Total Years of Experience: 26 Years, 2 Months
June 2005
To Present
Project Manager
at Alunasa for aluminum and glass company
Location :
Qatar
Job Description:
Main aluminum systems Schuco (Germany), Installux (France), Alunasa system and Gulf extrusion.
Coordination between technical department, consultant and main contractor.
Submitted shop drawings and material submittal for approval.
Prepared fabrication & installation bar chart.
Arranged the material & man power as site requirements.
Monitored the procurements material flow as site requirements.
Prepared the invoices as B.O.Q requirements and followed payments.
-insured of cash flow distribution based on prepared cost sheet for all the project
Major Project Supervised:
- Major Jobs on hand
-Doha Mall (Abo Hamour)
jobs completed
- Woqod Tower 3B+G+M+30 floor
-Ezdan Mall Al Gharafah
-Qatar navigation tower (2B+G+52 Floors) unitized shuco system 34000 m2
- Doha Bank Head Quarters (2B+G+25floors) Alunasa System
West Bay (B+G+44fl.) Tower (14600 m² curtain wall Schuco Germany)
Q.I.C. Office Tower (2B+G+20fl.) (6000m² curtain wall Schuco Germany) 9000m² Alum. Cladding Aluclad Japan.
Al Arabi Sport Club (Installux France).
- Movenpick Hotel (B+G+25 FL.) Schuco system
Main aluminum systems Schuco (Germany), Installux (France), Alunasa system and Gulf extrusion.
Coordination between technical department, consultant and main contractor.
Submitted shop drawings and material submittal for approval.
Prepared fabrication & installation bar chart.
Arranged the material & man power as site requirements.
Monitored the procurements material flow as site requirements.
Prepared the invoices as B.O.Q requirements and followed payments.
-insured of cash flow distribution based on prepared cost sheet for all the project
Major Project Supervised:
- Major Jobs on hand
-Doha Mall (Abo Hamour)
jobs completed
- Woqod Tower 3B+G+M+30 floor
-Ezdan Mall Al Gharafah
-Qatar navigation tower (2B+G+52 Floors) unitized shuco system 34000 m2
- Doha Bank Head Quarters (2B+G+25floors) Alunasa System
West Bay (B+G+44fl.) Tower (14600 m² curtain wall Schuco Germany)
Q.I.C. Office Tower (2B+G+20fl.) (6000m² curtain wall Schuco Germany) 9000m² Alum. Cladding Aluclad Japan.
Al Arabi Sport Club (Installux France).
- Movenpick Hotel (B+G+25 FL.) Schuco system
June 2002
To May 2005
planning & analyses
at Petra company for aluminum& steel company
Location :
Jordan - Amman
*created bar chart for production and installation
* monitored the the materials flow and sites conditions
*insured the quality and time to reach the mile stone
* monitored the the materials flow and sites conditions
*insured the quality and time to reach the mile stone
March 1998
To May 2002
manufacturing& maintenance
at JORDAN CEMENT FACTORY
Location :
Jordan
*performed maintenance for all types of machiens
*fabrication drawings and methods for fabrication
*estimated bar charts for maintenece and fabrication
*follow up materials & man power available
*fabrication drawings and methods for fabrication
*estimated bar charts for maintenece and fabrication
*follow up materials & man power available