Project Controls Manager
MMAH
مجموع سنوات الخبرة :11 years, 11 أشهر
• Lead and support project controls team.
• Develop Project Budget.
• Cost monitoring and control.
• Develop Project Baseline, Recovery, and Revised Schedule.
• Schedule monitoring, control, and reporting.
• Delay analysis and claims.
• Fidic Contracts management.
Planning Engineer at KAP2B.J. TSC/ site 17
Responsibilities
Develop the Project Schedule Baseline.
Prepare a recovery and Revised Schedule.
Extension of Time Claims ( EOT ).
4D 5D Planning using Synchro and Navisworks.
Prepare the related layouts & reports.
Receiving all updates on Daily, Weekly, Biweekly basis and update The Program.
Preparing Daily, Biweekly and Monthly Report. Preparing earned value report.
Preparing The Risk Register on monthly basis. Issuing the target of work and follow it up on monthly basis.
Direct and Manage Structure and Arch. Work. Quantity Surveying and Invoices.
Prepare Manpower Daily Report and Productivity Reports.
Instructor at the High Institute
Of Engineering 6 October.
Teaching Materials Such As Structure,
Foundations and Building Constructions.
MBA
BSC in civil Engineering (Excellent with honors). Project grade: Excellent (residential building, tank, hall). I used to study hard during my university stage. I had many Appreciation Certificates. In addition, because of my high qualifications and grades, I was admitted as a demonstrator In the university before changing my career.