Maximum upload file size: 3MB. File types allowed: jpg, jpeg, gif only.

Click the above 'Browse' button to select a photo.
Guidelines
  1. Only upload a photograph of yourself
  2. Photos of children, celebrities, pets, or illustrated cartoon characters will not be approved
  3. Photos containing nudity, gore, or hateful themes are not permissible and may lead to the cancellation of your account
  4. Photos of your passport, ID, or photos containing any personal information such as your address, passport number, or contact details are not permissible for your own security.

Delete Guidelines

MUBARAK AL-MUBARAK

Deputy Director

Al-Mousa Car Spare Parts and Gas Cylinder Shops.

Location:
Saudi Arabia - Eastern Province
Education:
Bachelor's degree, System engineer Automation
Experience:
33 years, 0 months

Work Experience

What's your work experience? Your experience is one of the most important sections in a CV.
List all relevant responsibilities, skills, projects, and achievements against each role.  If you're a fresh grad, you can add any volunteer work or any internship you've done before.
Add Experience

Total Years of Experience:  33 Years, 0 Months   

July 2017 To Present

Deputy Director

at Al-Mousa Car Spare Parts and Gas Cylinder Shops.
Location : Saudi Arabia - Eastern Province
- Management an enterprise's activity and staff in order to attain company goals.
- Implementing budget SR 50 Million and company procedures, maintaining inventories, ensuring a constant flow of resources, and evaluating business performance.
- Aided business development efforts, developed processes, and played a key role in driving revenue growth SR 5 Million.
- Reviewed and analyzed reports on periodic expenditures.
February 2010 To July 2017

PROJECT ENGINEER SPECIALIZED INSTRUMENT

at SAUDI ARAMCO SMP wiith QAHTANI COMPANY
Location : Saudi Arabia - Eastern Province
1- BI-10-1423 - Replace Ras Tanura Terminal South Control System, Saudi Aramco.
2- BI-10-00953 - Replace Process Analyzers, Saudi Aramco - RasTanura Refinery.
3- BI-10-00609 - Replacing Old Foxboro System by New Yokogawa Control System in Area 48 and Replaced Old Foxboro System by Honeywell System with Associated Subsystem in Area 232, Saudi Aramco - RasTanura Refinery.
4- BI-0068 - Installation Online Viscometer Analyzer for Paving, Plant-15, Saudi Aramco - RasTanura
Refinery.
November 2007 To November 2009

INSTRUMENTATION ENGINEER

at SAMSUNG ARABIA
Location : Saudi Arabia
1- Petrochemical Advance Polypropylene Company (APPC), AL- Jubail
2- BI-10-0065 - Diesel Hydrotreating, Saudi Aramco - RasTanura Refinery.
3- Design Engineering Office (IK-EPC) - Al Khober.
September 2003 To November 2007

INSTRUMENTATION ENGINEER

at Saudi Aramco PMT contractor with Al-Hoty Establishment
Location : Saudi Arabia - Eastern Province
1- BI-10-03194 - Replace the old system (Foxboro) to new system Honeywell for Natural Gas Liquid
(NGL), Saudi Aramco - RasTanura Refinery.
2- BI-0068 - Additional Asphalt Handling Facility, Saudi Aramco - Ras Tanura Refinery
June 2002 To July 2003

INSTRUMENTATION ENGINEER

at Saudi Aramco PMT through Lummus Ali Reza Co
Location : Saudi Arabia - Eastern Province
BI-10-03503 - Khuff Condensate Upgrading, Saudi Aramco, Ras Tanura Refinery.
December 1990 To June 2002

Maintenance Foreman (Inst., Electrical & Electronics)

at Maadaniyah Co
Location : Saudi Arabia - Eastern Province
- Diagnosing & troubleshooting wire, PC-strand and Galvanization machines breakdown hardware & software.
- Calibration Air/Gas ratio for Burners
- Maintain the sensor like (Thermocouple type K or resistance thermometer), controller setting parameter, Level Control, pH Control and Control Valve (Pneumatic & Electrical type)
- Verify the calibration for Weighting Scale (Calibration platform scale, digital type, brand schember and soehnle)
- Maintained computer controlled processes such as communications, network cards, wiring, software and hardware system of PLC (Siemens) PG 710, and made changes in the programming according to the operation requirement.
- Prepared and implemented preventive and condition based maintenance, and repaired major instrumentation and electrical problems and diagnose.
- Maintained appropriate inventory of parts for equipment preventing extended down time for rides and facilities.
- In electrical field maintain the Frequency converter unit for AC motor like, Current source intermediate circuit and Voltage source intermediate circuit.
- Create preventive maintenance periodical schedule for High voltage 34.5KV, Medium voltage 13.8KV, Utility Plant and Fire Fighting.

Education

What's your educational background?
Let employers know more about your education; remember, be clear and concise.
January 1990

Bachelor's degree, System engineer Automation

at KFUPM
Location : Saudi Arabia - Eastern Province
Grade: 2.6 out of 4
Automation

Specialties & Skills

Maintenance

Instrumentation Engineer

project engineer

Construction

Project Manager

Construction Management

Project Management

Maintenance Engineering

Project Engineering

Instrumentation

Languages

Do you speak more than one language?
For some jobs, fluency in one or more foreign languages is a plus, so add your language skills to get better results.

English

Expert

Loading
Loading...
Loading...