Ahmad Shakshok, Project Manager

Ahmad Shakshok

Project Manager

COSMOS-E

Lieu
Egypte
Éducation
Master, Project Management
Expérience
31 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :31 years, 1 Mois

Project Manager à COSMOS-E
  • Egypte - Le Caire
  • Je travaille ici depuis novembre 2020

1-Revise work shop drawings
2- Validate materials submittals
3- Revise invoices
4- Solve technical issues
5- Submit and revise proposals
6- Manage teamwork
7- Support site staff
8- Follow up prohramme
9- Apply contract

Deputy Project Director à East Center Engineering Consultants (ECEC)
  • Arabie Saoudite - Riyad
  • Je travaille ici depuis juillet 2017

Participate in fixing strategies, targets and general policies of the firm, following up performance of programme, solving issues with related parties, managing resources, evaluate feasibility of projects.

Senior Civil Engineer à Dar Al-Handasah (shaier and Parterners)
  • Arabie Saoudite - Riyad
  • septembre 2015 à octobre 2016

The position as a vise PM for a project Wadi Sulai to protect against torrants by construction the suitable box culverts and steel pipes in parallel with earth works to conform the required depths and slopes.
My role is to coordinate with contractors and the owner, solving problems, resolving conflicts, arranging and attending meeting, advise teamwork, issue monthly reports.

project manager à Cosmos-E (Engineers&Consultants)
  • Egypte - Le Caire
  • janvier 2007 à août 2015

Working as Project Manager for the following projects:-
• Villa Ghabbour project in the Cairo-Alex Desert road.
• New Exhibition& Maintenance workshop for HUNDAI Auto.
• Suez Steel Company.
• Edita for Food Industries.

my job is to supervise and check of all construction works for the projects, ensure of application of all conditions of specifications and bill of quantity for the project, reviewing structural shop drawings, reviewing the monthly invoices, reviewing quantity surveying, applying approved variation orders, monitoring and controlling execution, quality control, time schedule in accordance with the requirements of the project and also coordinate and communicate with all related stakeholders.
(Grand Total 40, 000, 000.00 LE)

Construction manager à Universal Contracting
  • Egypte - Le Caire
  • août 2006 à janvier 2007

.Working as executive manager for a tourism project in Marsa-Alam, my job was executing the main building for a mall, control recourses and teamwork, control cost, manage subcontractors, co-ordination with the consultant ( 5, 000, 000.00LE

project manager à Al-Naim Consulting
  • Arabie Saoudite - Riyad
  • avril 2004 à juillet 2006

• Supervising all concrete and civil works, reviewing the consultant's drawings and identify all structural conflicts. - Discuss and resolve the structural conflicts with the consultant office designer, to submit the revised drawings to the production team for the detailed and working drawings. The project was a five stars hotel owing to the GOSI and consists of two basements, ground floor, mezzanine, and 14 typical floors, elevated tank and helipad. (15, 000, 000.00SR).

Project manager location: Aljouf

• Responsible for a project owing to General organization for social insurance (GOSI) the total amount of the project is 13.0 million SR. I was responsible for checking of all civil works monitoring and controlling the execution process, approving of submittal drawings, monthly reports, monthly invoices, applying time schedule of the project and leading a team work of arch. Eng., elect. Eng. and Forman.(40, 000, 000.00SR)

Senior construction engineer à Arab Bureau For Design &Technical Consultations
  • Egypte - Le Caire
  • avril 1994 à avril 2004

supervising all concrete, civil works, finishing works, preparing the monthly work invoice, analyzing prices for several items of the projects, making the quantity surveying for the items I responsible for . The projects were several administrative buildings owing to the ministry of interior. The finishing works was five star finishing such as Italian marble, ceramic, false ceilings, very high quality paints, high quality wall paper, ..Others.(Grand Total of 300, 000, 000.00LE)

executive civil engineer à Tawfikia for Construction
  • Egypte - Le Caire
  • août 1992 à avril 1994

The project was delivered as turn key, my job was Execution of all concrete works from the foundation works, columns, typical floors and also finishing works such as masonry works, plaster, ceramic, marble, plumbing, painting, .....etc.(4, 000, 000.00LE)

Éducation

Master, Project Management
  • à Entrepreneurship Business University
  • mars 2022

Master of Business Administration : Module 1 : Project Management Module 2 : General Management Module 3 : Financial Analysis& Accounting Module 4 : Quality Management& Six Sigma Module 5 : Human Resource Management Module 6 : Operations& Supply Chain Module 7 : Marketing Module 8 : Sales Module 9 : Strategic Planning Module 10 : Entrepreneurship Module 11 : Leadership Module 12 : Economic& International Business

Diplôme, Project Management
  • à American University in Cairo
  • juillet 2009

Post graduate diploma in project management (PRMG)

Baccalauréat, Civil Engineering
  • à Cairo University
  • novembre 1992

GPA (PASS 60%) Projct : Very Good

Tests de Bayt.com

English for Business Skills Test
Score 75%

Specialties & Skills

Project Management
Industrial Buildings
Residential Buildings
Public Buildings
Infrastructure
Leadership
Motivation
Communications
Decision Making
Negotiation
Team Building
Problem Solving
Compter Knowledge

Langues

Anglais
Expert
Français
Débutant
Arabe
Langue Maternelle

Adhésions

Syndicate of Engineers
  • 2538/18
  • November 1992
Engineering Management Society
  • أ /121
  • October 2007
Saudi Council of Engineers
  • Professional Engineer
  • October 2015

Formation et Diplômes

PMP Preparation Coarse (Formation)
Institut de formation:
American Chamber
Date de la formation:
January 2008
Durée:
36 heures
Soft Skills (Formation)
Institut de formation:
FUJESTU
Date de la formation:
January 2007
Durée:
90 heures
FIDIC (Formation)
Institut de formation:
Manegement Engineering Society (MES)
Date de la formation:
May 2008
Durée:
36 heures

Loisirs

  • Forex, walking, horror movies, watching foot ball