optimized team performance through effective planning and allocation of tasks, ensuring project targets were met efficiently.
3), optimizing performance and ensuring reliable power generation.
• Oversaw the operation of Nigata engines (5.9MVA X 4) and various alternator models (Caterpillar 3512, AVK, TOYONAKI, Stamford), demonstrating proficiency with diverse equipment.
Electrical Power and system automation