Project Engineer
Wood Al-Hejailan Comapny
Total years of experience :13 years, 1 Months
Worked in Facilities Engineering Group (ITFEG).
- Elite Software Commercial Heating, Ventilating and Air Conditioning “CHVAC”.
Worked in ARAMCO Projects - Mechanical Department in Fire Protection.
- BI-10-01284, Upgrade Firewater Piping at Safaniya Onshore Plants.
- BI-10-01036, Vapor Recovery Unit - Major Bulk Plants (Detail Design).
- BI-21-00069, Fuel Gas Pipeline and Metering Station - Polyoxymethylene Project.
Fire Fighting Systems Layout & Section.
Isometric Piping.
Mechanical Details.
Hydrostatic Test Diagrams.
Material Take Off (MTO).
Worked in ARAMCO Projects - Mechanical Department in Fire Protection.
- EWO#12C135A, Safety Assessment.
- EWO#13C138, Updating Tower Computer Center (TCC) Infrastructure Drawings.
- EWO#13C079, Update & Create As-Built Drawings For All ECC.
Fire Fighting Systems Layout & Section.
Isometric Piping.
Mechanical Details.
Material Take Off (MTO).
Pressure vessel as per ASME standard.
Storage tanks as per API 650.
Preliminary design, edge plans and drawing activities for the acquired works and at the stage of proposal preparation.
Design & Detail drawing of Pipe sleeve, Pipe supports and Platforms.
Material Take Off (MTO).
Worked in Mechanical Department:
Design shapes to cut cardboard.
with the second honor degree