Distribution Engineer
Sui Northern Gas Pipelines Ltd
Total years of experience :16 years, 9 Months
• Operation of the gas distribution network at optimum level
• Maintenance of gas network and replacement of old network
• Control of overtime to minimum possible level with proper planning and ensure the Zero rework.
• Implementation of ISO 14001/9001 in the department
1. Multistage Centrifugal Compressors \[API Design\] Installation, Commissioning, Maintenance and Overhauling. \[Make: Mitsubishi Heavy Industries Japan\]
2. Multistage Steam Turbines (Impulse/Reaction/Condensing/Back Pressure/Extraction/ Admission) \[API Design\] Installation, Commissioning, Solo Run Test, Maintenance and Overhauling. \[Make: Mitsubishi Heavy Industries Japan\]
3. Steam Turbines ( Single Stage, Impulse, Back Pressure) \[API Design\] Installation, Commissioning, Maintenance and Overhauling. \[Make: Dresser-Rand USA, Tuthill Coppus USA\]
4. Reciprocating Air Compressors (Single Stage Double Acting) \[API Design\] Maintenance and Overhauling. \[Make: Sanco Japan, Atlas Copco Belgium\]
5. Screw Compressors (Two Stage Oil Free) \[API Design\] Maintenance and Overhauling. \[Make: Atlas Copco Belgium, AIRMAN Japan\]
6. Steam Turbines (Multistage Condensing) \[API Design\] Maintenance and Overhauling. \[Make: Shinko Industries Japan\]
7. Multistage Steam Turbines 11.5MW (Impulse, Condensing) \[API Design\] Maintenance and Overhauling. \[Make: AEG Germany\]
8. Gas Turbine 7.5MW (Multistage, Single Shaft, Open Cycle) \[API Design\] Installation, Commissioning and Maintenance. \[Make: Turbomach Switzerland\]
9. Centrifugal and Positive Displacement Pumps (Multistage/Single Stage) \[API Design\] Installation, Commissioning, Maintenance and Overhauling. \[Make: Flowserve Japan, KSB Pakistan, Goulds USA\]
10. Seals including Mechanical Seals \[API design\] and Dry Gas Seals \[API design\] Installation, Maintenance and Repair.
\[Make: Flowserve Japan, John-Crane UK\]
DAKHNI GAS PROCESSING PLANT IS THE FIRST LARGEST PROCESSING FACILITY OF OGDCL SITUATED IN DISTT. ATTOCK. THE CURRENT DAILY PRODUCTION IS ABOUT 52 MMSCFD GAS, 1600 BBL CRUDE OIL, 10 TON LPG, 70 TON SULPHUR AND ALSO HAVING POWER GENERATION CAPACITY OF 5 MW.
• Maintenance of Plant Equipments in view of OEM recommendations and condition monitoring, ensuring high equipment/plant availability through their efficient and safe operation and installation of new equipment. Improvement in plant availability/reliability by continuous condition monitoring, keeping track of maintenance jobs, currently in process to switchover to CMMS.
1. Rate running contracts for maintenance services with local authorized agents.
2. Development of preventive maintenance schedules of plant rotary equipments specially Gas Turbines and Gas Engines.
3. Co-ordination with plant professionals, different vendors and companies to streamline the plant operations and to resolve any maintenance/repair issue or equipment failure in optimum way to reduce the Plant downtime.
• To assist the maintenance team during overhauling of Caterpillar engines, Flowserve Centrifugal pumps, TB5000 (Siemens) Gas turbines, Worthington Air Compressors, Tuthill air blowers and different types of heat exchangers.
Annual Shut Downs: Currently responsible for providing assistance and supervision for development of ATA Plans, arrangement of all material / consumables / machinery and finally its execution.
3. Procurement of spares/consumables/tools/scaffolding material etc. for Annual Turn Around.
4. Physical participation in ATA.
5. Arranging contract/hired/rental services for different machines like Crane etc.
BE Mechanical ( Aggrigate= 85%) with Honor 3rd Position in Mechanical Engineering (2003-2006) Merit Scholership of Matriculation (2000)