أحمد السويداني, Vice President ISCO Company

أحمد السويداني

Vice President ISCO Company

Installations Systems for Trading and Contracting Co.

البلد
المملكة العربية السعودية - القصيم
التعليم
دبلوم عالي, Mechanical Engineering, Power
الخبرات
21 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 2 أشهر

Vice President ISCO Company في Installations Systems for Trading and Contracting Co.
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ سبتمبر 2020

My roles as vice president is business development, marketing, strategic management, projects’ sales, projects management, and leading project teams during the construction of the projects ( Budgeting, initiating, planning, executing, monitoring and controlling, and closing).

Studies & Designing Department Manager في Al-Watania Poultry
  • المملكة العربية السعودية - بريدة
  • أبريل 2015 إلى سبتمبر 2020

My roles and responsibilities were Project Management for Preliminary studies, Feasibility studies, Final studies, Costing, Tendering, Systems Analysis, Complete engineering works, and Executing for all projects of the company such as Layer farms, Breeder farms, Broiler farms, Hatcheries, Feed mill plants, Processing plants, Further Processing plant, Rendering plants, Water Treatment plants, Accommodations and Sales branches with all facilities. The main projects were as follow:
 Qatar Integrated Poultry Project: Complete feasibility study (Technical and finical) for poultry integrated project, 40, 000Tn Broiler meat per year and 7.5Tn egg mass per year, which it included (Layer Farms, Broiler Farms, Feed mill Plant, Manure plant, Hatchery, Processing Plant, Further processing plant, Rendering plant, Water treatment plant and accommodations with utilities and facilities).
 Hatchery-8: with capacity of 370, 000 Egg/day, the supplier of hatchery equipment was PasReform.
 Rendering Plant-2: with capacity of 24 Tn/hr raw materials (Feather and Soft offal's), the supplier of equipment was Mavitec.
 Water Treatment plant-2: with capacity of 6, 000 m3/day, the supplier of equipment was Nijhuis.
 Parent or Breeder Farms (Rearing and Production).
 Upgrade Layer Project: two Rearing farms 6 houses for each, two Production farms 18 houses for each, and two Egg stations to produce 1, 500, 000 Egg/day, the supplier of equipment was Big Dutchman and Moba.
 Broiler Farms & Houses: Complete broiler farms 12 houses in each and separated 120 broiler houses in the existing farms.
 Further Processing plant: one Line 2 Tn/Hr, the supplier of equipment is Marel and BBC.
 Upgrade processing plant-3: 3 lines for each line from 7, 000 bird/hr to 12, 000 bird/hr; the supplier of equipment is Stork/Marel.
 Family Compound: 40 villas of 3 types with all facilities and utilities.
 Bachelor accommodations.
 Upgrade Refrigeration Systems of Processing Plant-2: the supplier was Al Salem Johnson Controls
 Al-Madina Sales Branch: it includes cold stores, freezer stores and administration building.

Tendering and Studies Department Manager في Al-Watania Poultry Co.
  • المملكة العربية السعودية - القصيم
  • مارس 2012 إلى أبريل 2015

My roles and responsibilities were Project Management for Preliminary studies, Feasibility studies, Final studies, Costing, Tendering, Systems Analysis, Complete engineering works, and Executing for all projects of the company. The main projects were as follow:
 Hatchery-7: with capacity of 255, 000 Egg/day, the suppliers of hatchery equipment were Hatchtech and Viscon.
 HatchBrood project: 4 units as trial, the suppliers of hatchery equipment was Hatchtech and Viscon.
 Feed Mill Plant-4: with capacity of 75 Tn/hr, the supplier of equipment was Muyang.
 Rendering Plant-1: with capacity of 18.5 Tn/hr raw materials (Feather, Blood and Soft offal's), the supplier of equipment was Haarlsev.
 Upgrade Waste Water treatment plant-1: from 4, 000 m3/day up to 7, 000 m3/day, the supplier of equipment was Redox.
 Parent or Breeder Farms (Rearing and Production).
 Broiler Farms & Houses: Complete broiler farms 12 houses in each and separated 120 broiler houses in the existing farms.
 Marinated plant: 2 Lines, each line capacity is 50 tray/min, one line is for whole chicken and the other for portions, the suppliers were Marel and GMondini.
 Bachelor accommodations.

