مدير عام مشاريع
نجم الجنوب
Total years of experience :22 years, 6 Months
متابعة المشاريع والتنسيق بين الادارات والمكتب الفني والاشراف علي المشتروات ودراسة العطاءات
2- From January 2005 up to Mai 2008
(K.S.A)
EMPLOYER: SOUTH STAR EST.FOR CONTRACTING.
JOB DESCRIPTION: PROJECT MANAGER.
PROJECT NAME: FACULTY OF DAWA
VALUE OF WORK: 53 MILLIONS S.R
OWNER: ISLAMIC UNIVERCITY-MADINAH MONAWRAH
DESIGNER: DAR AL-RIYADH
Consultant: AL-BEEAH Planners, Architects& Engineers
Brief Description: The area of project 15000M2, 30000M3 ready-mix concrete for: : 1 - main building, four stories includes offices and classrooms
: 2 - water tank.
: 3 - chiller plant.
Precast cladding, (terrazzo & marble) tiles.
- EPDM& rigid insulation
-Electrical works: earthling system, BMS, fire alarm, lighting, telephone system, and sound system
-Mechanical works: sanitary &water supply networks, chiller plant, heating ventilating air condition, power generation, plumbing domestic cold & hot water installation, elevators and sprinkler -fire protection system.
Responsibilities
Overall administration, Supervision of Civil Construction and Electro-Mechanical installation, Re Viewing Technical Office out puts, interim statements material laboratory tests, follow-up Project Schedules preparing Claims, Co-ordinates with owner and consultant.
3 - From October' 2001 to December '2004. (EGYPT)
EMPLOYER: ATIC FOR CONTRACTING & ENGINEERING
COMPANY.
JOB DESCRIPTION: PROJECT MANAGER.
PROJECT NAME: MAWARDI DEVELOPMENT.
VALUE OF WORK: 10MILLIONS L.E.
OWNER: Cairo Govern.
Consultant: Dr. Mustafa Al-Ghamrawi office.
Brief Description: Excavation 5 meter deep, replacement Soil to Gravel
: Two Buildings imply Bus Station in Ground Level & Two floors have 150 Shops.
: Residential Building of 7th floors including flats & office.
: Electrical and Mechanical works.
: Asphalt Roads.
: Under Ground Water Tanks.
Responsibilities:
Overall administration, Supervision of Civil Construction and Electro-Mechanical installation, Re Viewing Technical Office out puts, interim statements material laboratory tests, follow-up Project Schedules preparing Claims, Co-ordinates with owner and consultant.
4 - From May' 1999 to October '2001. (EGYPT)
EMPLOYER: ARABIAN GENERAL CONTRACTING
COMPANY.
JOB DESCRIPTION: PROJECT MANAGER.
PROJECT NAME: SWISS RESORT (SHARM EL-SHEKH)
PROJECT VALUE: 120MILLIONS L.E.
OWNER: M.M. METAWI.
CONSULTANT: ENVAIRO-CIVIC (Dr. Diaa-El-Menery)
BRIEF DESCRIPTION: the area 6600sqm Implies 10 Villas, 256 Rooms,
Swimming Pools, Sports area, Restaurant & Health
Club.
: Supply and install Sewer & Water Network.
: Supply and install Electrical Networks and Mechanical
Works.
Responsibilities:
Overall administration, Supervision of Civil Construction and Electro-Mechanical installation, follow-up Project Schedules, supervision of Con-Contractor and Co-Ordinates with owner and Consultants.
5 - From July' 1995 to April '1999. (K.S.A)
EMPLOYER: MINISTRY OF P.T.T (Engineering & Construction Dept)
JOB DESCRIPTION: CIVIL ENGINEER.
Responsibilities:
Civil works, Estimating and Costing for Project, Revision, Quality Control of projects & Planning for Telephone Network.
6 - From April' 1992 to July '1995. (K.S.A)
EMPLOYER: ANWAR AL-KHALIJ EST.
JOB DESCRIPTION: SITE MANAGER.
PROJECT NAME: HOSPITAL & RESIDENTIAL BUILDINGS
PROJECT VALUE: 4 MILLIONS (Saudi Riyals)
OWNER: INTERIOR SECURITY FORCE.
BRIEF DESCRIPTION: Construct Hospital for Office's Family and Residential
Building 3 Floors.
Responsibilities:
Overall administration, Supervision of Civil Construction interim-statements, follow-up Project Schedules and Co-Ordinates with Owner.
7 - From December '1990 to April' 1992. (EGYPT)
EMPLOYER: EGYPTIAN ARAB CONTRACTING COMPANY.
JOB DESCRIPTION: CIVIL ENGINEER.
PROJECT NAME: SEWAGE NETWORK FOR WEST BANK
(IMBABA)
PROJECT VALUE: 12 MILLIONS (L.E)
CONSALTANT: AMBRIC
BRIEF DESCRIPTION: Supply and install Sewer Pipe lines.
: 12000 L.M PVC Pipes Dia 160mm.
: 9515 L.M.Vitrified Clay Dia 175-600mm.
: 461 L.M. R.C. Pipes Dia 800mm.
: Supply and install 446 Pre-Cast M.H Depths from : 1.20 to 7.00meter Dia from 1200mmto 1800mm.
Responsibilities:
Estimating & costing for the project accessories, accessories scheduling follow-up the Site works, interim-statements for the Sub Contractors.
8 - From June '1988 to December' 1990. (EGYPT)
EMPLOYER: ENGINEERING FORCE.
JOB DESCRIPTION: OFFICER ENGINEER.
PROJECT NAME: KASER-EL-QUBA BRIDGE.
OWNER: CAIRO GOVERN
CONSALTANT: AHMED MOHROM OFFICE.
BRIEF DESCRIPTION: Construct Steel Bridge has Composite Section Column,
Piles Footings.
: The Bridge has 5km long.
: Asphalt & Roads for the Bridge and the Surrounded
Area.
Responsibilities:
- Supervision of Construction Concrete Works.
- Supervision of Construction Base Course and Layers of Asphalt.
- (Binder Coors and Surface Course)
- Quantity surveying for the project stages.
9- From September '1987 to June' 1988. (EGYPT)
EMPLOYER: CONSALTANT ENGINEERING
LABORATORYS.
JOB DESCRIPTION: QUALITY CONTROL ENGINEER.
PROJECT NAME: AGHA KHAN TOWERS.
PROJECT VALUE: 10 MILLIONS (L.E.)
CONSALTANT: Dr. FAEK HOIDY OFFICE.
BRIEF DESCRIPTION: 22 Floors Tower, Piles Foundations concrete cast in
Site by Patch Plant.
Responsibilities:
- Quality control for concrete.
- Design of concrete mixes.
I hope that my CV will be considered favorably and would be very good if you deem it useful to receive me an interview or to produce you any additional required information.
Thanking you.
With best regard.
بكالريوس هنسة مدنية تقدير عام جيد وتقدير مشروع جيد جدا ضبط جودة خرسانة
• Planning of Construction Projects. • Diploma in Business Management from Cambridge College. • Project Management Professional&Trainning Courses Member Ship: Syndicate of Egyptian Engineers.