Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Ahad Satti, Static Equipment Engineer

Ahad Satti

Static Equipment Engineer·Saudi Basic Industries Corporation - Sabic

Saudi Arabia

Bachelor's degree, Mechanical Engineering

Work experience

Total years of experience: 16 years, 9 months

Static Equipment Engineer

June 2015 - Present

Saudi Basic Industries Corporation - Sabic

Jubail, Saudi Arabia

June 2015 - Present

WORK RESPONSIBILITIES
o Ensured safe work practice by the implementation of SABIC’s Safety, Health and Environment Management (SHEM) procedures.
o Served as Sub Element Administrator SHEMS 07.06 (Car Seals and Blinds) of SAFCO Plants.
o Provided technical and engineering support to the maintenance staff on various activities by ensuring proper application of work instructions, procedures and good engineering practices.
o Employed technical, engineering and execution support to the maintenance staff for static equipment and piping.
o Developed / reviewed maintenance plans and procedures for Static equipment and piping
Provided Technical support during turn around. Developed turnaround maintenance scope. Prepared TA reports specifying work accomplished general condition of the equipment and future recommendations.
o Reviewed and approved the repair scope and execution with the IR Staff and contractor / vendor.
o Participated in (ACA) Asset Criticality Assessment to Reevaluate Asset criticality for the entire system utilizing SABIC Risk Matrix followed by (RCM) Reliability centered maintenance analysis to optimize the maintenance program of equipments.
o Monitored and Maintained Maintenance KPIs, PM plans and Tasks, Evergreen lists, RCM / RCA recommendations and stocks requirement for the Plant.
o Preparation of Maintenance Budget including major plant activities and capital spare refurbishment.
o Monitored and analyzed equipment performance, SAP historical data, inspection reports and other field data in order to develop SMART recommendations optimizing life cycle cost.
o Developed and reviewed MOCs and CAPEX projects. Reviewed technical proposals for new equipments and modification to existing installations.
o Created Maintenance operation, equipment / piping Scope of Work and BOM in SAP. Ensured inventory level. Minimized investment in spare parts inventories thus reducing maintenance cost.
o Carried out successful RCAs of different failures as per the guidelines of SABIC’s RCA Methodology utilizing PROACT Software.

Company industry:
Petrochemicals & Refined Petroleum Products Manufacture
Job role:
Engineering

Project Engineer

September 2009 - May 2015

Fatima Fertilizers Company Limited

Pakistan

September 2009 - May 2015

WORK RESPONSIBILITIES
o Employed technical knowledge, design methodology, and appropriate tools and resources to design various components to meet specified criteria of the plant as per Codes & Standards (API 650, API 620, ASME B31.3, ASME B 16.5, API 530, ASME Section VIII Div 1, TEMA, DIN, Plant Specs etc).
o Employed technical knowledge in the re-rating and assessment of high pressure piping & equipments using API 579, API 510, API 653, API 941 etc.
o Scheduled and monitored project & design activities in order to achieve an “on-time”, “in budget” and “optimized” Mechanical Package that included follow-up with all the relevant Departments to ensure timely response to action items.
o Technically reviewed the Basic and Detail Engineering documents for various projects with leading companies e.g. Krupp UHDE, DESCON etc.
o Preparation of RFQ, follow up with vendor and summarizing technical bid evaluation
o Technically reviewed and analyzed Vendor design proposals, specifications, manuals and other data to evaluate the feasibility, cost, operational and maintenance requirements of designs or applications in line with the site conditions, operating parameters and Codes & Standards.
o Coordinated Project Meetings with relevant interfaces to collect and disseminate information to draftsman pertaining to Process Packages / MOC.
o Technically reviewed Piping Layouts, Isometrics, bill of material, Pipe supports, Materials of construction, Design Conditionsin accordance with the plant specifications and International standards (UHDE, CFI, K-Plant, Kellogg, CF Braun, SWS etc.)
o Technically reviewed Structural Layouts, Connection Details Drawings and Bill of Materials in line with the Plant specifications and International Codes and Standards.
o Coordinated the collection and dissemination of technical information between/within all the relevant interfaces including presentation of IFC Mechanical Packages in Functional Review and Sub HSE M Meetings.
o Investigated equipment failures and difficulties to diagnose faulty operation, and to recommend design modifications to eliminate machine or system malfunctions to all the relevant interfaces.
o Carried out Stress Analysis & Allowable Nozzle Flexibility of critical piping using AUTOPIPE.
o Carried out Structural Analysis of Sheds, Pipe- Racks, Mono-rails and Platforms using STAAD-PRO.
o Carried out Re-rating and Design of Vessels, Exchangers and Tanks using MICROPROTOL.
o Designed and carried out calculations for different Box ups to attend the online leakages.
o Prepared Welding Procedures and Repairing Techniques based on AWS, ASME B31.3 and ASME Section VIII as per the requirements of the area.
o Carried out Assessment / calculations of furnace outlet headers and catalyst tubes based on API 530, ASME B31.3 using Larson-Miller Curves of Metal Tek, S&C etc.
o Carried out troubleshooting to eliminate piping vibrations using practical Engineering Solutions.

Company industry:
Petrochemicals & Refined Petroleum Products Manufacture
Job role:
Engineering

Education

National University Of Sciences & Technology

August 2009

August 2009

Bachelor's degree, Mechanical Engineering

Pakistan

GPA (point): 3.51 out of 4

GPA (point): 3.51 out of 4

3.51 / 4.00 Earned scholarships for obtaining GPA above 3.5. PAKISTAN REFINERY LIMITED INTERNEE MAINTENANCE DEPARTMENT JULY 2008 – AUGUST 2008 Observed the day to day maintenance of both Rotary and Stationary Equipments including valves, Turbines, Compressors, Pumps, Heat Exchangers, Furnaces, and Boilers etc. DESCON INTERNEE PRODUCTION DEPARTMENT JULY 2007 – AUGUST 2007 Observed the fabrication of different Pressure vessels, Heat exchangers, Towers, Boilers etc.

Skills

SAP
Expert
SAP
Expert
PMP
Expert
PMP
Expert
Piping
Expert
Piping
Expert
Equipment Design
Expert
Equipment Design
Expert
structure
Expert
structure
Expert
MS Excel
Intermediate
MS Excel
Intermediate
MS power point
Intermediate
MS power point
Intermediate
Oracle
Beginner
Oracle
Beginner
MS word
Intermediate
MS word
Intermediate
Auto CAD
Intermediate
Auto CAD
Intermediate
STAAD PRO SOFTWARE
Intermediate
STAAD PRO SOFTWARE
Intermediate
AUTO PIPE SOFTWARE
Intermediate
AUTO PIPE SOFTWARE
Intermediate
MICROPROTOL
Intermediate
MICROPROTOL
Intermediate
SAP
Expert
SAP
Expert
PMP
Expert
PMP
Expert
Piping
Expert
Piping
Expert
Equipment Design
Expert
Equipment Design
Expert
structure
Expert
structure
Expert

Languages

English
Intermediate
Urdu
Expert

Training and Certifications

Certifications
Certified Maintenance & Reliability Professional
Project Management Professional
Feb 2015 - Feb 2018
Show credentials

Training
Weldability of Metals
Pakistan Welding Institue
Oct 2011
Show credentials