Site Mechanical Engineer في Salman Al-Terais & Partners Construction Ltd. Co.
  • المملكة العربية السعودية - الرياض
  • يوليو 2008 إلى فبراير 2012

I was responsible for project management, redesigning, and executing all mechanical works and submittals such as chilled water, HVAC system, plumbing, firefighting system and others, as following projects’ details:
1. Academic Staff Housing at Mouzahmighia:
/60/ Buildings with landscape, its cost was around/700/millions SAR.
I was responsible for doing all the following works:
 Manage, redesign, and execute all works of drainage system for buildings and prepare drawings and submittals.
 Manage, redesign, and execute all works of water supply system for buildings; prepare drawings, hydraulic calculations, and submittals.
 Manage, redesign, and execute all works of HVAC system for buildings; prepare drawings, cooling load calculations, and submittals.
 Manage, redesign, and execute all works of firefighting system for buildings, prepare drawings, and submittals.
 Manage, redesign, and execute all works of landscape drainage system, prepare drawings, hydraulic calculations, and submittals.
 Manage, redesign, and execute all works of landscape water supply system, prepare drawings, hydraulic calculations, and submittals.
 Manage, redesign, and execute all works of landscape firefighting system, prepare drawings, hydraulic calculations, and submittals.
 Manage and prepare all mechanical material's submittals for consultant.
 Manage and prepare as built Drawings for all mechanical works and systems.

2. Public Pension Agency extension Building:
One building, its cost was around /75/ millions SAR.
I was responsible for managing and executing all mechanical works and submittals such as chilled water, HVAC system, plumbing, firefighting system and others.

Mechanical Engineer في Directorate of Technical Service” for Syrian government
  • سوريا - دمشق
  • أبريل 2004 إلى ديسمبر 2007

Mechanical Consultant Engineer, I was responsible for overseeing renovation works and executing of all mechanical works for school buildings such as HVAC systems and firefighting.

Department Chief في Wattar Co.
  • سوريا - دمشق
  • أكتوبر 2003 إلى مارس 2004

Mechanical engineer, I was responsible for two production lines for assembling ovens and washing machines.

Refrigerating Engineer في Al-Hafez Co.
  • سوريا - دمشق
  • أغسطس 2002 إلى أغسطس 2003

Mechanical engineer, I was responsible for overseeing efficiencies and performance of all coolers, refrigerators inside the factory.

الخلفية التعليمية

دبلوم عالي, Mechanical Engineering, Power
  • في Damascus University
  • نوفمبر 2004

Reborn Power (Solar Power)

بكالوريوس, Mechanical Engineering, Power
  • في Damascus University
  • يونيو 2003

Specialties & Skills

Industrial Engineering
Refrigeration
Plumbing
Firefighting
Analysis
Feasibility Studies
AutoCAD
Mechaniacl Calculation Programs
Ms Office
Risk Management
Communications
Projects Management
Negotiations
Meetings Management
Leadership
Team Working
Strategic Planning

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس

العضويات

Project Management Institute (PMI)
  • Member
  • November 2017
Saudi Council of Engineers ( SCE)
  • Engineer
  • July 2011

التدريب و الشهادات

Project Management Professional (PMP) (الشهادة)
تاريخ الدورة:
November 2018
صالحة لغاية:
November 2024
PMI-RMP ( Risk Management Professional) (الشهادة)
تاريخ الدورة:
March 2019
صالحة لغاية:
March 2025
PMI-RMP Exam Preperation course (تدريب)
معهد التدريب:
Udemy
تاريخ الدورة:
November 2018
المدة:
30 ساعة
Preperation Course for PMP 6th Edition (تدريب)
معهد التدريب:
UDEMY
تاريخ الدورة:
October 2018
المدة:
42 ساعة
Projects' Budgets and Cost Management (تدريب)
معهد التدريب:
Expertise Training Forum Center
تاريخ الدورة:
August 2018
المدة:
21 ساعة
Crisis and Risk Management (تدريب)
معهد التدريب:
Expertise Training Forum Center
تاريخ الدورة:
July 2018
المدة:
21 ساعة
System Components Low Temperature Refrigeration systems System Application (تدريب)
معهد التدريب:
Industrial Refrigeration School Training - Johnson Controls
تاريخ الدورة:
February 2018
المدة:
32 ساعة
Organizing and Distributing Works (تدريب)
معهد التدريب:
Total Business Solution
تاريخ الدورة:
February 2018
المدة:
14 ساعة
Preperation Course for PMP 5th Edition (تدريب)
معهد التدريب:
Professional Sky Training Center
تاريخ الدورة:
February 2015
المدة:
36 ساعة
Strategic Planning (تدريب)
معهد التدريب:
Total Business Solution
تاريخ الدورة:
February 2018
المدة:
14 ساعة

الهوايات

  • Sports
  • Reading
  • Walking with thinking