Ahmed Al-Amoudi, Sr.Project Engineer

Ahmed Al-Amoudi

Sr.Project Engineer

Bothar Boring and tunneling

Lieu
Qatar - Doha
Éducation
Baccalauréat, Civil Engineer
Expérience
13 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :13 years, 3 Mois

Sr.Project Engineer à Bothar Boring and tunneling
  • Qatar - Doha
  • Je travaille ici depuis décembre 2014

Core Responsibilities:
• Responsible for ensuring that all activity meets both internal company standards and external
regulatory requirements with respect to health, safety and the environment to ensure the company's obligations and policies in these areas are fully complied with.
• Supervising Projects, monitoring, other third parties and ensuring that all assigned work is completed on time and within agreed budgets.
• Setting out Project works in accordance with drawings & specification.
• Ensuring all the Micro tunneling drives is within the specification and requirements
• Operate the AVN Machine 800, 1000, 1200, 1400 and monitor the machine while driving.
• Chose the location and the suitable length /Dia for the tunneling with coordination with the designer.
• Shaft Excavation and Grouting the tunneling and insure all the work handle to client on Time with Excellent Quality

Sr.Site Engineer à boom construction company
  • Qatar - Doha
  • juin 2011 à novembre 2014

Core Responsibilities:
• Supervise the projects that are handled by the company, monitor the project assure that it is done in full accordance with the plans and specifications and that all the RFI is submitted and put the schedule for the look ahead program in way that the work done properly on time with the minimum resources.
• The work mainly in infrastructural items such as gully, soak-ways, manhole, House connection, pipe laying for Qtel, electrical, street lighting That done accordance to stander details also road work from subgrade until wearing course.Setting out Project works in accordance with drawings & specification.
• Handling the finishing items from Edgekerb, subbase, wash sand and interlock.
• Sub-structure and super structure work from Foundation until finishing work.
• Design and build work industrial compound.
• Concrete and steel work for many structure elements monitor people do the work with a required time frame.

Site engineer à rasem nofal contracting company
  • Jordanie - Amman
  • octobre 2010 à janvier 2011

supervise on building

Éducation

Baccalauréat, Civil Engineer
  • à Hashemite University
  • juin 2011

3.79 out of 4

Specialties & Skills

Client Representation
Schedule Planning
Site Planning
Schedule Analysis
Microsoft Software
DATA ANALYSIS
Excellent communication Skills
Project Management

Langues

Anglais
Expert

Adhésions

نقابة المهندسين الاردنين
  • مهندس مدني
  • June 2011

Formation et Diplômes

PMP (Formation)
Institut de formation:
PMI
Primevera P6.7 (Formation)
Institut de formation:
JEA

Loisirs

  • Football, BingBall