Adrian Rimniceanu, Technical Manager

Adrian Rimniceanu

Technical Manager

Alcoda S.R.L

Location
Romania - Ploiesti
Education
Master's degree, Management for Manufacturing & Repairing Petroleum and Petrochemical Equipment
Experience
8 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :8 years, 8 Months

Technical Manager at Alcoda S.R.L
  • Romania - Ploiesti
  • My current job since November 2020

Managing all technical aspects for Reverse Pyrolysis (Kerosene and Diesel from PET).

Project Construction Manager at LTTS (Larsen & Toubro)
  • Romania
  • March 2020 to September 2020

• Supervision of installation works of processing equipment, like unloading skids, bulk tanks, storage tanks, tank farm, transfer skids, pipe racks, piping (outside and inside), connection to pipe racks, skid mounted equipment (cooling, pumps, compressors, etc.)
• Reviewing construction methods, manpower, material, equipment requirements
• BIM clashes analysis
• Activity planning and coordination of suppliers and resolving scheduling issues.
• Monitor adherence to project plans and quality standards
• Managed the day to day interfacing between assigned projects of the Project Engineers and the disciplines of Process, Piping, Civil / Structural, E&I and Mechanical together with the PMC Construction Team
• Enforce construction safety standards.
• Records keeping and field change management
• Monitoring of manpower and lifting equipment, scaffolding utilization
• Commissioning and performance testing;
• Participation in vendor acceptance tests - preparation of the test protocol, execution, documentation of the tests.

Project Construction Manager at GIW Romania
  • Romania
  • June 2013 to December 2017

Project: Reconditioning, revamping and start-up Plopeni Waste Oil Plant.
• Managed all mechanical related Engineering, Procurement, Installation and Construction of the project; Ensured that all projects are delivered on-time, within scope and within budget.
• Managed construction and maintenance of temporary facilities.
• Monitored the assigned construction scope to ensure that the company and contractors perform all work to the agreed standards for safety, health and environment, and demonstrate a commitment to attain high levels of HSE (Health, Safety & Environment) performance;
• Actively participated in and advise on all construction activities and initiatives, including provision of training / inductions, documentation reviews, etc.
• Managed to develop close working relationships between all assigned construction team members and the HSES team to provide a consistent approach and effective resolution of issues, and encourage the same degree of cooperation within the Contractor organization;
• Coordinated with all project stakeholders, especially with customers, to facilitate project execution with minimum disruption and hazard to personnel and ongoing operations via the various EPC package construction teams;
• Ensured assigned activities and scope of work is carried out without any significant HSE incidents
• Maintained a good working relationship with the clients and sub-contractors engineering representatives
• Was in charge for site engineering activities and providing technical assistance to the construction supervision team
• Served as primary contact with the project office to ensure site is in receipt of latest drawing, specifications and information
• Assisted in the resolution of technical queries arising on site; Supervise vendor representatives site unit for check out / pre-commissioning of equipment and any other special testing or maintenance requirements;
• Fully familiar with the drawings, specifications and engineering procedures of the project; Acted as ultimate technical authority in Static Equipment Design, Engineering and Selection.
• Assisted in the review and approval of sub-contractors method statement; In charge for approval of final “as built" drawings
• Implemented the company safety policy and the arrangements described in the company and area safety management documents.
• Reviewed project studies and proposals for constructability and / or construction hazard identification.
• Ensured all preparatory work is completed prior to commencement of work; was responsible for manpower resource allocation and utilization on construction projects to ensure productivity is achieved on each project, duties included the recruitment of all personnel for the construction department; Provided expert advice and guidance to Engineering Management on the development of corporate guidelines that involves the static equipment input for piping, pipelines, rotating equipment and process packages, including issues such as advice on technical queries through different projects phases up to commissioning and also troubleshooting during operation.
• Ensured accurate progress and weekly reported of physical scope completion;
• Attended contractor progress meetings; ensured that the PMC construction team maintains efficient and effective communications between the Contractor and PMC and all contract reporting requirements are achieved; responded to, and evaluate field changes with assessment of any impact on cost and schedule in timely manner;
• Conducted work site inspections and ensure quality of work meets contract standards
• Participated in joint walk downs of systems / sub-system handover for pre-commissioning and commissioning teams
• Provided support to commissioning department for functional commissioning
Managed a team of 2 mechanical engineers, 1 process engineer, 32 welders, fitters, sand blasters, painters, crane operators.

Education

Master's degree, Management for Manufacturing & Repairing Petroleum and Petrochemical Equipment
  • at UPG (Petroleum & Gas) University, Ploiesti, Romania
  • April 2008

Management for Manufacturing & Repairing Petroleum and Petrochemical Equipment

Bachelor's degree, Technological Equipment for Refineries Faculty
  • at UPG (Petroleum & Gas) University
  • May 1997

Technological Equipment for Refineries Faculty

Diploma, Splicing Process Technician Diploma
  • at “1 Mai” Industrial High School
  • June 1983

Splitting Processing Technician Diploma

Specialties & Skills

Pipelines
Mechanical Maintenance
Project Management
piping construction
MS Office Suite
Project Management
AutoCad Plant 3D
Construction Manager Mechanical
Piping Construction
Complex Problem Solving
Storage Tanks Construction
Skid Mounted Equipment
Pipe Racks
Navisworks

Languages

English
Expert
French
Intermediate
Italian
Intermediate

Hobbies

  • Photography, IT, skiing